|
| 1 | Construction ofDrain at Villipalayam Near Post Office H/OVillipalayam in Paramathy Block ofNamakkal Districtunder AGAMT II 2022-23 |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation |
| 4 | Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etc |
| 5 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor bed blocksfor10 cum |
| 6 | Plastering with cement mortar 1:4 mixto20mmthick includingcost and conveyance of all materials to site and all labour charges etc |
| 7 | Provison for Vertical Soak Pit (As Per Sub Estimate) |
| 8 | Earthwork excavating and depositing with in initial lead of 10m and lift in 2m (For Roads,Supply Channels ,desilting of MI tanks,Pond &Kulam) etc complete |
| 9 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 10 | Brickwork in cement mortar 1:5 mix Using Country Bricks83/4x41/4x 2 3/4\"including cost and conveyance pf all materials to site and all materials to work site and labour all charges etc complete |
| 11 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 12 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 13 | Colour washing Two Coats using Approved Colour Pigments including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 14 | Filling the Soakpit with 225mm Boulders as per standard specifications |
| 15 | Filling the Soakpit with 40mm Metal as per standard specifications |
| 16 | Filling the Soakpit with 20mm Metal as per standard specifications |
| 17 | Supply of PVC Pipes 110mm dia with all labour charges etc complete |
| 18 | GST Amount for providing Service to Government Contract Works for the above RENEWALWorks. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |