Tender For Sinking Of Tube Well ,Laying Distribution Pipe Line, Pump House ,Boundary Wallsoil Investigation ,350 Cum Ohr (Intze Type With Pile Foundation) & Accommodate Fhtc (1783 Nos) Under Jjm With Allied Workfor Sagarpur Pwss Indaspur- I Block Includin
Tender Overview
Project Description
Sinking Of Tube Well , Laying Distribution Pipe Line, Pump House , Boundary Wallsoil Investigation , 350 Cum Ohr ( Intze Type With Pile Foundation ) & Accommodate Fhtc ( 1783 Nos ) Under Jjm With Allied Workfor Sagarpur Pwss Indaspur- I Block Including Supply Of All Labour & Materials Including 02 ( Two ) Years Operation & Maintenance Chargewithin Ghatal Sub-Divisionunder Midnapore Division, Phe Dte.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Dec-2022 | 1st CORRIGENDUM | Date | 06-Jan-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Sinking ofTwo nos 250 x 150 mm dia. X 200 mtr. Depth deep tube well by direct rotary method forSagarpur water supply scheme with inDaspur-I Block under Midnapore Division, P.H.E. Dte. ( Annexure - I) |
| 2 | Laying of Distribution pipe linefor Sagarpur Pipe Water Supply Schemeunder DASPUR-I Block withinMidnapore Division, PHE Dte.(Annexure-II) |
| 3 | Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with W.C. & Bath forHead work sitefor Sagarpur PWSS within Ghatal Sub- Divisionunder Midnapore Division, PHE Dte. (Considering G.L. 1950 mm below Road Level) {TYPE - B} ( Annexure - III) |
| 4 | Construction of 3.60 Mtr. X 3.00 Mtr. Switch Room cum Chlorine Room with out W.C. & Bath for 2nd.Tube Well site of Sagarpur PWSSwithin Ghatal Sub-Division under Midnapore Division, PHE Dte. (Considering G.L. 1950 mm below Road Level) {TYPE - B}(Annexure-IV) |
| 5 | Soil Investigation work inconnection ofconstruction of R.C.C. over Head Reservoir (Capacity 350Cum) for SagarpurPWSS Scheme withinin Daspur-I Block under Midnapore Division, PHE Dte. ( Annexure - V) |
| 6 | Construction of R.C.C. Elevated Reservoir of capacity 350 cum (Pile foundation) and staging height 20.00 mtr. with allied works under SAGARPUR & its adjoining moujaswater supplyScheme withinDaspur-IBlock including supply of all labour & materialsunder Ghatalsub-divisionof MidnaporeDivision, P.H.E.Dte,PaschimMedinipur.(Annexure-VI) |
| 7 | Accommodate FHTC (1783Nos)including supplying, laying, fitting, fixing of 15mm dia. NB PVC(Sch-80)/20mm dia. HDPE(PE-100, PN-16) Pipe with all necessary specials, saddle piece etc. all complete including cost of all materials under JJM of SagarpurPWSS Water Supply Scheme withinDaspur- IDev. Block underGhatalSub-Division of Midnapore Division PHE Dte. in the District of Paschim Medinipur . ( Annexure - VII) |
| 8 | Construction of Boundary wall & allied works at 1st. Tube well site cum Head Work Site forSagarpur PWSSwater supply schemewithin Daspur-I Block underMidnapore Division PHE.Dte. (Total length 100 mtr,column size 250x250mm,3.00 M c/c ht.- 2.300mtr from G.L)(Annexure-VIII) |
| 9 | Construction of Boundary wall & allied works at 2nd. Tube well site for SagarpurPWSS within Daspur-I Block underMidnapore Division PHE.Dte.(Total length 50 mtr,column size 250x250mm,3.00 M c/c ht.- 2.300mtr from G.L)(Annexure-IX) |
| 10 | Laying of Rising Main includinginterconnection of Sagarpur and its adjoining mouzas Water Supply Schemeunder Daspur-I Block under Ghatal Sub Division within Midnapore Division, P.H.E.Dte.(LENGTH- 627 MTR)(Annexure-X) |
| 11 | Operation & Maintenance of distribution system including Rising main, FHTC,OHR & deployment of manpower, checking of status of supply in the command area, repairing of leakages brusting pipe line, including round the clock watch & ward to ensure supply of potable water throght out the command area of the scheme. After Successfully completion of the scheme in all respect and as per direction of EIC.( Payments of valve operators to be made as per approved PHE Rate.,) Considering two nos valve Operator& plumbing mistry for reparing of FHTC as an when required. |
| 12 | Add GST (SGST + CGST) @ 18% over Basic price of (Sl. No. 1 to 11) |
| 13 | Add @ 1% Labour Welfare Cess over Basic price with GST of (Sl. No. 1 to 12) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender