|
| 1 | Labour charges for painting two coats with distemper paint over wall and etc. including cleaning, applying, protecting, T & P & labour required for the work complete. |
| 2 | Labour charges for painting two coats with Weathercoat paint over wall and etc. including cleaning, applying, protecting, T & P & labour required for the work complete. |
| 3 | Labour charges for painting two coats with approved paint over M.S. door, window & etc. including cleaning, applying, protecting, T & P & labour required for the work complete . |
| 4 | Supplying, fitting,fixing of M.S.door, window, Truss and Grill made out of M.S.Angle,Flat,Sheet,and etc includingT & P & labour required for the work complete . |
| 5 | Sand filling in foundation & plinth including watering, ramming, cost, conveyance, royalty, curing, taxes of all materials etc. & labour required for the work complete. |
| 6 | Cement Concrete (1:4:8) using 40 mm. sized hand broken hard granite metal including cost, conveyance, royalty, curing &taxes of all materials etc. & labour required for the work complete. |
| 7 | Construction ofPathway With supply and fixing of 60mm thicknesspaver block with factory made including all cost,conveance,Royalty,and etc.complete. |
| 8 | Cement concrete(1:2:4) using 12 mm.& down gradedC.B.H.G. chips including cost conveyance, royalty, curing,c & s,taxes etc &labour required for the work complete. |
| 9 | Supplying all materials, labour,T&P and fixing G.C.I.Coloured Sheet(Bhusan ,Tata) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of G.C.I. sheet & fittings & contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge. |
| 10 | R.C.C. work with cement concrete (1:1 1/2:3) with 12mm. Size C.B.H.G chips including hoisting, laying, labour, cost, conveyance, royalty, centering & shuttering complete. |
| 11 | Labour for cutting, bending, binding of rod including cost of binding wire & steel Complete. |
| 12 | Rubing of Old Marble tiles in floor,wall, treads, steps & landing including cost of Tile,rubbing & polishing complete. |
| 13 | Labour charges for supplying,fitting,& fixing of Ceramic tiles in wall and floor on 25 mm thk.cement mortar (1:1) jointed & etc Including cost of vetrified Tiles Complete. |
| 14 | Brick work in cement mortar (1:6) in foundation & plinth with bricks having crushing strength not less than 75kg./cm2 including cost & conveyance, curing, royalty & labour required for the work complete. |
| 15 | 12mm thick cement plaster in cement mortar (1:6) over brick work including cost, curing, conveyance, royalty & taxes of all materials & labour required for the work complete. |
| 16 | Fixing of Submersible Pump to the Bore well including cost, curing, conveyance, royalty & taxes of all & labour required for the work complete. |
| 17 | Providing of LED Bulbincluding cost,conveyance,& taxes of all materials & labour required for the work complete. |
| 18 | Electrical wiring4 mm square including Conduct pipe, cost, conveyance, complete.& taxes of all materials & labour required for the work complete. |
| 19 | Main switch Box,switch,Holder and etc. includingall,cost,conveyance, complete.& taxes of all materials & labour required for the work complete. |
| 20 | Water tank = (500 ltr) including Fixing & fitting. |
| 21 | UPVC T,Nipple =(1\") |
| 22 | UPVC Union =(1\") |
| 23 | UPVC Soivent =(200 gm) |
| 24 | Nipple zip = |
| 25 | Parto sets = |
| 26 | UPVC Pipe =(1\")per ft. |
| 27 | Fixing of Mirror Set = |
| 28 | Long body Tap = |
| 29 | Flush tape = |
| 30 | Angle cock = |
| 31 | Angle cock pipe = |
| 32 | Waste Pipe = |
| 33 | Vent Pipe = |
| 34 | Basin & Pedestal = |
| 35 | Flush cirsten = |
| 36 | C.P. Jali = |
| 37 | Flush Drain Pipe = |
| 38 | Burnal Set = |
| 39 | Paint Set = |
| 40 | Jurnal Set = |
| 41 | P V C Pipe=(4\")per ft. |
| 42 | Burnal = (4\") |
| 43 | Tape Small = |
| 44 | UPVC Socket =(1\") |
| 45 | UPVC Tac =(1/2\") |
| 46 | UPVC Buble =(1/2\") |
| 47 | UPVC pipe =(1/2\") |
| 48 | UPVC B/F =(1/2\") |
| 49 | Heavy Led Cock Tape = |
| 50 | Long Tape = |
| 51 | Wash Basin (Decorative) = |
| 52 | Nipple zip (Big) = |
| 53 | Healt Fourset = |
| 54 | Decorative Golden Black Granite Stone = |
| 55 | Pan = |
| 56 | Tape Medium = |
| 57 | Basin Set = |
| 58 | Bolt Set = |
| 59 | Urinal Pipe = |
| 60 | P V C Pipe Finolex =(4\")per ft. |
| 61 | Bade = |
| 62 | Solvent (500 ml) = |
| 63 | Plastic Rope = |
| 64 | Wire = |
| 65 | Provision for Radium Display Board = |