}

8-Constructed / Under Construction In Village Sonakpur And Shahpur Tigri Under Pradhan Mantri Awas Yojana (Sehri) Construction Work Of Stp Of 350 Cald Capacity For Buildings Of 496 Eaves. Civil Work, moradabad-Uttar Pradesh

Moradabad Development Authority has published 8-Constructed / Under Construction In Village Sonakpur And Shahpur Tigri Under Pradhan Mantri Awas Yojana (Sehri) Construction Work Of Stp Of 350 Cald Capacity For Buildings Of 496 Eaves. Civil Work. Submission Date for this Tender is 02-12-2022. Sewage Treatment Plant Tenders in moradabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

34978787
8-Constructed / Under Construction In Village Sonakpur And Shahpur Tigri Under Pradhan Mantri Awas Yojana (Sehri) Construction Work Of Stp Of 350 Cald Capacity For Buildings Of 496 Eaves. Civil Work
Open Tender
Indian
Uttar Pradesh
moradabad
02-12-2022

Tender Details

8-Constructed / Under Construction In Village Sonakpur And Shahpur Tigri Under Pradhan Mantri Awas Yojana ( Sehri ) Construction Work Of Stp Of 350 Cald Capacity For Buildings Of 496 Eaves. Civil Work

Key Value

Document Fees
INR 5900 /-
EMD
INR 401600.0 /-
Tender Value
INR 2 Crore /-

BOQ Items

Name of Work: CONSTRUCTION OF 350 KLD SEWER TREATMENT PLANT FORPMAY E.W.S HOUSES IN SONAKPUR AND SHAHPUR TIGRI YOJNA MBD
Sl. No. Item Description
1Earthwork- Excavation And Sand Filling Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design , building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251
2Supplying and filling with fresh Sand Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all lead & lifts including cost of all materials , labour, royalty and taxes all complete as per building specification and direction of Engineer in charge SOR 225
3Sand Gravel Mix Supplying and filling in Foundation with Sand Gravel Mix in the ratio of 1:1 with 0.685 Cum of sand and 0.667 Cum of Gravel in layers of not more than 15cm thick well rammed, watered and consolidated by using mechanical earth rammer etc. complete complying to standard specifications. DSR0293+098 Analysed Rate
4Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
5Reinforced Cement Concrete (R.C.C), M30 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in M-30 is @ 340 kg/cum) DSR/2021Total RCC SOR 5.33.1.2
6Reinforcement Supplying, fabricating and placing in position TMT bars (Fe 500) for all RCC works as per design given including cost of steel and G.I. binding wire for placing at all depths of excavation, complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel, binding wire and for bar bending) SOR 2022 SI No. 504 Total Reinforcement
7Centering/ Shuttering Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.DSR/2021. 5.9.20
8Solid Block masonry Providing and constructing precast concrete solid blocks with compresive strength not less than 35 Kg per sqm with cement mortar 1:4 masonry with soild blocks of 40x 20x 20 cms conforming to IS 2185/1965 in super structure including the cost of materials, labour charges, scaffolding, curing complete as per specification. DSR 3.9
9Tiling of inner surface Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including pointing the joints with white cement and matching pigments etc., complete Total tiling. DSR 11.40
10Plastering with mortar, 1:4 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 13.7.2
11Manhole Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality with necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of Engineer incharge)as per standard specification etc., complete compying with standard specifications Manhole.MR
12Waste water pipes Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 6 inch dia pipe. MR
13Providing and fixing mild steel grill work for screening of wastewater as per drawing including fixtures, necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of site engineer) Weld grill with vertical sloping 6 mm thick bar placed at a distance of 3 cms and dimensions of 700 mm x 600 mm
14Weld grill with vertical sloping 6 mm thick bar placed at a distance of 1.5 cms and dimensions of 700 mm x 600 mm
15Rate for Earthwork- Excavation Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251 Total
16Removal of excess earth (within 8 KM) Removal of excess excavated earth from the site and dumping away from the location. Up to 8 KM SOR/2021
17Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
18Reinforced Cement Concrete (R.C.C), M30 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in M-30 is @ 340 kg/cum) DSR/2021Total RCC SOR 5.33.1.2
19Reinforcement Supplying, fabricating and placing in position TMT bars (Fe 500) for all RCC works as per design given including cost of steel and G.I. binding wire for placing at all depths of excavation, complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel, binding wire and for bar bending) Column C1,C9,C28 and C36
20Centering/ Shuttering Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
21Plastering with mortar, 1:4 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 13.7.2
22Providing 18 mm thick cement plaster in one coat in 1:5 cement mortar mixed with water proofing agent , including scaffolding and curing and also complying with standard specifications and instructions of the engineer in charge.(Internal Plastering)
23Manhole Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality with necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of Engineer incharge)as per standard specification etc., complete compying with standard specifications 600x600
24Red Sand Stone Supplying of red sand stone slab including laying to correct alignment as direct by engineer in charge. Includes fixing the slab to support structures. Total
25Waste water pipes Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 4 Inch Dia pipe
264 inch dia T piece
274 inch elbow
28Rate for Earthwork- Excavation Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251
29Removal of excess earth (within 8 KM) Removal of excess excavated earth from the site and dumping away from the location. Up to 8 KM
30Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
31Reinforced Cement Concrete (R.C.C), M30 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in M-30 is @ 340 kg/cum)
32Reinforcement Supplying, fabricating and placing in position TMT bars (Fe 500) for all RCC works as per design given including cost of steel and G.I. binding wire for placing at all depths of excavation, complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel, binding wire and for bar bending) Column C1,C9,C28 and C36
33Centering/ Shuttering
34Plastering with mortar, 1:4 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 13.7.2
35Providing 20 mm thick cement plaster in one coat in 1:5 cement mortar mixed with water proofing agent , including scaffolding and curing and also complying with standard specifications and instructions of the engineer in charge.(Internal Plastering) DSR 13.11
36Manhole Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality with necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of Engineer incharge)as per standard specification etc., complete compying with standard specifications 600x600
37Red Sand Stone Supplying of red sand stone slab including laying to correct alignment as direct by engineer in charge. Includes fixing the slab to support structures. Total
38Waste water pipes Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 4 Inch Dia pipe
394 inch dia T piece
404 inch elbow
41Rate for Earthwork- Excavation Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251
42Removal of excess earth (within 8 KM) Removal of excess excavated earth from the site and dumping away from the location. Up to 8 KM
43Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
44Reinforced Cement Concrete (R.C.C), M30 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in M-30 is @ 340 kg/cum) DSR/2021Total RCC SOR 5.33.1.2
45Reinforcement Supplying, fabricating and placing in position TMT bars (Fe 500) for all RCC works as per design given including cost of steel and G.I. binding wire for placing at all depths of excavation, complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel, binding wire and for bar bending) Total for reinforcement
46Centering/ Shuttering Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
47Solid Block masonry Providing and constructing precast concrete solid blocks with compresive strength not less than 35 Kg per sqm with cement mortar 1:4 masonry with soild blocks of 40x 20x 20 cms conforming to IS 2185/1965 in super structure including the cost of materials, labour charges, scaffolding, curing complete as per specification DSR 3.9
48Plastering with mortar, 1:3 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 3.9.2
49Manholes Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of best approved quality with necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of Engineer incharge)as per standard specification etc., complete compying with standard specifications 600x 600
50Waste water pipes Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 110 mm dia UPVC pipes fixing
51110 mm dia UPVC-Tees fixing
52160 mm dia desludging pipe, UPVC, fixing
530.11m dia, UPVC air vent pipe with vent cowls
54110 mm dia Elbow pipe- UPVC
55Rate for Earthwork- Excavation Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251
56Removal of excess earth (within 8 KM) Removal of excess excavated earth from the site and dumping away from the location. Up to 8 KM
57Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
58Reinforced Cement Concrete (R.C.C), M30 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in M-30 is @ 340 kg/cum) DSR 5.33.1.2
59Reinforcement Supplying, fabricating and placing in position TMT bars (Fe 500) for all RCC works as per design given including cost of steel and G.I. binding wire for placing at all depths of excavation, complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel, binding wire and for bar bending) Total for reinforcement
60Centering/ Shuttering Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc. DSR 5.9.21
61Solid Block masonry Providing and constructing precast concrete solid blocks with compresive strength not less than 35 Kg per sqm with cement mortar 1:4 masonry with soild blocks of 40x 20x 20 cms conforming to IS 2185/1965 in super structure including the cost of materials, labour charges, scaffolding, curing complete as per specification
62Plastering with mortar, 1:3 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 3.9.2
63Manholes Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of best approved quality with necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of Engineer incharge)as per standard specification etc., complete compying with standard specifications 600x 600
64300x 300
65Waste water pipes Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 110 mm dia UPVC pipes fixing
66110 mm dia UPVC-Tees fixing
67160 mm dia desludging pipe, UPVC, fixing
680.11m dia, UPVC air vent pipe with vent cowls
69110 mm dia Elbow pipe- UPVC
70Rate for Earthwork- Excavation Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251
71Removal of excess earth (within 8 KM) Removal of excess excavated earth from the site and dumping away from the location. Upto 8 KM
72Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
73Reinforced Cement Concrete (R.C.C), M30 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in M-30 is @ 340 kg/cum) DSR 5.33.1.2
74Reinforcement Supplying, fabricating and placing in position TMT bars (Fe 500) for all RCC works as per design given including cost of steel and G.I. binding wire for placing at all depths of excavation, complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel, binding wire and for bar bending) Total for reinforcement
75Centering/ Shuttering Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
76Solid Block masonry Providing and constructing precast concrete solid blocks with compresive strength not less than 35 Kg per sqm with cement mortar 1:4 masonry with soild blocks of 40x 20x 20 cms conforming to IS 2185/1965 in super structure including the cost of materials, labour charges, scaffolding, curing complete as per specification
77Plastering with mortar, 1:3 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 3.9.2
78Mainholes Supplying and fixing in position CI mainnhole covers with CI frames (Heavy duty) of best approved quality with necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of Engineer incharge)as per standard specification etc., complete compying with standard specifications 600x 600
79300x 300
80Waste water pipes Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 110 mm dia UPVC pipes fixing
81110 mm dia UPVC-Tees fixing
82160 mm dia desludging pipe, UPVC, fixing
830.11m dia, UPVC air vent pipe with vent cowls
84110 mm dia Elbow pipe- UPVC
85Rate for Earthwork- Excavation Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251
86Removal of excess earth (within 8 KM) Removal of excess excavated earth from the site and dumping away from the location. Upto 8 KM
87Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
88Reinforced Cement Concrete (R.C.C), M30 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in M-30 is @ 340 kg/cum) DSR 5.33.1.2
89Reinforcement Supplying, fabricating and placing in position TMT bars (Fe 500) for all RCC works as per design given including cost of steel and G.I. binding wire for placing at all depths of excavation, complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel, binding wire and for bar bending) Total for reinforcement
90Centering/ Shuttering Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
91Solid Block masonry Providing and constructing precast concrete solid blocks with compresive strength not less than 35 Kg per sqm with cement mortar 1:4 masonry with soild blocks of 40x 20x 20 cms conforming to IS 2185/1965 in super structure including the cost of materials, labour charges, scaffolding, curing complete as per specification
92Plastering with mortar, 1:3 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 3.9.2
93Manholes Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of best approved quality with necessary welding and painting with one coat of zinc chromite primer and two coats of epoxy painting complete.(As per instruction of Engineer incharge)as per standard specification etc., complete compying with standard specifications 600x 600
94300x 300
95Waste water pipes Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 110 mm dia UPVC pipes fixing
96110 mm dia UPVC-Tees fixing
97160 mm dia desludging pipe, UPVC, fixing
980.11m dia, UPVC air vent pipe with vent cowls
99110 mm dia Elbow pipe- UPVC
100Rate for Earthwork- Excavation Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A)and disposal of excavated earth as obtained to a distance upto 10m, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I Excavation Excavation for footing SOR/2022 Total excavation SOR 251
101Removal of excess earth (within 8 KM) Removal of excess excavated earth from the site and dumping away from the location. Upto 8 KM
102Rubble solling Supplying and filling in Foundation with Sand Gravel Mix in the ratio of 1:1 with 0.685 Cum of sand and 0.667 Cum of Gravel in layers of not more than 15cm thick well rammed, watered and consolidated by using mechanical earth rammer etc. complete complying to standard specifications. DSR 0293/0982
103Plain Cement Concrete (P.C.C), 1:4:8 Providing PCC in nominal mix of 1:4:8 in foundation with approved quality of stone metal grade III (with 50mm to 25mm size graded )and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. Total PCC. SOR 2022 SI No.281
104Solid Block masonry Providing and constructing precast concrete solid blocks with compresive strength not less than 35 Kg per sqm with cement mortar 1:4 masonry with soild blocks of 40x 20x 20 cms conforming to IS 2185/1965 in super structure including the cost of materials, labour charges, scaffolding, curing complete as per specification
105Plastering with mortar, 1:3 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 with neat finish Total plastering. DSR 3.9.2
106UPVC pipes 110mm dia Providing and fixinguPVC pipes (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.)
107Filter material Providing and constructing vertical/ inclined graded filter media using clean and hard sand and coarse aggregate from approved source in layers including labour work, machinery, laying in slope and compacting etc., as per specification and drawing Provind and fiulling 20 mm down graded coarse aggregate layer (inlet and outlet)
108Supplying and filling in foundation, basement, etc with filling 3mm coarse sand
109Providing and filling 12 mm down graded coarse aggregate layer
110Supplying & Filling 40mm guauge HBGS stone jellyfor dispersion trench
111Supplying & Filling 40mm guauge HBGS stone jellyfor dispersion trench- slope 1:50
112Plants Providing and planting common reeds or other rhizome with two plant per square metre
113White wash White washing over new surface with approved quality of lime including cost of cleaning surface thoroughly and removing the scales of smoke and mosh marks with jhama rubbing , scaffolding, washing of floors and taxes all complete as per building specification and direction of E/I. SOR/2022 673
114Damp proof Course Providing PCC in nominal mix of 1:2:4 in foundation with approved quality of stone chips with 20mm to 6mm size graded and clean coarse sand of FM of 2.5 to 3 including screening , shuttering, mixing cement concrete & placing in position , striking, vibrating, curing, taxes & royalty all complete as per building specification & direction of Engineer in charge. DSR 4.10
115Waste water pipes Providing and fixinguPVC pipes betwwen the modules (Soil and waste line) of required diameter conforming to I.S.-13592, and I.S.-4985 to withstand continous internal hydroulic pressure of 6 kg/cm2 including necessary fixtures and fittings, such as bends, tees, single junctions, double junctions and joining with rubber rings and lubricants, on wall by means of clips or in ground including necessary excavation, laying refilling, trench testing etc. complete. (Prior approval of sample and brand by Engineer in charge is necessary before use.) 110 mm dia PVC pipes fixing
1164 inch elbow,collar
1174 inch bends
118Providing and fixing stainless steel erw pipes confirming to the IS standards from stabilization reactor to sludge drying bed 40mm dia
11950mm dia
120Supply, installation and commissioning of submersible sludge pump of grundfos make. Includes civil works, fabrication work for mounting the pump , neccesary plumbing with manual flow control valves, non returnable valves and spill back arrangement.
121Supply, installation and commissioning of submersible sludge pump of grundfos make. Includes civil works, fabrication work for mounting the pump , neccesary plumbing with manual flow control valves, non returnable valves and spill back arrangement.
122Supply and installation of control panel and sensor for level indication in the tank and additional sensor for dry run protection of the pump, as per specification of the pump installed as well as Commissioning the control panel with safety measurements. Includes cost of wiring, civil works and others as required for installing and commissioning the system
123Supplying and installing and comissioning the Sand and Carbon filter of size 1200mm dia and 1500mm height with 20cum/hr, including cost of setting up the foundation, pump, required electrical instrument, control panel and neccesary pipe connections
124Supply, installation and commissioning of chlorine dosing system. Consiting of 1 no. 50-lt. Chlorine storage tank made of FRP having provision of installimg dosing pump and a valve for drinage and cleaning of tank.
125Procurement, transportation and installation of sintex tank of 3000 liters capacity
126Supplying , erecting and fixing in position Pre- fabricated GI structures at all elevations for Canopy using structural GI sectionsincluding poly green house sheet roof, footing for erection, cutting, welding or bolting, supply of bolts/nuts/washers, scaffolding etc., complete as per drawings including and as per specification after erection and all materials and labour complete. ( No welding is permitted at site). The rate quoted shall include cost of bolts, nuts, washers, welding and electrodes and any other consumables required for completing the work. Nut bolts shall not be considered for payment. Also to include the cost of providing PCC footing for each column at a distance of 1 metre below ground level. Poly green house shall be braced to the structure using appropriate mechanisms such as clamps, etc.
127Supply, installation and commissioning of submersible pump of CRI make for pumping of water (1 HP) . Includes civil works, fabrication work for mounting the pump , neccesary plumbing as per the instructions of Engineer In charge.
128Electrical installation for the plant consisting of pre fabricated enclosure for placement of control pannel having approx. dim. of 3m width, 4 m depth, 4m height. The enclosure shall have provision for 1 no. exaust fan and 1 tubelight. Field cabeling of 1.5sq mm 4 core aluminium arrmoured approx 50 mt. for submersible pumps and dosing pump.
129Channel for Disposal Channel for Disposal of treated water conveyance from the plant to nearest drain. Dimmensions are 200 mm weidth 300 mm depth of approx 100 m Length.
130Channel for conveyance of over flow water and back wah water all along the plant periphery. Dimmensions are 200 mm weidth 300 mm depth of approx 200 m Length.
131Plantation for PGF Suitable plantation consisting of plant varities like Cattails, Bulrush, Citronella, Canna, Hibiscus and flowering herbs shall be provided. The plant suitabily place at a matrix of 300mm*300mm . The plants are suitabily acclimatized at vendor"s lab and facility. During acclimatization process servival ratio of plant is 50% hence for requirement of 3000 nplant of various category the total no of plant to be acclimitation is 6000.
132Additional Works payment bill be made for above mentioned item no.(10, 11, 12) as per details of actual expenditure vouchers provided by contractor andverified by E/I necessary for specific work according to side condition at the time of work execution Bioculture for comisioning and stabilization period. Unloading and sorting of media for planted gravel filter. Washing of media at site. Manually filling of media according to it size and grade. Supply and installation of inspection cum cleaning pipes across length and breadth of planted gravel filter. Sheed for filters of dimensions of 6m length 4 m width 4 height. Supply and installation of collection pipes across the width of PGF to collection chamber. Supply and installation of 100 no. PVC swivel pipe system for decanting of water in planted gravel filter bed. payment bill be made for above mentioned item no.(11 & 12) as per details of actual expenditure vouchers provided by contractor and verified by Ell necessary for specific work according to side condition at the time of work execution.
133Annual Operation & Maintainence of STP including supply of all material labour T&P etc. required for proper complition of the work. 1st year Operation & Maintainence included in conscruction cost. for 2nd year Operation & Maintainence
134Annual Operation & Maintainence of STP including supply of all material labour T&P etc. required for proper complition of the work. for 3rd year Operation & Maintainence
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail