Clearance Of Snow For Various Roads Viz Cheyan To Wani Mohalla, Cheyan Hardandar Road, Rather Mohalla Road At Devsar, Waghay Mohalla Road At Devsar, Darbar Mohalla Road At Devsar, Shah Mohallah At Devsar, Tehsil Link At Devsar, Masjid Link At Devsar, Musk
Tender Overview
Project Description
Clearance Of Snow For Various Roads Viz Cheyan To Wani Mohalla, Cheyan Hardandar Road, Rather Mohalla Road At Devsar, Waghay Mohalla Road At Devsar, Darbar Mohalla Road At Devsar, Shah Mohallah At Devsar, Tehsil Link At Devsar, Masjid Link At Devsar, Muskak Link At Devsar, Devsar Sumo Stand ( Agg Length 4.08Km ) . ( Stage 23 )
BOQ
| Sl. No. | Item Description |
| 1 | Clearing snow (with frost) from Roads, manually using picks and shovels; snow depth upto 150 mm |
| 2 | Clearing Snow (without frost) from Roads, manually; |
| 3 | Snow depth upto 150 mm |
| 4 | Snow depth over 150 mm but upto 250mm |
| 5 | Snow depth over 250 mm but upto 350mm |
| 6 | Snow depth over 350 mm but upto 450mm |
| 7 | Snow depth over 450 mm but upto 550mm |
| 8 | Snow depth over 550 mm but upto 650mm |
| 9 | Snow depth over 650 mm but upto 750mm |
| 10 | Snow depth over 750 mm but upto 850mm |
| 11 | Snow depth over 850 mm but upto 950mm |
| 12 | Snow depth over 950 mm but upto 1050mm |
| 13 | Snow depth over 1050 mm but upto 1150mm |
| 14 | Snow depth over 1150 mm but upto 1250mm |
| 15 | Galla cutting in compressed snow (Any Depth) Subject to submission of geotaged photographs before during and after of each pass dully authenticated by AEE concerned. |
| 16 | 4 pass/Km @ 2 Lab./Pass as per actual. |
| 17 | Spreading/Sprinkling of salt on shaddy portions/slippery surfaces or places with frost of road surfaces during winter session 2022-2023 on various roads of sub division qazigund icluding carriages, loading/unloading and engagement of labours etc complete job if required. |
| 18 | Collection of accumulated snow and roof top snow from various roads and lifting of snow by way of engaging JCBs, tippers,tractors,dumpers including disposal of same within 2 Km lead if required. |
| 19 | Snow Clearance by Mechanical Means using Machines as specified or equivalent whenever deployed. |
| 20 | Dozer BD 80 |
| 21 | Snow Plough 180 HP (Ashoka Leyland Stallion- 2009) |
| 22 | Snow Plough 4WD 170-180 BHP (Unimog) |
| 23 | Snow Plough 4WD 90 BHP (Trucks) |
| 24 | Snow Plough 4WD 60 BHP (Trucks) |
| 25 | Snow Plough 4WD 160 BHP (Trucks) |
| 26 | Snow cutter Rolba 1500 |
| 27 | Snow cutter Rolba 3000 |
| 28 | Snow Cat |
| 29 | Snow Blower 4WD 690 BHP 8500T/hr (Fresia Spa) |
| 30 | Snow Blower 4WD 420-430 BHP 3500T/hr (Supra 4001) |
| 31 | Snow Blower 4WD 570 BHP 5300T/hr (Supra 3000) |
| 32 | Snow Blower 4WD 420 BHP 3500T/hr (Rolba 1500) |
| 33 | Lifting of uprooted trees fell on road surface including cutting of branches complete job ( All girths) Subject to submission of geotaged photographs during and after dully authenticated by AEE concerned. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender