Uttarakhand Power Corporation Limited-UPCL has published Tender For Maintenance Of 11/0.4 Kv Transformer At Various Places Of 33/11 Kv Kathghariya. Submission Date for this Tender is 06-12-2022. Securing and Protecting Supplies Tenders in haldwani Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply Item |
2 | LT bushing complete rod (brass) for 25 and 63 KVA |
3 | LT bushing complete rod (brass) for 100 KVA |
4 | LT bushing complete rod (brass) for 250 and 400 KVA |
5 | T/F Breatehr assembly (2kg complete) |
6 | T/F Breatehr assembly (0.5kg complete) |
7 | T/F Breatehr assembly (1kg complete) |
8 | L-Contect copper meta (500amp) |
9 | Cork sheet 4"*4"6mm |
10 | Arcing Horn |
11 | Labour Charge: Opening of HT/LT connection dismounting of T/F from sub-station double pole and shifting of transformer upto reparing site. |
12 | 25 KVA |
13 | 63 KVA |
14 | 100 KVA |
15 | 250 KVA |
16 | 400 KVA |
17 | Opening of with top plate cover and conservetr tank of T/F 11 KV bushing complete by opening nut & bolt/ or cutting welding & safe stacking at work site. |
18 | 25 KVA |
19 | 63 KVA |
20 | 100 KVA |
21 | 250 KVA |
22 | 400 KVA |
23 | Draning out T/F oil from the tank of T/F & collecting in drums includingproper & safe stacking at work site includinglabour & T&P required. |
24 | 25 KVA |
25 | 63 KVA |
26 | 100 KVA |
27 | 250 KVA |
28 | 400 KVA |
29 | Opening of LT bushings from inside & outside of T/F opening of clamps or core assembly & taking out the core/winding assembly out of T/F tank includingproper & safe stacking at work site at work site. |
30 | 25 KVA |
31 | 63 KVA |
32 | 100 KVA |
33 | 160 KVA |
34 | 250 KVA |
35 | Reparing of HT connection leads by jointing with soldering etc with providing empire sleeve & proper taping includingreplacement of carbonised bushing & replacement of old packing with new rubbersied cork sheet packing work complete in all respect. |
36 | 25 KVA |
37 | 63 KVA |
38 | 100 KVA |
39 | 160 KVA |
40 | 250 KVA |
41 | Reparing of carbonised /burned LT side connecting strips by way of soldering /tighting with bolt & nut with providing empire sleeve & proper tapping of leads of all the three phase one neutral of LT side slongwith replacement of carbonised/damage bushing & replacement of old packing with new rubberised cork sheet packing & short circuit the core/winding assembling to remove moisture contents from core stamping including labour & T&P required |
42 | 25 KVA |
43 | 63 KVA |
44 | 100 KVA |
45 | 160 KVA |
46 | 250 KVA |
47 | Reparing of T/F tank after removing sludege deposit from the bottom ot the tank & cleaning of core / winding assembling with T/F oil complete work including labour & T&P required. |
48 | 25 KVA |
49 | 63 KVA |
50 | 100 KVA |
51 | 160 KVA |
52 | 250 KVA |
53 | Housing of core/winding assembling inside the T/F tank fixing of tighting clamps with core assembly making LT connection with LT bushing & necessary taping of leads etc. Complete work including labour & T&P required. |
54 | 25 KVA |
55 | 63 KVA |
56 | 100 KVA |
57 | 160 KVA |
58 | 250 KVA |
59 | Providing & fixing on the top of core channel tape charger specification as per sample & connection with the coils. |
60 | 250 KVA |
61 | 400 KVA |
62 | Placing of conservetor tank with top plate cover of T/F 11 KV bushing providing fresh rubberised cork sheet packing & tighting with the help of but & bolts & washer/by way of welding top plate with T/F tank including labour & T&P required. |
63 | 25 KVA |
64 | 63 KVA |
65 | 100 KVA |
66 | 160 KVA |
67 | 250 KVA |
68 | Shifting & tapping up T/F oil in T/F tank properly & complete testing of T/F by meegar result & open & short circuit test result. |
69 | 25 KVA |
70 | 63 KVA |
71 | 100 KVA |
72 | 160 KVA |
73 | 250 KVA |
74 | Cleaning of breather assembly including replacement of old packing & silica zel with new silica zel including with labour & T&P required. |
75 | 25 KVA |
76 | 63 KVA |
77 | 100 KVA |
78 | 160 KVA |
79 | 250 KVA |
80 | Shifting of T/F from work site to T/F double pole & mounting of transformer on sub station double pole cleaning of terminal of LT cable removing of carbon by sand pepring etc & providing new lugs of terminals fixing & making complete connections with the transformer |
81 | 25 KVA |
82 | 63 KVA |
83 | 100 KVA |
84 | 160 KVA |
85 | 250 KVA |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail