|
| 1 | G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8 metres high GIbarbed wire fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every3 metres center to center founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be struttedon both sides and end post on one side only and provided with 12 horizontal lines and2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 ) |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), includingdressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:All kinds of soil |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement:4 coarse sand (zone-lll) derived rrom natural sources :8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming,consolidating and dressing complete |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 7 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes. channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of EnBineer-in- cha.ge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framedwork, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work |
| 10 | Lettering with black Japan paint of approved brand and manufacture |
| 11 | Carriage of earth including CP & OH By Mechanical Transport including loading, unloading and stacking lead up to 1.00km |
| 12 | Total impact of GST for the purpose of CTC |