Public Health Engineering Department-PHED has published Tender For For Fixing Of Rate Contract For Repairs To Different Types Of Damaged Horizontal And Vertical Turbine Pumps And Motors Installed At Various Wsss Of District Ganderbal, Budgam And Srinagar For One Year. Submission Date for this Tender is 30-11-2022. Turbine Engines Tenders in srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Nov-2022 | Corrigendum-I | Technical Bid | 30-11-2022 |
Sl. No. | Item Description |
1 | Repairs to 3-Phase 5HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
2 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
3 | Replacement of damaged fans as per sample. |
4 | Repairs to Bearing Housing by way of remetalling, machining etc |
5 | Providing/fitting of connection plate for Horizontal motor as per sample. |
6 | Repairs to 3-Phase 7.5HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
7 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
8 | Replacement of damaged fans as per sample. |
9 | Repairs to Bearing Housing by way of remetalling, machining etc |
10 | Providing/fitting of connection plate for Horizontal motor as per sample. |
11 | Repairs to 3-Phase 10HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
12 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
13 | Replacement of damaged fans as per sample. |
14 | Repairs to Bearing Housing by way of remetalling, machining etc |
15 | Providing/fitting of connection plate for Horizontal motor as per sample. |
16 | Repairs to 3-Phase 12HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
17 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
18 | Replacement of damaged fans as per sample. |
19 | Repairs to Bearing Housing by way of remetalling, machining etc |
20 | Providing/fitting of connection plate for Horizontal motor as per sample. |
21 | Repairs to 3-Phase 15HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
22 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
23 | Replacement of damaged fans as per sample. |
24 | Repairs to Bearing Housing by way of remetalling, machining etc |
25 | Providing/fitting of connection plate for Horizontal motor as per sample. |
26 | Repairs to 3-Phase 17.5HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
27 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
28 | Replacement of damaged fans as per sample. |
29 | Repairs to Bearing Housing by way of remetalling, machining etc |
30 | Providing/fitting of connection plate for Horizontal motor as per sample. |
31 | Repairs to 3-Phase 20HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
32 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
33 | Replacement of damaged fans as per sample. |
34 | Repairs to Bearing Housing by way of remetalling, machining etc |
35 | Providing/fitting of connection plate for Horizontal motor as per sample. |
36 | Repairs to 3-Phase 25HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
37 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
38 | Replacement of damaged fans as per sample. |
39 | Repairs to Bearing Housing by way of remetalling, machining etc |
40 | Providing/fitting of connection plate for Horizontal motor as per sample. |
41 | Repairs to 3-Phase 30HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
42 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
43 | Replacement of damaged fans as per sample. |
44 | Repairs to Bearing Housing by way of remetalling, machining etc |
45 | Providing/fitting of connection plate for Horizontal motor as per sample. |
46 | Repairs to 3-Phase 40HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
47 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
48 | Replacement of damaged fans as per sample. |
49 | Repairs to Bearing Housing by way of remetalling, machining etc |
50 | Providing/fitting of connection plate for Horizontal motor as per sample. |
51 | Repairs to 3-Phase 45HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
52 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
53 | Replacement of damaged fans as per sample. |
54 | Repairs to Bearing Housing by way of remetalling, machining etc |
55 | Providing/fitting of connection plate for Horizontal motor as per sample. |
56 | Repairs to 3-Phase 50HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
57 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
58 | Replacement of damaged fans as per sample. |
59 | Repairs to Bearing Housing by way of remetalling, machining etc |
60 | Providing/fitting of connection plate for Horizontal motor as per sample. |
61 | Repairs to 3-Phase 60HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
62 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
63 | Replacement of damaged fans as per sample. |
64 | Repairs to Bearing Housing by way of remetalling, machining etc |
65 | Providing/fitting of connection plate for Horizontal motor as per sample. |
66 | Repairs to 3-Phase 75HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
67 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
68 | Replacement of damaged fans as per sample. |
69 | Repairs to Bearing Housing by way of remetalling, machining etc |
70 | Providing/fitting of connection plate for Horizontal motor as per sample. |
71 | Repairs to 3-Phase 100HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
72 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
73 | Replacement of damaged fans as per sample. |
74 | Repairs to Bearing Housing by way of remetalling, machining etc |
75 | Providing/fitting of connection plate for Horizontal motor as per sample. |
76 | Repairs to Horizontal Pump having discharge from and above 3000GPH and below 10000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. |
77 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
78 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
79 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
80 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
81 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
82 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
83 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
84 | Providing and fitting of metallic Palmative packing |
85 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
86 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
87 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
88 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
89 | Repairs to Horizontal Pump having discharge from and above 10000GPH and below 30000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. |
90 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
91 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
92 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
93 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
94 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
95 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
96 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
97 | Providing and fitting of metallic Palmative packing |
98 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
99 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
100 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
101 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
102 | Repairs to Horizontal Pump having discharge from and above 30000GPH and below 50000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. |
103 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
104 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
105 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
106 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
107 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
108 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
109 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
110 | Providing and fitting of metallic Palmative packing |
111 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
112 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
113 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
114 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
115 | Repairs to Horizontal Pump having discharge from and above 50000GPH and below 90000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load. |
116 | Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample. |
117 | Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample |
118 | Fabrication providing and fitting of Split type MS gland (Machined/Finished) |
119 | Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring |
120 | Remetalling of bearing seats, and finishing to size for proper fitment of bearings |
121 | Remetalling of Pump shaft and finishing to size for proper fitment of bearings |
122 | Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample. |
123 | Providing and fitting of metallic Palmative packing |
124 | Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample |
125 | Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample |
126 | Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones. |
127 | Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones. |
128 | Replacement of MS Hub TC-series rubber tyre motor couplings( complete assembly) of following sizes:- |
129 | TC-11 |
130 | TC-12 |
131 | TC-13 |
132 | TC-14 |
133 | TC-15 |
134 | TC-16 |
135 | TC-17 |
136 | TC-18 |
137 | Providing and fitting of rubber tyre part only to TC couplings of following sizes |
138 | TC-11 |
139 | TC-12 |
140 | TC-13 |
141 | TC-14 |
142 | TC-15 |
143 | TC-16 |
144 | TC-17 |
145 | TC-18 |
146 | Providing of metallic rope/gland packing offollowing thickness |
147 | 6mm |
148 | 10mm |
149 | 12mm |
150 | 15mm |
151 | Repairs to 3-Phase 25HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
152 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
153 | Replacement of damaged Bearing Housing as per sample. |
154 | Replacement of damaged fan as per sample. |
155 | Repairs to Bearing Housing by way of remetalling, machining etc |
156 | Providing/fitting of connection plate for Vertical motor as per sample. |
157 | Repairs to 3-Phase 30HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
158 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
159 | Replacement of damaged Bearing Housing as per sample. |
160 | Replacement of damaged fan as per sample. |
161 | Repairs to Bearing Housing by way of remetalling, machining etc |
162 | Providing/fitting of connection plate for Vertical motor as per sample. |
163 | Repairs to 3-Phase 40HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
164 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
165 | Replacement of damaged Bearing Housing as per sample. |
166 | Replacement of damaged fan as per sample. |
167 | Repairs to Bearing Housing by way of remetalling, machining etc |
168 | Providing/fitting of connection plate for Vertical motor as per sample. |
169 | Repairs to 3-Phase 45HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
170 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
171 | Replacement of damaged Bearing Housing as per sample. |
172 | Replacement of damaged fan as per sample. |
173 | Repairs to Bearing Housing by way of remetalling, machining etc |
174 | Providing/fitting of connection plate for Vertical motor as per sample. |
175 | Repairs to 3-Phase 50HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
176 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
177 | Replacement of damaged Bearing Housing as per sample. |
178 | Replacement of damaged fan as per sample. |
179 | Repairs to Bearing Housing by way of remetalling, machining etc |
180 | Providing/fitting of connection plate for Vertical motor as per sample. |
181 | Repairs to 3-Phase 60HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
182 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
183 | Replacement of damaged Bearing Housing as per sample. |
184 | Replacement of damaged fan as per sample. |
185 | Repairs to Bearing Housing by way of remetalling, machining etc |
186 | Providing/fitting of connection plate for Vertical motor as per sample. |
187 | Repairs to 3-Phase 75HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
188 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
189 | Replacement of damaged Bearing Housing as per sample. |
190 | Replacement of damaged fan as per sample. |
191 | Repairs to Bearing Housing by way of remetalling, machining etc |
192 | Providing/fitting of connection plate for Vertical motor as per sample. |
193 | Repairs to 3-Phase 100HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
194 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
195 | Replacement of damaged Bearing Housing as per sample. |
196 | Replacement of damaged fan as per sample. |
197 | Repairs to Bearing Housing by way of remetalling, machining etc |
198 | Providing/fitting of connection plate for Vertical motor as per sample. |
199 | Repairs to 3-Phase 120HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load. |
200 | Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight. |
201 | Replacement of damaged Bearing Housing as per sample. |
202 | Replacement of damaged fan as per sample. |
203 | Repairs to Bearing Housing by way of remetalling, machining etc |
204 | Providing/fitting of connection plate for Vertical motor as per sample. |
205 | Repairs to VT Pump having discharge from and above 3000GPH and below 10000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
206 | Line shaft (finished) out of SS-410 material as per sample |
207 | Head shaft (finished) out of SS-410 material as per sample |
208 | Rubber liner centre kit bush |
209 | Muff coupling (finished) out of SS-400 material as per sample |
210 | Gun metal gland bush (finished) as per sample |
211 | MS gland (finished) as per sample |
212 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
213 | GM Wearing Ring (finished) as per sample |
214 | Cooling ring (finished) as per sample |
215 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
216 | Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape |
217 | Check nut (finished) as per sample |
218 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
219 | Cost of scrap copper dismattled windings |
220 | Repairs to VT Pump having discharge from and above 10000GPH and below 30000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
221 | Line shaft (finished) out of SS-410 material as per sample |
222 | Head shaft (finished) out of SS-410 material as per sample |
223 | Rubber liner centre kit bush |
224 | Muff coupling (finished) out of SS-400 material as per sample |
225 | Gun metal gland bush (finished) as per sample |
226 | MS gland (finished) as per sample |
227 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
228 | GM Wearing Ring (finished) as per sample |
229 | Cooling ring (finished) as per sample |
230 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
231 | Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape |
232 | Check nut (finished) as per sample |
233 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
234 | Cost of scrap copper dismattled windings |
235 | Repairs to VT Pump having discharge from and above 30000GPH and below 50000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
236 | Line shaft (finished) out of SS-410 material as per sample |
237 | Head shaft (finished) out of SS-410 material as per sample |
238 | Rubber liner centre kit bush |
239 | Muff coupling (finished) out of SS-400 material as per sample |
240 | Gun metal gland bush (finished) as per sample |
241 | MS gland (finished) as per sample |
242 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
243 | GM Wearing Ring (finished) as per sample |
244 | Cooling ring (finished) as per sample |
245 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
246 | Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape |
247 | Check nut (finished) as per sample |
248 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
249 | Cost of scrap copper dismattled windings |
250 | Repairs to VT Pump having discharge from and above 50000GPH and below 90000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load. |
251 | Line shaft (finished) out of SS-410 material as per sample |
252 | Head shaft (finished) out of SS-410 material as per sample |
253 | Rubber liner centre kit bush |
254 | Muff coupling (finished) out of SS-400 material as per sample |
255 | Gun metal gland bush (finished) as per sample |
256 | MS gland (finished) as per sample |
257 | Facing /treatment of bowel stage and impeller for proper fitment of wearing ring |
258 | GM Wearing Ring (finished) as per sample |
259 | Cooling ring (finished) as per sample |
260 | Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample |
261 | Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape |
262 | Check nut (finished) as per sample |
263 | Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles. |
264 | Cost of scrap copper dismattled windings |
265 | Replacement of damaged Ball/Thrust bearing for different capacity motors with below mentioned sizes of reputed make with all technical labour for disassembling/assembling, transportation/carriage, fitting the new bearing to both DE and NDE and reassembling of pumping unit thereof: |
266 | Bearing : 6308 |
267 | Bearing : 6309 |
268 | Bearing : 6311 |
269 | Bearing : 6312 |
270 | Bearing : 51220 |
271 | Bearing : 6220 |
272 | Bearing : 6311 |
273 | Bearing : 7220 |
274 | Bearing : 7214 |
275 | Bearing : 7322 |
276 | Bearing : 6313/C3 |
277 | Bearing : N 313 ECP |
278 | Bearing : 6316 |
279 | Bearing : 3310 |
280 | Bearing : 6306 |
281 | Bearing : 6312 2Z |
282 | Bearing : 6313 2Z |
283 | Bearing : 6311 2Z |
284 | Bearing : 6310 2Z |
285 | Bearing : 6315 ZZ |
286 | Bearing : 6316 ZZ |
287 | Bearing : 6408 |
288 | Bearing : 7309 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail