Tender For Construction Of 03 Numbers Air Crossing For S-8 Panel In G-Iia Seam At Bagdewa Ug Mine.
Tender Value
15.07 Lakhs
Estimated cost
Bid Submission
05 Dec 2022
0 days left
EMD
18900
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
korba → Chhattisgarh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of 03 Numbers Air Crossing For S-8 Panel In G-Iia Seam At Bagdewa Ug Mine.
BOQ
| Sl. No. | Item Description |
| 1 | Groove cutting in roof/ floor (Hard Stone) for Stopping& Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) |
| 2 | Groove cutting in roof/ floor (Coal) for Stopping& Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) |
| 3 | Loading of material (Bricks) into tub on surface within a lead of 50m. |
| 4 | Loading of material (Cement) into tub on surface within a lead of 50m. |
| 5 | Loading of material (Sand) into tub on surface within a lead of 50m. |
| 6 | Loading of material (Stone Chips) into tub on surface within a lead of 50m. |
| 7 | Manual pushing of (Bricks) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead). |
| 8 | Manual pushing of ( Cement) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead). |
| 9 | Manual pushing of (Sand) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead). |
| 10 | Manual pushing of (Stone Chips) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead). |
| 11 | Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) |
| 12 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) |
| 13 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) |
| 14 | Unloading of material (Stone Chips) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) |
| 15 | Transportation/Carriage of steel structure by manual labour including loading, unloading & Stacking the same for lead up to 50 m in Underground (For each additional distance of 50 m subject to 0.50 Km maximum, there will be 14.67% enhance in rate). Materials (like steel structure etc) will be provided by the colliery management. |
| 16 | Brick work with flyash F.P.S.(non modular) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item no. 6.1.2. |
| 17 | Brick workwith flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand). DSR Item No. 6.32.2 |
| 18 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). DSR Item No. 5.3.1 |
| 19 | 12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). DSR Item No. 13.4.2. |
| 20 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. DSR Item No. 5.9.3 |
| 21 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level for Cold twisted bars. DSR Item No. 5.22.3 |
| 22 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) |
| 23 | Total impact of GST for the purpose of CTC |
AI Tender Summary
Tender Timeline
Nov 24, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedDec 05, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 06, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender