}

Tender For Supply Installation And Commissioning Of Heating Ventilation Air Condition System (Hvac) And And Annual Comprehensive Maintenance For 3 (Three) Years Of New Office Building Of Sambalpur Municipal Corporation At Durgapali, Sambalpur, sambalpur-Odisha

Municipal Corporation has published Tender For Supply Installation And Commissioning Of Heating Ventilation Air Condition System (Hvac) And And Annual Comprehensive Maintenance For 3 (Three) Years Of New Office Building Of Sambalpur Municipal Corporation At Durgapali, Sambalpur. Submission Date for this Tender is 09-12-2022. Air Conditioner Tenders in sambalpur Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

34922778
Tender For Supply Installation And Commissioning Of Heating Ventilation Air Condition System (Hvac) And And Annual Comprehensive Maintenance For 3 (Three) Years Of New Office Building Of Sambalpur Municipal Corporation At Durgapali, Sambalpur
Tender
Indian
Odisha
Sambalpur
09-12-2022

Tender Details

Supply Installation And Commissioning Of Heating Ventilation Air Condition System ( Hvac ) And And Annual Comprehensive Maintenance For 3 ( Three ) Years Of New Office Building Of Sambalpur Municipal Corporation At Durgapali, Sambalpur , Supplying, Installation, Testing, Commissioning And Designing As Per Requirment, Ceiling Suspended Cassete Type Inveter Ac Unit With One Idu & One Odu And Copper Condenser Coil Suitable Rated Rotary Compressor Having Eco-Friendly Refrigerant, With Star Rating 5Star, For Operation On 230V , 50 Hz Single Phase Power Supply With Cordless Remote Control, Refrigerant Copper Pipe Line Of Following Dia For Necessary Coonection From Odu Condensor To Idu Cooling And Fixing The Same On Ceiling / Wall Surface With Clamp I / C 9Mm Nitrile Rubber Insulation 5 / 8Dia & 3 / 8 Dia Length Upto 15 Mtr, 4Core 4Sqmm ( Standrad ) Pvc Insulated And Pvc Sheathed Flexible, 1.1 Kv Isi Marked Copper Cable For Connection Of Cassete Type A.C Unit From Indoor To Outdoor Condenser Unit With Necessary Connection Length Upto 15 Mtr And Having 16 Amps, 3 Pin Plug Top & Connection, Fixing Of 25Mm Dia Upvc Pipe For Accumulated Water From The Cooling Coil Of Cassete Type A.C Unit To Outside Of The Building With 19Mm Thick Nitrile Rubber Tube For Insulating The Upvc Pipe Above And Inside The False Ceiling With Proper Hanging / Suspending Arrangement And Maintaining Proper Slope For Smooth Passing Of Drain Water With Necessary Accessories I / C Taping Etc Length Upto 25 Mtr Of Make: Hitachi / Lg / Blue Star / O-General / Mitsubishi ) As Per The Direction Of The Officer Incharge , Supplying, Installation, Testing, Commissioning And Designing Of Followingcapacity3starrating, Invertertypewall Mounting Splittypeac Unit Having Copper Condensor Andfittedwithrotarysealedcompressorsuitablefor Operationon230volt, 50Hz.Singlephasepower Supplywithremoteand3.00Mtr.Bothsuction& Dischargelinecopperpipe, Clampingofoutdoorunit I / C Insulation And Conneting Wire Etc, And Having Refrigerant Copper Pipe Line Of Following Dia For Necessary Coonection From Odu Condensor To Idu Cooling And Fixing The Same On Wall Surface With Clamp I / C 9Mm Nitrile Rubber Insulation 1 / 2Dia & 1 / 4 Dia Length Upto 15 Mtr, 4Core 2.5Sqmm ( Standrad ) Pvc Insulated And Pvc Sheathed Flexible, 1.1 Kv Isi Marked Copper Cable For Connection Of Split Type A.C Unit From Indoor To Outdoor Condenser Unit With Necessary Connection Length Upto 15 Mtr, Checking And Testing Etc Fixing Of 25Mm Dia Upvc Pipe For Accumulated Water From The Cooling Coil Of Split Type A.C Unit To Outside Of The Building Withthe Upvc Pipe Above And Inside The False Ceiling With Proper Hanging / Suspending Arrangement And Maintaining Proper Slope For Smooth Passing Of Drain Water With Necessary Accessories I / C Taping Etc. Complete As Required Maintaining The Aesthetic View Of Building Length Upto 25 Mtr Of Make: Hitachi / Lg / Blue Star / O-General / Mitsubishi ) As Per The Direction Of The Officer Incharge , Annual Comprehensivemaintenancecoversthe Hvac ( Cassete & Split ) Air Conditioning System After 1 Years Of Warrenty, 03 Years. 1. The Comprehensive Amc Contract Cover Atteding To Any Number Of Breakdown Calls And Four Quarterly Preventive Maintenance Service In A Year During The Tenure Of The Contract. 2. Comprehensive Amc Contract - All Moving Parts Including Compressor, Capacitor, Pcb, Motors & Refrigerant Gas Which Requires Repair / Replacement Due To Normal Wear And Tear During The Contract Shall Be Replaced Free Of Cost. 3. The Contract Will Not Cover Visit / Replacement / Repairing Of Parts And Equipments Under The Following Circumstances: I ) Damage Caused To The Machine Due To Floods, Fire, Riot, Brekage, Pest, Misuse, Imporper Or Negligent Use, Mishandling, Unathorized Alteration, Modification Or Subsititution Of Any Parts, And Abnormal Voltage Supply. Ii ) Defect Due To Usage Of Non-Recommended Spares And Accessories. 1St Year , 2Nd Year , 3Rd Year

Key Value

Document Fees
INR 10000 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail