Mtps - Ii -Mechanical-Ii Circle -Coal Handling Plant-Ii Division - Daily And Routine Operation & Breakdown Maintenance Works Of Effluent Treatment And Sewage Treatment Equipments And Its Auxiliaries For A Period Of 180 Days From The Date Of Taking Over Of Site.-Charges For Carrying Out The Daily And Routine Maintenance Of Equipments In Effluent Treatment Plant Such As Effluent Re-Circulation Cum Disposal Pumps, Sewage Disposal Pumps, Cmb ( Central Monitoring Basin ) , Tilted Plate Interceptor Feed Pumps, Oily Sludge Disposal Pumps, Oily Effluent Disposal Pump, Non Oilyeffluent & Sludge Disposal Pumps And Effluent Disposal Sump Pumps ( 30Nos ) In 15Locations & Sewage Disposal Sump Pumps In 20Locations And Its Auxiliaries, Dozing Tanks & Dozing Pumps And Its Agitators, Acid & Alkali Loading Pumps Andvalves And Pipe Lines As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 2 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Effluent Treatment Plant - Effluent Re-Circulation Cum Disposal Pump ( Type Horizontal, Centrifugal, Pump Capacity 250M3 / Hr, Motor Capacity 75Kw, Rpm 1480 ) And Its Auxiliariesas Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 3 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Effluent Treatment Plant, Sewage Disposalpump ( Type - Horizontal, Centrifugal Pump, Capacity- 50M3 / Hr, Motor Capacity - 22Kw, Rpm 1475 ) And Its Auxiliaries And As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 4 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Effluent Treatment Plant, Tilted Plate Interceptor Feedpump ( Type - Screw Pump, Capacity- 10M3 / Hr, Motor Capacity - 22Kw ) And Its Auxiliaries And As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 5 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Etp Sump Pump ( Cpu Neutralized Effluent Pump ) ( Type - Submersible Pump, Motor Capacity - 9.3 Kw ) And Its Auxiliaries And As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 6 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing / Mechanical Seal Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments Ineffluent / Sewage Disposal Submersible Monoblock Sump Pumps ( 3 Kw / 3.7 Kw - Rpm 2900 ) ( Discharge Capacity 5M3 / Hr / 10M3 / Hr ) And Its Auxiliaries As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 7 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing / Mechanical Seal Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments Ineffluent Disposal Submersible Monoblock Sump Pumps ( 22 Kw - Rpm 2900 ) ( Discharge Capacity 150M3 / Hr / 100M3 / Hr ) And Its Auxiliaries As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 8 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing / Mechanical Seal Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Oily Sludge & Disposal Pumps, Non Oily Effluent & Sludge Disposal Pumps And Effluent / Sewage Disposal Submersible Monoblock Sump Pumps ( 1.5 Kw - Rpm 2900 ) ( Discharge Capacity 2M3 / Hr ) And Its Auxiliaries As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 9 Charges For Carrying Out Overhauling / Repairing Works Such As Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Alum / Lime / Poly Dosing Pump ( 0.18 Kw ) ( Postive Displacement Pump ) And Its Auxiliaries As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 10 Charges For Carrying Out Overhauling / Repairing Works Such As Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Alum / Lime / Poly Agitator Flocculator Motor / Flash Mixer Pump ( 0.37 Kw ) And Its Auxiliaries As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 11 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Oil Disposal Pump ( 0.37 Kw - Centrifugal Pump ) ( Discharge Capacity 2M3 / Hr ) And Its Agitatorsas Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 12 Charges For Carrying Out Overhauling / Repairing Works Such As Replacement Of Failed Bearing Replacement Of Worn-Out Shaft Etc. By Complete Dismantling, Inspection, Replacement Of Worn-Out Parts If Necessary And Assembling, Alignment, Testing And Commissioning Activities For The Equipments In Acid / Alkali Unloading Pumps ( 3.7 Kw - Centirifugal Pump ) ( Discharge Capacity 5M3 / Hr ) And Its Agitatorsas Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 13 Charges For Attending The Choke / Puncture Work Of 250Nb, 200Nb, 65Nb, 50Nb Effluent Buried M.S Pipe Line Including Cutting, Welding And Wrapping Of Anti-Corrosive Sheet As And When Required As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Like Welding Rods, Cutting Gas, Anti-Corrosive Sheet, Safety Appliances And Hire Charges For Tools & Plants Etc., Complete For 3Mtr Length Of 2Joints Per Work. 14 Charges For Attending The Choke / Puncture Work Of 80Nb & 65Nbeffluent And Sewage Buried Upvc Pipe Line Including Cutting And Joining By Using Special Paste As And When Required As Per The Direction Of Engineer In-Charge Including Cost Of Labour Lead, Lift, Consumable Like Paste, Safety Appliances And Hire Charges For Tools & Plants Etc., Complete. 15 Charges For Excavation Of Earth To Work In The Underground Pipe Line And Refilling For Attending The Choke / Puncture Work / For Inspection Work. 16 Charges For Attending Choke / Puncture Work Of 250Nb, 200Nb Etc.., Effluent / Sewage Open Areams Pipe Line Including Cutting , Grinding & Welding Of 1 Pipe 3Mtr Length Of 2 Joints. As Per The Direction Of Engineer In-Charge Including Costof Labour Lead, Lift, Consumable Like Paste, Safety Appliances And Hire Charges For Tools & Plants Etc., Complete 17 Charges For Attending 300 Nb , 250Nb Butterfly Valve Along With Nrv 1 Set Dismantling, Inspection, Cleaning, Lapping, Reconditioning And Refixing In Effluent Treatment Plant Area As Per The Direction Of Engineer In-Charge Including Costof Labour Lead, Lift, Consumable Like Paste, Safety Appliances And Hire Charges For Tools & Plants Etc., Complete