Construction Of Drain With Cover Slab From Near Das Company At Ward No 5 Under Dhuliyan Municipality
Tender Value
3.98 Lakhs
Estimated cost
Bid Submission
21 Nov 2022
0 days left
EMD
7964
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
dhuliyan → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Drain With Cover Slab From Near Das Company At Ward No 5 Under Dhuliyan Municipality
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling all types of masonry excepting cementconcrete plain or reinforced, stacking serviceablematerials at site and removing rubbish as directedwithin a lead of 75 m.a) In ground floor including roof. |
| 2 | Earth work in excavation of foundation trenches odrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimmingthe sides of trenches, levelling, dressing andramming the bottom, bailing out water as requiredcomplete.(a) Depth of excavation not exceeding 1,500 mm. |
| 3 | Earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis ofmeasurement of finished quantity of work)(a) With earth obtained from excavation offoundation. |
| 4 | Cement concrete with graded stoneballast(40mm size excludingshuttering)In ground floor(A) [Pakur Variety](a) 1:3:6 proportion |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety |
| 6 | Hire and labour charges for shuttering with centering andnecessary staging upto 4 m using approved stout props andthick hard wood planks of approved thickness with requiredbracing for concrete slabs, beams and columns, lintels curvedor straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)(When the height of a particular floor is more than 4 m theequivalent floor height shall be taken as 4 m and extra forworks beyond the initial 4 m ht. shall be allowed under 12 (e)for every 4 m or part thereof)(f) 25 mm to 30 mm shuttering without staging in foundation |
| 7 | Reinforcement for reinforced concrete work in all sorts ofstructures including distribution bars, stirrups, binders etcinitial straightening and removal of loose rust (if necessary),cutting to requisite length, hooking and bending to correctshape, placing in proper position and binding with 16 gaugeblack annealed wire at every intersection, complete as perdrawing and direction. (a) For works in foundation, basement and upto roof of ground JSW/JSPL/SHYAM/SRMB/ BMASL/floor/upto 4 mII. Other than SAIL/TATA/RINL |
| 8 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or infoundation or in foundation trenches. |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/stagingwhere necessary .[Excluding cost of chipping over concrete surface]A) In Ground floor(i) With 1:6 cement mortar(c) 15 mm thick plaster |
| 10 | Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.NOTE : Cement 0.152 cu.m. per 100 sq.m |
| 11 | Supplying Spreading and ConsolidatingStone duistto a depth of 100mm and above at desired density and C.B.R .as per specificatiuon with power roller to proper gradient and cambert including waterring as necessary and lighting guardi9ng barricadingand making adequate earthen bundh where necessary to protect the edges and curing with water 2 to 3 days , mending cracks and depressions by rolling where necessary including all incidental charges of roller cost of fule & lubricants complete as per Specification |
| 12 | CGST 18% |
| 13 | Cess @ 1% |
AI Tender Summary
Tender Timeline
Nov 11, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedNov 21, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 24, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender