| 1 | Supply Installation, testing and commissioning of Gas crematorium with primary chamber of size 9ft.x 6ft.x 5ft, Secondary Chamber, temperature of primary chamber 800 +/- 50 deg.c, temperature of secondarychamber 1050 +/- deg.c, Fuel: LPG, door for primary chamber, burner system, Gas pipe line Made of copper/ MS with pressure gauge, insulation, Chimney 30 m height with approximate foundation structure with fittings and Lightning Arrestor, LPG gas cylinder maximum requirement of 8 cylinders for operation,Power 9kW, 3Phase connection, Emission Parameters to meet KSPCB standards, Furnace bed &structure of Stainless steel, strong , High quality alumina/ fire bricks with air holes to secondary chamber,Cremation time/body of 60-90 minutes, LPG consumption of 12 +/_ 2 kg, Wet Scrubber and cloud chamber For the removal of toxic gases and particulate matter from the secondary chamber before lettingout the emission into the atmosphere through chimney of 30 m height, Dilution system with ID Fan Tobring down further the concentration of pollutant parameters in the emissions, Combustion Air supplyWith blower for the supply of oxygen for incineration of the body in the Primary chamber and supply ofexcess air to the secondary chamber, Stretcher type trolley with rollers moving on ball bearing for easysliding in of the body into the primary chamber, Temperature sensor of Cr/A1 Thermocouple one numberin each chamber, Temperature control and indication AC Solid state digital type temperature indicatorcontroller 0-1200 deg.c in each chamber, Safety controller of Solid state non-indicating controller 0-1200deg.c in each chamber to take care of control activity in case of failure, Ash removal At rear side ofprimary chamber , scrapping by manual operation with hinged type door manually operated, all steelitems painted, with the safety measures of Non-returnable Valve to arrest the back flow of the fuel andair, Flame Arrestor to Stop the re-tracing of Smoke From the Burner Side, Pressure Gauge to Assess theavailability of Gas for Firing, Solenoid Valve System to Control the Temperature of the Furnace andProper earthing will be provided for electrical circuits as per the norms, free Maintenance for the warrantyperiod, operation training. all complete as per approved drawings and direction of engineer in charge. |