Upgradation Of 66Kv Substation, Adoor To 110Kv Standard- Strengthening Of Compound Wall At 66Kv Substation Adoor., adoor-Kerala

Kerala State Electricity Board-KSEB has published Upgradation Of 66Kv Substation, Adoor To 110Kv Standard- Strengthening Of Compound Wall At 66Kv Substation Adoor.. Submission Date for this Tender is 30-11-2022. Substation Tenders in adoor Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

34931261
Upgradation Of 66Kv Substation, Adoor To 110Kv Standard- Strengthening Of Compound Wall At 66Kv Substation Adoor.
Open Tender
Indian
Kerala
adoor
30-11-2022

Tender Details

Upgradation Of 66Kv Substation, Adoor To 110Kv Standard- Strengthening Of Compound Wall At 66Kv Substation Adoor.

Key Value

Document Fees
INR 1180 /-
EMD
INR 8000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Upgradation of 66kV Substation, Adoor to 110kV Standard- Strengthening of Compound wall at 66kV Substation Adoor.
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1 5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 15 m disposed earth to be levelled and neatly dressed All kinds of soil
2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1 3.6 (1 cement 3 coarse sand 6 graded stone aggregate 40 mm nominal size)
3Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 16:12 (1 cement. 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) up to plinth Level with Cement mortar 1.6 (1 cement 6 coarse sand)
4Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1 6 12 (1 cement 6 coarse sand 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like Cement mortar 16 (1 cement 6 coarse sand)
5Clearing jungle including uprooting of rank vegetation, grass: brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
6Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge in mud mortar
7Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in CM 16(1 cement 6 coarse sand) etc complete
8Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia etc. complete.
9Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:24 (cement 2 coarse sand 4 graded stone aggregate 20 mm nominal size)
1012 mm cement plaster of mix 1:4 (1 cement 4 fine sand)
11Applying one coat of water thinnable cement primer of approved brand and manufacture on wall Surface Water thinnable cement primer
12Applying priming coat With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron steel works
13Painting with aluminium paint of approved brand and manufacture to give an even shade Two or more coats on new work
14Fencing with angle iron post placed at required distance embedded in cement concrete blocks every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with GI staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concretework to be paid for serarately) Payment to be made per metre cost of total length of barbed wire used With GI barbed wire
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail