Public Health Engineering Department-PHED has published Tender For Balance Work Of Survey Investigation Design And Construction Of Piped Water Supply Scheme Under Jal Jeevan Mission At Village Khedikalan And Bhumlakhedi In Block Chachora Distt Guna Based On Tube Well Including Installation Of Electric S. Submission Date for this Tender is 03-01-2023. Pump House Construction Tenders in Guna Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Dec-2022 | DATE CORRIGENDUM | Date | 07-12-2022 |
2 | 07-Dec-2022 | DATE C | Date | 16-12-2022 |
3 | 16-Dec-2022 | DATE CR | Date | 26-12-2022 |
4 | 26-Dec-2022 | DATECCC | Date | 03-01-2023 |
Sl. No. | Item Description |
1 | Laying and Jointing PVC Pipe. Heading |
2 | Blance work of Survey Investigation Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission at Village –KHEDIKALAN & BHUMLAKHEDIin Block- CHACHORA Distt. GUNA based on tube well including installation of electric submersiblemotorpump, Village- BHUMLAKHEDI construction of incomplete 20 KL R.C.C Sump well/GSR ( 60% BALANCE WORK :- SUMPWELL roof, PUMP HOUSE, Back filling ,Ladder, Man hole cover ,floor tiles, sump water proofing, painting,Electric fitting, pumphouse whole work AS PER Annexure E-Techenical DETAIL) construction of incomplete 125 KL R.C.C. OHT 10 m.staging(65% BALANCE WORK CONTAINER ,STAIR CASE ,RAILING & OTHER WORK FINISHING WORK AS PER Annexure E-Techenical DETAIL) . Blance work of Survey Investigation Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission at Village –KHEDIKALAN in Block- CHACHORA Distt. GUNA based on tube well including installation of electric submersiblemotorpump,construction of incomplete20 KL R.C.C Sump well/GSR ( 25 % BALANCE WORK , Back filling ,Ladder, Man hole cover , floor tiles, sump water proofing, painting, Electric fitting,pumphouse whole work AS PER Annexure E-Techenical DETAIL) Village- KHEDIKALAN construction of incomplete 150 KL R.C.C. OHT 12 m.staging(25 % BALANCE WORK RAILING, CONTAINER WATER PROOFING LADDER IN SIDE & OUT SIDE ,Staire GATE ,AIR VENTLIGHTNING ARRESTER,Plinth Protaction, ALL REMAINING Work AS PER Annexure E-Techenical DETAIL) laying & jointing of rising main, feeder main and distribution pipe line system, household tap connections, construction of pump house and electric power connections at tube well including cost of all material &labour with 90 Days trial and run of pwssafter Completion of construction/Execution of work with successful testing and commissioning for retrofitting of scheme. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail