| 1 | Construction of Toilet at Villipalayam PD Shop H/O Villipalayam in Paramathy Block ofNamakkal Districtunder AGAMT II 2022-23 |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 3 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete |
| 4 | Random Rubble Masonry in Cement Mortar 1:5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing wiht the same mortar above ground level complying with standard specifications. |
| 5 | Brick work in cement mortar 1:5 mix using II class bricks 83/4\"x43/8\"x23/4\" and conveyance of all materials to site and all labour charges etc complete -10 cum |
| 6 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to13 cms spaced at 75 cms to center to center etc. |
| 7 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works |
| 8 | Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 9 | Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification. |
| 10 | Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification. |
| 11 | Paving the floor with first quality and approved Ceramic tiles of all colour & Shade of size 305 x 305 x 6mm in all floors over a base layer of cement mortar 1:3 (One Cement and three sand) 20 mm thick laid in situ and pointing with the same colour cement |
| 12 | Oil Distempering Two Coats overPlastering Surface including cost and conveyance of materials and labour chargesetc complete |
| 13 | EmulsionPainting two coats with approvedPaint over one coat of Primaring coat of Cement Paint over new cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete c |
| 14 | Supply of steel doors and windows including cost and convyance and all charges etc complete.etc complete |
| 15 | Towards cost supply and fixing of RCC Jolly including all cost and conveyance etc.,all complete |
| 16 | Towards cost, supply and fixing of IWC including cost of men and materials etc., all complete |
| 17 | GST Amount for providing Service to Government Contract Works for the above RENEWALWorks. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |