Tender For Construction Of 03 Numbers Air Crossing For S-8 Panel In G-Iia Seam At Bagdewa Ug Mine., korba-Chhattisgarh

South Eastern Coalfields Limited-SECL has published Tender For Construction Of 03 Numbers Air Crossing For S-8 Panel In G-Iia Seam At Bagdewa Ug Mine.. Submission Date for this Tender is 05-12-2022. Mining Work Tenders in korba Chhattisgarh. Bidders can get complete Tender details and download the document.




Tender Notice

34961517
Tender For Construction Of 03 Numbers Air Crossing For S-8 Panel In G-Iia Seam At Bagdewa Ug Mine.
Open Tender
Indian
Chhattisgarh
korba
05-12-2022

Tender Details

Construction Of 03 Numbers Air Crossing For S-8 Panel In G-Iia Seam At Bagdewa Ug Mine.

Key Value

Document Fees
Refer document
EMD
INR 18900.0 /-
Tender Value
INR 15.07 Lakhs /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description
1Groove cutting in roof/ floor (Hard Stone) for Stopping& Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
2Groove cutting in roof/ floor (Coal) for Stopping& Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
3Loading of material (Bricks) into tub on surface within a lead of 50m.
4Loading of material (Cement) into tub on surface within a lead of 50m.
5Loading of material (Sand) into tub on surface within a lead of 50m.
6Loading of material (Stone Chips) into tub on surface within a lead of 50m.
7Manual pushing of (Bricks) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead).
8Manual pushing of ( Cement) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead).
9Manual pushing of (Sand) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead).
10Manual pushing of (Stone Chips) tubs in underground for every 30m. or part thereof in excess of first 30m. (450m, 15 Lead).
11Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
12Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
13Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
14Unloading of material (Stone Chips) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
15Transportation/Carriage of steel structure by manual labour including loading, unloading & Stacking the same for lead up to 50 m in Underground (For each additional distance of 50 m subject to 0.50 Km maximum, there will be 14.67% enhance in rate). Materials (like steel structure etc) will be provided by the colliery management.
16Brick work with flyash F.P.S.(non modular) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item no. 6.1.2.
17Brick workwith flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand). DSR Item No. 6.32.2
18Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). DSR Item No. 5.3.1
1912 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). DSR Item No. 13.4.2.
20Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. DSR Item No. 5.9.3
21Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level for Cold twisted bars. DSR Item No. 5.22.3
22Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
23Total impact of GST for the purpose of CTC
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail