Drinking Water And Sanitation Department has published Tender For Repairing Of Electro-Mechanical Components Of Clear And Raw Water Pumping Plant Of Rural Water Supply Scheme Chandwa. Submission Date for this Tender is 21-11-2022. Coats and Jackets Tenders in medininagar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

34798612
Tender For Repairing Of Electro-Mechanical Components Of Clear And Raw Water Pumping Plant Of Rural Water Supply Scheme Chandwa
Open Tender
Indian
Jharkhand
medininagar
21-11-2022

Tender Details

Repairing Of Electro-Mechanical Components Of Clear And Raw Water Pumping Plant Of Rural Water Supply Scheme Chandwa- 1 Clear Water Pumping Plant 2 Supplying All Labour Tools And Tackles For Complete Dismantling And Opening Of20 Hp Kirlosker Make 3 Phase Induction Motor, Cutting Burnt Wire And Rewinding Super Enameled Copper Wire , Insulating Paper, Tape Bamboo Stick Etc. Heating Varnishing And Reassembling The Motor And Tackleschanging Thrust Ball Bearing De / Nde 6309Zz- 2Nos. And Testing On Full Load At Site Including Transportation Charge After Deducting The Cost Of Scrap Materials ( Burnt Wire Wt. 16 Kg Approx ) For Both Sets. 3 Cost For Supplying Labour, Tools And Tackles For Repairing Ofc / F Pump Of20 Hpkirlosker Make Pump Set With Opening And Refitting After Repairing With S / F Of New Rotating Unit Complete Having C.I Impeller 355Mm Dia, Shaft, Neck Ring, Bearing, Bearing Housing Etc. All Complete With Transportation Charge. 4 Cost Of Consumable Materials For Above Mentioned Work Such As Grease, Gland Packing, Packing Paper, Cotton Waste, Bulb Etc Required For Jointing All Suction And Delivery Pipe Etc At Site. 5 Supply And Fitting 5” Diatyre Coupling Complete Set 6 Cost Toward Supplying And Fitting Fasd Starter Ml3 Or Equivalent Marking On 415V3 Ph Make L&T / Havell’S / Bch 7 Supplying And Fitting 65Mm Dia Sluice Valve -1 Nos. Including Worm Gear Arrangement As Per Test Pressure At Spindle Caps All Complete 8 Cost For Supplying, Installation And Commissioning Of Motor Control Panel Made Of 2 Mm Thick Cubical Panel Board Heat And Vermine Proof, Proper Ventilated Two Coats Of Appoxy Painted Comprising Of ( A ) Incoming Feeder-200 Amp Mccb- 01 No. Tpn 415 V Breaking Capacity 50 Ka, 200 Amp Copper Bus Bar Arrangement ( 4Pole ) , Phase Indicating Lamp-03 Nos. ( B ) Out Going Feeder-63 Amp Mccb- 02 Nos. Tpn 415 V Breaking Capacity 50 Ka, Volt Meter- 02 Nos. ( 0-500 ) V With Selector Switch , Amp Meter-02 Nos. ( 0-100 ) A C.T Operated With Selector Switch, Pilot Lamp- 06 Nos, Single Phase Preventer-02 Nos. Complete Internal Wiring With Suitable Size Of Copper Wire And Testing On Load. 9 Cost For Supplying And Laying Of 16 Mm² X 3 Core 1.1 Kv Copper Cable Pvc Insulated And Sheathed From Panel To Starter To Motor. Make Polycab / Universal / Havell’S 10 Stebilizer-Supplying, Installation & Commissioning 50 Kva Servo Controlled Voltage Stabilizer Switch For Input Voltage 280 To 460 Volts Output Voltage Of 415 Volt ±1%, 3 Phase 50 Hz With Copper Wound Transformer ( Oil Cooed ) As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phase Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Hanlding, Necessary Monitors And Users Controls On Front Panel Such As Indication, Alarm, Volt Meter And Selector Switch For Measuring Input And Output Voltage, Auto / Manual Selector Switch, Raise / Low Push Button Etc. Suitable Capacitytermination Strips And Bus Bar For Incoming And Out Going Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Connectedfollowingprotections And Indication Shall Be Incorporated ( I ) Over Voltage / Under Voltage ( Ii ) Single Phasingcut Off Contactor With Electronic Output Sensing Unit Make Servokon / Powerline / Isi Marked 11 Supplying And Fitting 200 A Change Over Switch, L&T / Havell’S Make / C&S Make Or Isi Reputed Make. 12 Supplying And Filling Transformer Oil Including Filtration, Universal / Vedol / Cultax. 13 Supplying, Laying And Fitting 50 Mm2 X 3.5 Core 1.1 Kv Pvc Cable Alluminium Armouredcable Universal / Polycabe Make. 14 Cost For Supplying And Erecting Of Earthing With Copper Earth Plate 600Mm×600Mm×3Mm Thick Including Accessories And Providing Masonry With Cover Plate Having Locking Arrangements And Watering Pipe 2.7 Meter Long Etc With Charcoal / Coke And Salt As Required For Plate Earthing. 15 Supplying And Laying Of 6 Swg Gi Wire For Making Earthing Connection In To From Earthing Station To Panel To Motor. 16 Cost Towards S / F 100 W Led Street Light With All Accessories To Illuminate River Side & Outside Of Pump Chamber. Make – Havell’S / Crompton / Phillips 17 Raw Water Pumpin Plant 18 Supplying All Labour Tools And Tackles For Taking Out Kirlosker Make 30 Hp V.T Motor, Dismantling The Same Taking Out Rotor From Stator, Cutting And Removing Burnt Wire, Cleaning And Repairing The Stator Slots Properly And Rewinding The Stator Of Motor With Super Enameled Round Copper Winding Coil With Dr Beck Varnish Then Reassembling The Motor And Tackles, Heating All Complete And Testing Including Transportation Charge After Deducting The Cost Of Scrape Materials ( Weight Of Coil 20 Kg ) 19 Repairing Of Rotor Shaft Welding, Turning, Machining, Making As Per Bearing Size. 20 Supplying All Labour, Tools And Tackles For Taking Out 30 Hp Vt Pump Set Wpil Makewith Bowl Assembly, 6” Dia Column Pipe Line Shaft Etc. From The Intake Well And Lowering After Repairing At Site. 21 Cost Of Complete Opening Dismantling And Refitting After Repairing Of 30 Hp Vt Bowl Assembly With S / F Top & Bottom Gm Bush – 2 No As Per Sample Intermediate Bush – 6 Nos. As Per Sample M / S / F As Per Sample Size 1” Dia X 6’ Long – 1 No. Wearing Ring- 5 Nos., Gm Impeller As Per Sample – 5 Nos., Including Remetalling, Turning & Polishing And Making Same Size Of Bowl Assembly Housing Etc. All Complete With All Labour And Materials As Required On Site 22 Cost Towards M / S / F S.S Top Shaft As Per Size And Sample 23 Cost Towards M / S / F S.S Line Shaft As Per Size And Sample 24 Cost Towards M / S / F C.I Spider Bearing With Rubber Cutless Bush As Per Size And Sample 25 Cost Of Repairing With New M / F Of Stuffing Box Bush With Gland Packing Tightener Of Discharge Head Of 30 Hp Vt P / Set. 26 Cost Towards S / F Fasd Starter Ml3 Equivalent Making On 415 V, 3 Phmake L& T / Havell’S / Bch 27 Cost Towards S / F 100 W Led Street Light With All Accessories To Illuminate River Side & Outside Of Pump Chamber. Make – Havell’S / Crompton / Phillips 28 Supplying 3.5 Core X 50 Mm21.1 Kv Pvc Cable Aluminum Armored Cable Polycab / Universal / Havell’S Make 29 Cost For Supplying, Installation And Commissioning Of Motor Control Panel Made Of 2 Mm Thick Cubical Panel Board Heat And Vermine Proof, Proper Ventilated Two Coats Of Appoxy Painted Comprising Of ( A ) Incoming Feeder-I ) 200 Amp Mccb- 01 No. Tpn 415 V Breaking Capacity 50 Ka, 200 Amp Copper Bus Bar Arrangement ( 4Pole ) , Phase Indicating Lamp-03 Nos. ( B ) Out Going Feeder- ( I ) 100 Amp Mccb- 02 Nos. Tpn 415 V Breaking Capacity 50 Ka, Volt Meter- 02 Nos ( 0-500 ) V With Selector Switch, Amp Meter-02 Nos. ( 0-100 ) V Ac Operated Selector Switch, Pilot Lamp- 06 Nos, Single Phase Preventer-02 Nos. Complete Internal Wiring With Suitable Size Of Copper Wire And Testing On Load. 30 Cost For Supplying And Laying Of 16 Mm² X 3 Core Copper Cable 1.1 Kv Pvc Insulated And Sheathed From Panel To Starter To Motor. 31 Stebilizer-Supplying, Installation & Commissioning 50 Kva Servo Controlled Voltage Stabilizer Switch For Input Voltage 280 To 460 Volts Output Voltage Of 415 Volt ±1%, 3 Phase 50 Hz With Copper Wound Transformer ( Oil Cooed ) As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phase Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Hanlding, Necessary Monitors And Users Controls On Front Panel Such As Indication, Alarm, Volt Meter And Selector Switch For Measuring Input And Output Voltage, Auto / Manual Selector Switch, Raise / Low Push Button Etc. Suitable Capacitytermination Strips And Bus Bar For Incoming And Out Going Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Connectedfollowingprotections And Indication Shall Be Incorporated ( I ) Over Voltage / Under Voltage ( Ii ) Single Phasingcut Off Contactor With Electronic Output Sensing Unit Make Servokon / Powerline / Isi Marked 32 Supplying And Fitting 200 A Change Over Switch, L&T / Havell’S Make / C&S Make Or Isi Reputed Make. 33 Supplying And Filling Transformer Oil Including Filtration, Universal / Vedol / Cultax. 34 Supplying, Laying And Fitting 50 Mm2 X 3.5 Core Alluminium Armouredcable Universal / Polycabe Make. 35 Cost For Supplying And Erecting Of Earthing With Copper Earth Plate 600Mm×600Mm×3Mm Thick Including Accessories And Providing Masonry With Cover Plate Having Locking Arrangements And Watering Pipe 2.7 Meter Long Etc With Charcoal / Coke And Salt As Required For Plate Earthing. 36 Supplying And Laying Of 6 Swg Gi Wire For Making Earthing Connection In To From Earthing Station To Panel To Motor. 37 Supplying Triple Spur Gear Type Chain Pulley Block Of 2 Tonne Capcity With 3Mtr Lift Complete With Load Chain And Hand Chain Suitably, Tested To 50% Overload As Per Is 3832 Carrying Isi Mark

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: E-Quotation for repairing of electro-mechanical components of clear and raw water pumping plant of rural water supply scheme chandwa
Sl. No. Item Description
1Clear Water Pumping Plant
2Supplying all labour tools and tackles for complete dismantling and opening of20 HP kirlosker make 3 phase induction motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating Varnishing and reassembling the motor and tackleschanging thrust ball bearing DE/NDE 6309ZZ- 2Nos. and testing on full load at site including transportation charge after deducting the cost of scrap materials (burnt wire wt. 16 Kg approx) for both sets.
3Cost for supplying labour, tools and tackles for repairing ofC/F pump of20 HPKirlosker make pump set with opening and refitting after repairing with S/F of new rotating unit complete having C.I impeller 355mm dia, shaft, neck ring, bearing, bearing housing etc. all complete with transportation charge.
4Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb etc required for jointing all suction and delivery pipe etc at site.
5Supply and fitting 5” diatyre coupling complete set
6Cost toward supplying and fitting FASD Starter ML3 or equivalent marking on 415V3 ph Make L&T / Havell’s / BCH
7Supplying and Fitting 65mm dia sluice valve -1 nos. including worm gear arrangement as per test pressure at spindle caps all complete
8Cost for supplying, installation and commissioning of motor control panel made of 2 mm thick cubical panel board heat and vermine proof, proper ventilated two coats of appoxy painted comprising of(A) Incoming feeder- 200 amp MCCB- 01 no. TPN 415 V breaking capacity 50 KA, 200 amp copper bus bar arrangement(4pole), Phase indicating lamp-03 nos. (B) Out going feeder- 63 amp MCCB- 02 nos. TPN 415 V breaking capacity 50 KA, Volt meter- 02 nos. (0-500) V with selector switch , Amp meter-02 nos.(0-100) A C.T operated with selector switch, Pilot lamp- 06 nos, Single phase preventer-02 nos. Complete internal wiring with suitable size of copper wire and testing on load.
9Cost for supplying and laying of 16 mm² x 3 core 1.1 KV copper cable PVC insulated and sheathed from panel to starter to motor. Make Polycab/ universal/ Havell’s
10STEBILIZER- Supplying, installation & commissioning 50 KVA Servo controlled voltage stabilizer switch for input voltage 280 to 460 volts output voltage of 415 volt ±1%, 3 phase 50 Hz with copper wound transformer (oil cooed) as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phase within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy hanlding, necessary monitors and users controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto/manual selector switch, raise/low push button etc. suitable capacitytermination strips and bus bar for incoming and out going cable should be provided. All three phases shall be independently monitored and connectedfollowingprotections and indication shall be incorporated (i) Over voltage/under voltage (ii) Single phasing Cut off contactor with electronic output sensing unit make servokon/powerline/ISI marked
11Supplying and fitting 200 A change over switch, L&T/Havell’s make/C&S make or ISI reputed make.
12Supplying and filling transformer oil including filtration, universal/vedol/cultax.
13Supplying, laying and fitting 50 mm2 x 3.5 core 1.1 KV PVC cable Alluminium armouredcable Universal/Polycabe make.
14Cost for supplying and erecting of earthing with copper earth plate 600mm×600mm×3mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/coke and salt as required for plate earthing.
15Supplying and laying of 6 SWG GI wire for making earthing connection in to from earthing station to panel to motor.
16Cost towards S/F 100 W LED Street light with all accessories to illuminate river side & outside of pump chamber. Make – Havell’s / Crompton / Phillips
17Raw Water Pumpin Plant
18Supplying all labour tools and tackles for taking out Kirlosker make 30 HP V.T motor,dismantling the same taking out rotor from stator, cutting and removing burnt wire, cleaning and repairing the stator slots properly and rewinding the stator of motor with super enameled round copper winding coil with Dr beck varnish then reassembling the motor and tackles, heating all complete and testing including transportation charge after deducting the cost of scrape materials( weight of coil 20 Kg)
19Repairing of rotor shaft welding, turning, machining, making as per bearing size.
20Supplying all labour, tools and tackles for taking out 30 HP VT pump set WPIL Makewith bowl assembly, 6” dia column pipe line shaft etc. from the intake well and lowering after repairing at site.
21Cost of complete opening dismantling and refitting after repairing of 30 HP VT bowl assembly with S/F Top & Bottom GM bush – 2 No as per sample intermediate bush – 6 Nos. as per sample M/S/F as per sample size 1” dia x 6’ long – 1 No. wearing ring- 5 Nos., GM impeller as per sample – 5 Nos., including remetalling, turning & polishing and making same size of bowl assembly housing etc. all complete with all labour and materials as required on site
22Cost towards M/S/F S.S top shaft as per size and sample
23Cost towards M/S/F S.S line shaft as per size and sample
24Cost towards M/S/F C.I spider bearing with rubber cutless bush as per size and sample
25Cost of repairing with new M/F of stuffing box bush with gland packing tightener of discharge head of 30 HP VT P/Set.
26Cost towards S/F FASD starter ML3 equivalent making on 415 V, 3 phmake L& T / Havell’s/ BCH
27Cost towards S/F 100 W LED Street light with all accessories to illuminate river side & outside of pump chamber. Make – Havell’s / Crompton / Phillips
28Supplying 3.5 core X 50 mm21.1 KV PVC Cable Aluminum armored cable Polycab/ universal/ Havell’s make
29Cost for supplying, installation and commissioning of motor control panel made of 2 mm thick cubical panel board heat and vermine proof, proper ventilated two coats of appoxy painted comprising of (A) Incoming feeder- i) 200 amp MCCB- 01 no. TPN 415 V breaking capacity 50 KA, 200 amp copper bus bar arrangement(4pole), Phase indicating lamp-03 nos. (B) Out going feeder- (i)100 amp MCCB- 02 nos. TPN 415 V breaking capacity 50 KA, Volt meter- 02 nos (0-500) v with selector switch, Amp meter-02 nos.(0-100) v AC operated selector switch, Pilot lamp- 06 nos, Single phase preventer-02 nos. Complete internal wiring with suitable size of copper wire and testing on load.
30Cost for supplying and laying of 16 mm² x 3 core copper cable 1.1 KV PVC insulated and sheathed from panel to starter to motor.
31STEBILIZER- Supplying, installation & commissioning 50 KVA Servo controlled voltage stabilizer switch for input voltage 280 to 460 volts output voltage of 415 volt ±1%, 3 phase 50 Hz with copper wound transformer (oil cooed) as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phase within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy hanlding, necessary monitors and users controls on front panel such as indication, alarm, volt meter and selector switch for measuring input and output voltage, auto/manual selector switch, raise/low push button etc. suitable capacitytermination strips and bus bar for incoming and out going cable should be provided. All three phases shall be independently monitored and connectedfollowingprotections and indication shall be incorporated (i) Over voltage/under voltage (ii) Single phasing Cut off contactor with electronic output sensing unit make servokon/powerline/ISI marked
32Supplying and fitting 200 A change over switch, L&T/Havell’s make/C&S make or ISI reputed make.
33Supplying and filling transformer oil including filtration, universal/vedol/cultax.
34Supplying, laying and fitting 50 mm2 x 3.5 core Alluminium armouredcable Universal/Polycabe make.
35Cost for supplying and erecting of earthing with copper earth plate 600mm×600mm×3mm thick including accessories and providing masonry with cover plate having locking arrangements and watering pipe 2.7 meter long etc with charcoal/coke and salt as required for plate earthing.
36Supplying and laying of 6 SWG GI wire for making earthing connection in to from earthing station to panel to motor.
37Supplying triple spur gear type chain pulley block of 2 tonne capcity with 3mtr lift complete with load chain and hand chain suitably, tested to 50% overload as per IS 3832 carrying ISI Mark
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail