| 1 | Retaining Wall |
| 2 | 60.2.6 : BAILING OUT WATER USING PUMP ABOVE 30HP AND UP TO 40HP - Bailing out water with engine and pump set above 30HP and up to 40HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 3 | 60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 4 | 60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. |
| 5 | 60.7.1 : DRYRUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 6 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 8 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 9 | 60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling courseusing departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site |
| 10 | od229785/2022_2023 : Extra Labors <br>Labour- Mate |
| 11 | od229786/2022_2023 : EARTH WORK FILLING- Supplying department earth i filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 12 | 50.6.1.4 : Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete |
| 13 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 14 | 13.1.2 : 12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). |
| 15 | od229787/2022_2023 : Cleaning and white cement washing 2 coat over new surface |
| 16 | 13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 17 | od229951/2022_2023 : Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of 6 mm aggregatefilling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 18 | od229788/2022_2023 : Dismantling tiled roofing's roof tileonly complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 19 | od229789/2022_2023 : Steel work for purlin/single section with G P pipes including cutting, hoisting, fixing in position including welding and bolted with special shaped washers etc. complete |
| 20 | od229790/2022_2023 : Steel work in built up G P tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in positionincluding welding and bolted with special shaped washers etc. complete |
| 21 | od229791/2022_2023 : Supplying and stacking M.P ridge tile including cost and conveyance charge etc complete |
| 22 | od229792/2022_2023 : Supplying and stacking M.P Roofing tile including cost and conveyance charge etc complete |
| 23 | od229793/2022_2023 : Roofing with existing MP tiles includinglabour charges etc.complete.<br> |
| 24 | od229794/2022_2023 : Setting M.P hip and ridge tiles set in lime mortar 1:2 including finishing edgesincluding all cost of materials labour charges and conveyance charges.etc.complete. |