Tender For Construction Of Compound Wall With Tup,Protection Wall,And Providing Thewater Supply Pipe Line ,Cement Concrete Pavemntfor Samadhuva Mayanam In Pulikuthi Panchayat
Tender Value
8.70 Lakhs
Estimated cost
Bid Submission
24 Nov 2022
0 days left
EMD
8700
Bank guarantee accepted
Document Fee
8700
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
chinnamanur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Construction Of Compound Wall With Tup, Protection Wall, And Providing Thewater Supply Pipe Line , Cement Concrete Pavemntfor Samadhuva Mayanam In Pulikuthi Panchayat
BOQ
| Sl. No. | Item Description |
| 1 | Earth work excavation in all classes of soil lead and lift for foundationincluding of all labour charges etc.complete., foundation |
| 2 | Cement concrete 1:4:8using 40 mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15 cm thick compacting etc complete |
| 3 | supplyin,erecting and centring including cost and conveyance of all materials to site and all labor charges etc. |
| 4 | Supplyingand fabrication of of steelincluding cost and conveyance of all materials to site and all labour charges etc complete. |
| 5 | RCC-1:1.5:3 using 20 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc |
| 6 | Brick work in cm 1: 5mix using country brick including cost and conveyance of all materials to site and all labor charges etc. |
| 7 | Plastering with cement mortar 1:5 using 12mm thick over the cement concrete for floor finish including curing etc complete |
| 8 | Painting using Plastic emulsion paintincluding cost and conveyance of all materials to site and all labour charges etc |
| 9 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with |
| 10 | Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as perstandard specification. |
| 11 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 12 | Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 13 | Painting in two coats using plastic Emulsion paint including cost and conveyance |
| 14 | Earth work excavation in all classes of soil for pipe line trench as per std.specification |
| 15 | supply and delivery of63mm HDPE-pipe-PN 6 |
| 16 | Lowering ,Layingthe 63mm HDPEpipe line and specials in trench to proper grade , alignment |
| 17 | jointing the butt-fusion welding/electro fushion ISO-21307-2011-for 63mm HDPE pipe-@50m interval |
| 18 | Re-filling with excavated earth as per std.specification |
| 19 | 1000 Litre HDPE tank |
| 20 | 63mm PVC MTA |
| 21 | 63mmx20mm PVC saddle piece |
| 22 | 20mm GI pipe |
| 23 | 20mm GI coupling |
| 24 | 20mm GI elbow |
| 25 | 20mm GI Tap |
| 26 | 65mm GM Gate valve |
| 27 | Earth work excavation in all classes of soil lead and lift for foundationincluding of all labour charges etc.complete., foundation |
| 28 | Cement concrete 1:4:8using 40 mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15 cm thick compacting etc complete |
| 29 | supplyin,erecting and centring including cost and conveyance of all materials to site and all labor charges etc. |
| 30 | Cement concrete 1:3:6using 40 mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15 cm thick compacting etc complete |
| 31 | Earth work excavation in all classes of soil lead and lift for foundationincluding of all labour charges etc.complete., foundation |
| 32 | Cement concrete 1:4:8using 40 mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15 cm thick compacting etc complete |
| 33 | supplyin,erecting and centring including cost and conveyance of all materials to site and all labor charges etc. |
| 34 | Cement concrete 1:3:6using 20 mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15 cm thick compacting etc complete |
| 35 | Cement concrete 1:2:4using 20 mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15 cm thick compacting etc complete |
| 36 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Nov 19, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedNov 24, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 24, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender