|
| 1 | Items |
| 2 | Mojo Barricading Per running Ft. |
| 3 | Tin Barricading Per running Ft. |
| 4 | Metal railingsheet Per running Ft. |
| 5 | Stage Per Sq. Ft. |
| 6 | Steps with Railing |
| 7 | Platfrom on Stage Per Sq. Ft. |
| 8 | Pipe railing Per running Ft. |
| 9 | Console Platform Per Sq. Ft. |
| 10 | Camera Platform Per Sq. Ft. |
| 11 | Black Cloth Partition Per meter |
| 12 | Wooden Platform Per Sq. Ft. |
| 13 | Side wing Per Sq. Ft. |
| 14 | Podium best Quality |
| 15 | Camera Riser Per Sq. Ft. |
| 16 | Stage Skirting Per Sq. Ft. |
| 17 | Partition Draping Per meter |
| 18 | Scaffolding 12 Ft Ht. |
| 19 | Green Room with AC Per Sq. Ft. |
| 20 | Green Room non AC Per Sq. Ft. |
| 21 | VVIP Green Room with AC Per Sq. Ft. |
| 22 | VVIP Green Room non AC Per Sq. Ft. |
| 23 | Quick Change Room Per Sq. Ft. |
| 24 | Artist Green Room Per Sq. Ft. |
| 25 | LED Screen Platforms Per Sq. Ft. |
| 26 | Que Maneger 4 Ft Each Per Sq. Ft. |
| 27 | Crane with Operator Per Shift |
| 28 | THEMATIC STAGE ERECTION AT VENUEPer Project |
| 29 | THEMATIC 3D INSTALLATIONS/SELFIE POINTS (Per installation/selfie point - apprx. 12 ft x 16 ft with lights & flower décor) |
| 30 | Sofa One seater |
| 31 | SofaTwo seater |
| 32 | Sofa Three seater |
| 33 | Steel Sofa with Cover |
| 34 | Sofa One seater |
| 35 | SofaTwo seater |
| 36 | Sofa Three seater |
| 37 | VVIP chair |
| 38 | Dunlop Chair with cover |
| 39 | Plastic Chair |
| 40 | Table with Frills2 x 1/2 |
| 41 | Round Table4 Ft. Diameter |
| 42 | Teapoy |
| 43 | Remote with Curten for Inaugration Per Sq. Ft. |
| 44 | Pagoda 6mtr x 6mtr |
| 45 | Pagoda with platform and carpet for Rooms 6mtr x 6mtr |
| 46 | Food Canopy |
| 47 | Food Mandap Per Sq. Ft. |
| 48 | EventMandap 14 ft height Per Sq. Ft. |
| 49 | EventMandap 14 ft to 18 ft height Per Sq. Ft. |
| 50 | EventMandap Above 18 ftheight Per Sq. Ft. |
| 51 | Water Proof Food Mandap Per Sq. Ft. |
| 52 | Water Proof Event Mandap 14 ft height Per Sq. Ft. |
| 53 | Water Proof Event Mandap 14ft to 18 ft height Per Sq. Ft. |
| 54 | Water Proof Event Mandap Above 18 ft height Per Sq. Ft. |
| 55 | Octonorma Stall3 Mtr x 3 Mtr |
| 56 | DOMEAC 30 mtr x 60 mtr |
| 57 | DOMEAC 30 mtr x 80 mtr |
| 58 | DOME NON AC 30 mtr x 60 mtr |
| 59 | DOME NON AC 30 mtr x 80 mtr |
| 60 | Net Carpet Per Sq. Ft. |
| 61 | Synthetic Carpet Per Sq. Ft. |
| 62 | Par Light |
| 63 | 1 watt |
| 64 | 3 watt |
| 65 | Haze and Smoke Machine |
| 66 | Opearting consoles unit |
| 67 | Sharpies |
| 68 | 575 watt |
| 69 | 1.2 watt |
| 70 | 2.5 watt |
| 71 | 575 watt |
| 72 | 1.2 watt |
| 73 | 2.5 watt |
| 74 | 1 watt |
| 75 | 3 watt |
| 76 | 4 Bulb |
| 77 | 8 Bulb |
| 78 | 1.2 watt |
| 79 | 2.5 Watt |
| 80 | Gobo (fire,water,Forest) |
| 81 | Fire Roller Effect |
| 82 | Power Pack |
| 83 | Avolite Lighting Board |
| 84 | Dimmer Boards and Dimmer Packs |
| 85 | Signal and power cables |
| 86 | Electrical points |
| 87 | AC Connection |
| 88 | Halogen 1000W |
| 89 | Halogen 500 W |
| 90 | Mercury Lamp 200 W |
| 91 | Metal Halide 400W |
| 92 | Plug Board 15A |
| 93 | Cabling For Above |
| 94 | Tube Light |
| 95 | Mixer, Digital (48 Channel Mixer) |
| 96 | Sound System |
| 97 | 500 to 3000 People |
| 98 | 4000 to 8000 People |
| 99 | 9000 to 15000 People |
| 100 | Up to 25000 |
| 101 | Up to 100000 |
| 102 | P.A System |
| 103 | Monitor Speakers |
| 104 | Crossover (Control System Processor) |
| 105 | Power Amplifire |
| 106 | Cordless Mike |
| 107 | Laple Mike |
| 108 | Head Set Mike |
| 109 | Podium Mike |
| 110 | Musician Mike |
| 111 | Di- Box |
| 112 | Laptop For Music Play at Console |
| 113 | CD/ DVD Player |
| 114 | 500 to 1000 People |
| 115 | 1000 to 2000 People |
| 116 | 2000 to 4000 People |
| 117 | 4000 to 8000 People |
| 118 | 9000 to 15000 People |
| 119 | Up to 25000 |
| 120 | Up to 100000 |
| 121 | Prestigious Awards (Customized) |
| 122 | Metal Trophies |
| 123 | Crystal Trophies |
| 124 | AcrylicTrophies |
| 125 | WoodenTrophies |
| 126 | Plaques |
| 127 | Salvers |
| 128 | Fiber Trophies |
| 129 | Felicitation material (Shawl, Coconut, etc.) |
| 130 | PR Manager (Per Project) |
| 131 | Lighting Designer (Per Project) |
| 132 | Technical Person (crew)(Per Day) |
| 133 | Helper (Per Day) |
| 134 | Photoshop Artist (Photo Editing)(Per Photo Edit) |
| 135 | Show Director (Per Project) |
| 136 | DOP (Per Project) |
| 137 | Cameraman (Video)(Per Day) |
| 138 | Mekeup Artist + One Assistance (Per Day) |
| 139 | Camera Operator (Per Day) |
| 140 | Camera Attendant (Per Day) |
| 141 | Production Managar (Per Project) |
| 142 | Hair Stylist + OneAssistant (Per Day) |
| 143 | Dressman (Per Day) |
| 144 | Costume Designer (Per Day) |
| 145 | Online editor (Per Day) |
| 146 | Light man (Per Day) |
| 147 | Telepromter Operator (Per Day) |
| 148 | Camera with Photographer (with lences) (HD quality - Per Day) |
| 149 | Camera with Videographer with lences (Full HD - Per Day) |
| 150 | Camera with Videographer with lences (4K - Per Day) |
| 151 | Online Mixer |
| 152 | Editing (Event Program video - Per project) |
| 153 | Photo Album (of maximum 300 pics) |
| 154 | Jimmy Jib (32 ft) |
| 155 | Drone (8 Hours) |
| 156 | Ronin\"s Gimble |
| 157 | Camera wire (Per Mtr) |
| 158 | Connector |
| 159 | Sound Recording equipment |
| 160 | External HDD - 4 Tb LaCie |
| 161 | Event Inauguration Video |
| 162 | Duracell |
| 163 | Edit Machine (Per Day) |
| 164 | Telepromter |
| 165 | Generator 125 Kv (with fuel & opreator)(6 hours) |
| 166 | Generator 63 Kv (with fuel & opreator) (6 hours) |
| 167 | Generator 30 kv (with fuel & opreator) (6 hours) |
| 168 | Flat Gate (Per Sq. Ft.) |
| 169 | Box Gate (Per Sq. Ft.) |
| 170 | Welcome Theme Gate erection |
| 171 | CCTV Camera Analog (Dahua & Hikvision) Bullet Camera |
| 172 | CCTV Camera Analog (Dahua & Hikvision) Dome Camer |
| 173 | IP Camera (Dahua & Hikvision) Bullet Camera |
| 174 | IP Camera (Dahua & Hikvision) Dome Camera |
| 175 | PTZ CameraAnalog |
| 176 | PTZ CameraIP |
| 177 | DVR |
| 178 | Monitoring System |
| 179 | Recording Backup equipment |
| 180 | Technical person Per Project |
| 181 | LED TV52 \"\" |
| 182 | HDD 2TB internal |
| 183 | Connector |
| 184 | Wire Per Mtr |
| 185 | C Clip |
| 186 | Power Supply |
| 187 | Office Station with Printer, WIFI, Laptops (Per Project) |
| 188 | Office Operating Person (Per Day) |
| 189 | Complete Stationery for office work |
| 190 | Housekeeping Male (8 Hour Shift) |
| 191 | Housekeeping Female (8 Hour Shift) |
| 192 | Supervisor (8 Hour Shift) |
| 193 | Big Dustbins |
| 194 | Small Dustbins |
| 195 | Garbage bag Big (1 packet) |
| 196 | Garbage bag small (1 packet) |
| 197 | Garbage van Mini Van |
| 198 | Male Bouncer (8 Hour Shift) |
| 199 | Female Bouncer (8 Hour Shift) |
| 200 | Male Guard (8 Hour Shift) |
| 201 | Lady Guard (8 Hour Shift) |
| 202 | Supervisor (8 Hour Shift) |
| 203 | Metal door Detected (Per Day) |
| 204 | Hand metal Detector (Per Day) |
| 205 | Bag Scanning machine (Per Day) |
| 206 | Fire Extinguisher (Per Day) |
| 207 | Fire Marshal (Per Day) |
| 208 | Walkie talkie (Per Day) |
| 209 | Clear Com (Per Day) |
| 210 | Sand bucket (Per Day) |
| 211 | Water drum (Per Day) |
| 212 | Water Tanker (Per Day) |
| 213 | Jcb (for leveling) |
| 214 | Road Roller |
| 215 | Chemical Toilet |
| 216 | Normal Toilet |
| 217 | Luxury Toilet |
| 218 | Toilets for specially abled |
| 219 | Toilet Van |
| 220 | House keeping Material (Per Project) |
| 221 | Event Director (Per Project) |
| 222 | Art Director (Set Designing) (Per Project) |
| 223 | Event Planner (Per Project) |
| 224 | Execution & Logistic Manager (Per Project) |
| 225 | Assistant (Per Project) |
| 226 | Creative Director (Conceptulization & execution) (Per Project) |
| 227 | Assistant (Per Project) |
| 228 | Host (Per Day) |
| 229 | Hostess(Per Day) |
| 230 | Hostess For Reception (Per Day) |
| 231 | RSVP Person (Per Day) |
| 232 | Project Co-ordinator (Per Day) |
| 233 | Traffic Wardens/ Volunteers (Per Day) |
| 234 | Male (Marathi) (Per Day) |
| 235 | Female (Marathi) (Per Day) |
| 236 | Celebrity Male (Marathi) (Per Day) |
| 237 | Celebrity Female (Marathi) (Per Day) |
| 238 | Male (Hindi) (Per Day) |
| 239 | Female (Hindi) (Per Day) |
| 240 | Celebrity Male (Hindi) (Per Day) |
| 241 | Celebrity Female (Hindi) (Per Day) |
| 242 | Male (English) (Per Day) |
| 243 | Female (English) (Per Day) |
| 244 | Celebrity Male (English) (Per Day) |
| 245 | Celebrity Female (Engilsh) (Per Day) |
| 246 | Invitation single page (A4 & A5 ) |
| 247 | Invitation cards - F & B - One Fold (A4 & A5 ) |
| 248 | Invitation cards - F & B - Two Fold (A4 & A5 ) |
| 249 | Envelope (A4 & A5 ) |
| 250 | Badges, Car Passes, ID card & Name Plate |
| 251 | Pamphlets(A4 ) |
| 252 | Standee (3 FT x 6 FT) |
| 253 | Box Gate |
| 254 | Normal Gate |
| 255 | Backdrop |
| 256 | Print Creative (25cm x 33cm) |
| 257 | Print Ad adaptation (lumpsum) |
| 258 | Event Branding (10 ft x 20 ft) |
| 259 | Kiosk (Upto 20 inches x 30 inches) |
| 260 | Posters (Upto 20 inches x 30 inches) |
| 261 | Designing of Power Point Presentation (Upto 50 slides) |
| 262 | Writing Articles Upto 300 words |
| 263 | Invitation single page with envelope A5 |
| 264 | Invitation cards - F & B - One Fold with envelope A4 |
| 265 | Invitation cards - F & B - Two Fold with envelope A4 |
| 266 | Invitation cards - F & B - One Fold with envelope A5 |
| 267 | Invitation cards - F & B - Two Fold with envelope A5 |
| 268 | Badges 75mm |
| 269 | Pamphlets A4 |
| 270 | Car Passes etc, 15cm |
| 271 | Foldable Standees 3 ft x 6 ft |
| 272 | ID card & Less Good Quality |
| 273 | Kiosk 2ft x 3ft |
| 274 | Posters Upto 20 inches x 30 inches |
| 275 | Normal Flex Per Sq. Ft. |
| 276 | Star FlexPer Sq. Ft. |
| 277 | Wooden FramePer Sq. Ft. |
| 278 | Metal Frame Per Sq. Ft. |
| 279 | Star Flex Sinages Per Sq. Ft. |
| 280 | Normal Flex Sinages Per Sq. Ft. |
| 281 | Sunpack Sinages 5mm |
| 282 | Sunboard Sinages 5mm |
| 283 | Welcome BouquetBig |
| 284 | Welcome BouquetSmall |
| 285 | Stage Flower RunnerPer Sq. Ft. |
| 286 | Flower Cylinders 2 Ft |
| 287 | Flower Pot Small |
| 288 | Flower Toran Per Sq. Ft. |
| 289 | Flower Haar Small |
| 290 | Flower HaarBig |
| 291 | Rose with wrapping Multi Color |
| 292 | Floral Stand with Flower |
| 293 | Led Screen -3 mm Per Sq. Ft. |
| 294 | Led Screen - 3.9 mmPer Sq. Ft. |
| 295 | Led Screen - 4.8 mm Per Sq. Ft. |
| 296 | Graphics /Animation for Led |
| 297 | 42 inch |
| 298 | 50 inch |
| 299 | 65 inch |
| 300 | Laptop |
| 301 | Projector |
| 302 | Water Bottle (Mineral Water 250 ml) |
| 303 | Tea - Regular |
| 304 | Tea - A1 |
| 305 | Tea - Premium (with special crockery) |
| 306 | Coffee - Regular |
| 307 | Coffee - A1 |
| 308 | Coffee - Premium (with special crockery) |
| 309 | Dryfruits Bowl - 100 grm each For VVIP (Almonds, Pistachios, Cashews, Raisins) |
| 310 | Samosa/Kachori/Vada |
| 311 | Chutney Sandwich |
| 312 | Cheese Sandwich |
| 313 | Wafers 50 gm |
| 314 | Soft Drink bottle (250 ml) |
| 315 | Sweet |
| 316 | Trio homes Plastic Insulated Water Camper |
| 317 | Lunch |
| 318 | High Tea |
| 319 | Dinner |
| 320 | F&B serving crew (Per day) |
| 321 | Lunch |
| 322 | High Tea |
| 323 | Dinner |
| 324 | Regular Lunch Thali Veg |
| 325 | Regular Lunch Thali Non Veg |
| 326 | F&B serving crew (Per day) |
| 327 | Strategist (Per Project) |
| 328 | Researcher (Per Project) |
| 329 | Concept Designer (Per Project) |
| 330 | Content writer(Per Project) |
| 331 | Script writer (Per Project) |
| 332 | CULTURAL & ENTERTAINMENT PROGRAM (Per Program) |
| 333 | REMUNERATION OF SPECIAL INVITEES |
| 334 | TV EPISODE RELEASE (22 Min & 45 Min) |
| 335 | EVENT PRE & POST PUBLICITY & MEDIA MANAGEMENT (RELEASE) |
| 336 | TV |
| 337 | Radio |
| 338 | OOH |
| 339 | Social Media(Paid Activity) |
| 340 | Social Media Execution Cost (Per Project) |
| 341 | Documentary5 to 10 min |
| 342 | Documentary 10 to 30 min |
| 343 | TVC (HD format 60 sec) |
| 344 | TVC Dubbing 60 sec. |
| 345 | Voice Over 1 to 10 min Script (Male) |
| 346 | Voice Over 1 to 10 min Script (Female) |
| 347 | Re-Editing Per Project |
| 348 | Radio Jingle 60 sec |
| 349 | Radio Spot 60 sec |
| 350 | Success Stories Upto 5 min |
| 351 | Virtual Event Technology platforms |
| 352 | Live Streaming(Facebook, Youtube, Instragram, Twitter) |
| 353 | WIFI + Internet lease line - Temporary(50 - 100 Mbps) |
| 354 | Broadband (Landline)- Temporary |
| 355 | Exhibition Panels including Fabrication,Lights & Printing ( 6 ft x 4ft ) |
| 356 | Tower AC1 ton |
| 357 | Tower AC2 ton |
| 358 | Cooler |
| 359 | Octonorma stall with fascia (1 Table & 2 ChairsWith electricity supply + 1 plug point with light & fan) |
| 360 | Pedastal Fan |
| 361 | Ceiling Fan |
| 362 | Registration Desk (Octonorma desk with branding) |
| 363 | Gas Balloon |
| 364 | Palm Tree |
| 365 | Tutari wala (2 Person - 1 unit) |
| 366 | Dhol pathak (20 to 25 Person - 1 unit) |
| 367 | T-shirts with Branding (Good Quality) |
| 368 | Umbrellas with Branding (99cm) |
| 369 | Press Kit with folders (Note pad, Folder, Pen) Good Quality |
| 370 | Full length mirror with lights |
| 371 | Hanger Stand |
| 372 | Sanitizer stand |
| 373 | Mask |
| 374 | Rangoli (lumpsum) |
| 375 | Hotel Non AC (Standard Room) |
| 376 | HotelAC (Standard Room) |
| 377 | Two Star Hotel Deluxe Room |
| 378 | Three Star Hotel Deluxe Room |
| 379 | Four Star Hotel Executive Room |
| 380 | Five Star Hotel Executive Room |
| 381 | One Door |
| 382 | Two Door |
| 383 | Three Door |
| 384 | Cardiac Ambulance (With Doctor) Per Day |
| 385 | LED MOBILE VAN(8 ft x 6 ft - Per day - 80 km) |
| 386 | FLOAT DESIGN & FABRICATION (28ft (length) x 13ft (width) x 16ft (ht) including travelling Per day - 80 km) |
| 387 | Fire Services (Per Event) |
| 388 | Labor Department (Per Event) |
| 389 | Police (Per Event) |
| 390 | City Traffic Police (Per Event) |
| 391 | Health Department (Per Event) |
| 392 | Electricity (Per Event) |
| 393 | Civil (Per Event) |
| 394 | Traffic Department (Per Event) |
| 395 | Other Concern Department (Per Event) |
| 396 | Home Ministry Noc for Foreign Artists (Per Event) |
| 397 | Prime SUV - 80 km (Per day - 8 hours) |
| 398 | Prime Sedan - 80 km (Per day - 8 hours) |
| 399 | Prime Executive - 80 km (Per day - 8 hours) |
| 400 | 30 Seater - 80 km (Per day - 8 hours) |
| 401 | 50 Seater - 80 km (Per day - 8 hours) |
| 402 | Eicher Motors Per kilometer - out of mumbai |
| 403 | Eicher Motors Local city - Per day - 8 hrs |
| 404 | 407 TATA Per kilometer - out of mumbai |
| 405 | 407 TATA Local city - Per day - 8 Hrs |
| 406 | EVENT MANAGEMENT FEES (% of Total Event Budget (Per Event) |
| 407 | EVENT MANAGEMENT FEES (% of Total Event Budget (Per Event) |