}

Tender For Off Loading The Work For Washing Of Payloaders Motor Graders Wheel Dozers Crawler Dozers And Hydraulic Excavators Of Dozer Section On Daily Basis For A Period Of 730 Days 2 Years At Dudhichua Project, dudhichua-Uttar Pradesh

Northern Coalfields Limited-NCL has published Tender For Off Loading The Work For Washing Of Payloaders Motor Graders Wheel Dozers Crawler Dozers And Hydraulic Excavators Of Dozer Section On Daily Basis For A Period Of 730 Days 2 Years At Dudhichua Project. Submission Date for this Tender is 29-11-2022. Earth Moving Machinery Tenders in dudhichua Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

34800211
Corrigendum : Tender For Off Loading The Work For Washing Of Payloaders Motor Graders Wheel Dozers Crawler Dozers And Hydraulic Excavators Of Dozer Section On Daily Basis For A Period Of 730 Days 2 Years At Dudhichua Project
Open Tender
Indian
Uttar Pradesh
dudhichua
29-11-2022

Tender Details

Tender For Work Of Off Loading The Work For Washing Of Payloaders Motor Graders Wheel Dozers Crawler Dozers And Hydraulic Excavators Of Dozer Section On Daily Basis For A Period Of 730 Days 2 Years At Dudhichua Project

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-Nov-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 29-11-2022

Key Value

Document Fees
Refer document
EMD
INR 16100.0 /-
Tender Value
Refer document

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description
1SCOPE OF WORK 1. Firm has to clean a total of 06 equipment (103 x 6 = 618 m2 area) in G-shift per day in different types ofEquipment – Komatsu WA800-3 Payloader, CAT 992K Payloader, Kawasaki 115ZV Payloader, BEML BG825 Motor Grader, CAT 14M Motor Grader, CAT D11T Dozer , Komatsu D475A-5E0, BEML BD355 Dozer, TATA EXE-350 Excavator & TATA ZX-650 Excavator. 2. Minimum cleaning area per day will be 618 m2 (for 06 nos. of equipment). Payment will be done on the basis of area cleaned only. 3. Work to be carried out in G –shift per day basis for 730 days / 2 years from the commencement of work order. Note:- • Firm will also ensure safety of manpower and equipment on their own cost. • All sanitization materials required for work will be provided by the contractor. • Firm has to clean minimum 06 nos. of equipment per day. • Firm has to provide minimum 02 (Two) nos. Unskilled manpower per day in G-shift. • Firm has to provide to and fro transportation of their manpower up to Dozer work shop.
2Total charge including labour cost, contractor profit & Sanitisation material cost (Exclusive of GST) for Complete work for Washing of Payloaders, Motor Graders, Wheel Dozers, Crawler Dozers & Hydraulic Excavators of Dozer Section as per SCOPE OF WORK and NIT
3Total CMPF/EPF & Pension (Exclusive of GST) for Complete work for Washing of Payloaders, Motor Graders, Wheel Dozers, Crawler Dozers & Hydraulic Excavators of Dozer Section as per SCOPE OF WORK and NIT
4Total impact of GST for the purpose of CTC
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail