}

Tender For For Fixing Of Rate Contract For Repairs To Different Types Of Damaged Horizontal And Vertical Turbine Pumps And Motors Installed At Various Wsss Of District Ganderbal, Budgam And Srinagar For One Year, srinagar-Jammu And Kashmir

Public Health Engineering Department-PHED has published Tender For For Fixing Of Rate Contract For Repairs To Different Types Of Damaged Horizontal And Vertical Turbine Pumps And Motors Installed At Various Wsss Of District Ganderbal, Budgam And Srinagar For One Year. Submission Date for this Tender is 30-11-2022. Turbine Engines Tenders in srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

34748737
Corrigendum : Tender For For Fixing Of Rate Contract For Repairs To Different Types Of Damaged Horizontal And Vertical Turbine Pumps And Motors Installed At Various Wsss Of District Ganderbal, Budgam And Srinagar For One Year
Open Tender
Indian
Jammu And Kashmir
srinagar
30-11-2022

Tender Details

For Fixing Of Rate Contract For Repairs To Different Types Of Damaged Horizontal And Vertical Turbine Pumps And Motors Installed At Various Wsss Of District Ganderbal, Budgam And Srinagar For One Year

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Nov-2022 Corrigendum-I Technical Bid 30-11-2022

Key Value

Document Fees
INR 300 /-
EMD
INR 24000.0 /-
Tender Value
INR 8 Lakhs /-

BOQ Items

Name of Work: For fixing of rate contract for repairs to different types of damaged Horizontal and Vertical Turbine pumps and motors installedat various WSSs of District Ganerbal, Budgam and Srinagar
Sl. No. Item Description
1Repairs to 3-Phase 5HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
2Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
3Replacement of damaged fans as per sample.
4Repairs to Bearing Housing by way of remetalling, machining etc
5Providing/fitting of connection plate for Horizontal motor as per sample.
6Repairs to 3-Phase 7.5HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
7Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
8Replacement of damaged fans as per sample.
9Repairs to Bearing Housing by way of remetalling, machining etc
10Providing/fitting of connection plate for Horizontal motor as per sample.
11Repairs to 3-Phase 10HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
12Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
13Replacement of damaged fans as per sample.
14Repairs to Bearing Housing by way of remetalling, machining etc
15Providing/fitting of connection plate for Horizontal motor as per sample.
16Repairs to 3-Phase 12HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
17Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
18Replacement of damaged fans as per sample.
19Repairs to Bearing Housing by way of remetalling, machining etc
20Providing/fitting of connection plate for Horizontal motor as per sample.
21Repairs to 3-Phase 15HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
22Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
23Replacement of damaged fans as per sample.
24Repairs to Bearing Housing by way of remetalling, machining etc
25Providing/fitting of connection plate for Horizontal motor as per sample.
26Repairs to 3-Phase 17.5HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
27Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
28Replacement of damaged fans as per sample.
29Repairs to Bearing Housing by way of remetalling, machining etc
30Providing/fitting of connection plate for Horizontal motor as per sample.
31Repairs to 3-Phase 20HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
32Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
33Replacement of damaged fans as per sample.
34Repairs to Bearing Housing by way of remetalling, machining etc
35Providing/fitting of connection plate for Horizontal motor as per sample.
36Repairs to 3-Phase 25HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
37Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
38Replacement of damaged fans as per sample.
39Repairs to Bearing Housing by way of remetalling, machining etc
40Providing/fitting of connection plate for Horizontal motor as per sample.
41Repairs to 3-Phase 30HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
42Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
43Replacement of damaged fans as per sample.
44Repairs to Bearing Housing by way of remetalling, machining etc
45Providing/fitting of connection plate for Horizontal motor as per sample.
46Repairs to 3-Phase 40HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
47Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
48Replacement of damaged fans as per sample.
49Repairs to Bearing Housing by way of remetalling, machining etc
50Providing/fitting of connection plate for Horizontal motor as per sample.
51Repairs to 3-Phase 45HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
52Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
53Replacement of damaged fans as per sample.
54Repairs to Bearing Housing by way of remetalling, machining etc
55Providing/fitting of connection plate for Horizontal motor as per sample.
56Repairs to 3-Phase 50HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
57Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
58Replacement of damaged fans as per sample.
59Repairs to Bearing Housing by way of remetalling, machining etc
60Providing/fitting of connection plate for Horizontal motor as per sample.
61Repairs to 3-Phase 60HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
62Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
63Replacement of damaged fans as per sample.
64Repairs to Bearing Housing by way of remetalling, machining etc
65Providing/fitting of connection plate for Horizontal motor as per sample.
66Repairs to 3-Phase 75HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
67Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
68Replacement of damaged fans as per sample.
69Repairs to Bearing Housing by way of remetalling, machining etc
70Providing/fitting of connection plate for Horizontal motor as per sample.
71Repairs to 3-Phase 100HP Horizontal Motor by way of dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
72Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scrap shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
73Replacement of damaged fans as per sample.
74Repairs to Bearing Housing by way of remetalling, machining etc
75Providing/fitting of connection plate for Horizontal motor as per sample.
76Repairs to Horizontal Pump having discharge from and above 3000GPH and below 10000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load.
77Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
78Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
79Fabrication providing and fitting of Split type MS gland (Machined/Finished)
80Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
81Remetalling of bearing seats, and finishing to size for proper fitment of bearings
82Remetalling of Pump shaft and finishing to size for proper fitment of bearings
83Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
84Providing and fitting of metallic Palmative packing
85Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
86Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
87Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
88Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
89Repairs to Horizontal Pump having discharge from and above 10000GPH and below 30000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load.
90Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
91Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
92Fabrication providing and fitting of Split type MS gland (Machined/Finished)
93Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
94Remetalling of bearing seats, and finishing to size for proper fitment of bearings
95Remetalling of Pump shaft and finishing to size for proper fitment of bearings
96Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
97Providing and fitting of metallic Palmative packing
98Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
99Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
100Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
101Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
102Repairs to Horizontal Pump having discharge from and above 30000GPH and below 50000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load.
103Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
104Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
105Fabrication providing and fitting of Split type MS gland (Machined/Finished)
106Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
107Remetalling of bearing seats, and finishing to size for proper fitment of bearings
108Remetalling of Pump shaft and finishing to size for proper fitment of bearings
109Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
110Providing and fitting of metallic Palmative packing
111Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
112Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
113Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
114Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
115Repairs to Horizontal Pump having discharge from and above 50000GPH and below 90000GPH Dismantling of the Horizontal Pumping unit at site, shifting to the workshop in a private load carrier arranged by the firm, repairing, shifting back to site, re-fitting and successful testing on full load.
116Fabrication, providing and fitting of GM wear ring (Machined/Finished) as per sample.
117Fabrication, providing and fitting of GM bush (Machined/Finished) as per sample
118Fabrication providing and fitting of Split type MS gland (Machined/Finished)
119Remetalling of Wear ring seats, then finishing to size for proper fitment of wear ring
120Remetalling of bearing seats, and finishing to size for proper fitment of bearings
121Remetalling of Pump shaft and finishing to size for proper fitment of bearings
122Fabrication providing and fitting of Pump shaft (Machined/Finished) out of SS-410 material, as per sample.
123Providing and fitting of metallic Palmative packing
124Providing and fitting of rubber seal for air tight fitting of split parts of the pump as per sample
125Fabrication and fitting of Coupling key/Cotter (Machined/Finished) as per sample
126Fabrication, providing and fitting of SS impellers as per sample after extraction of the damaged ones.
127Fabrication, providing and fitting of Bronze impellers as per sample after extraction of the damaged ones.
128Replacement of MS Hub TC-series rubber tyre motor couplings( complete assembly) of following sizes:-
129TC-11
130TC-12
131TC-13
132TC-14
133TC-15
134TC-16
135TC-17
136TC-18
137Providing and fitting of rubber tyre part only to TC couplings of following sizes
138TC-11
139TC-12
140TC-13
141TC-14
142TC-15
143TC-16
144TC-17
145TC-18
146Providing of metallic rope/gland packing offollowing thickness
1476mm
14810mm
14912mm
15015mm
151Repairs to 3-Phase 25HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
152Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
153Replacement of damaged Bearing Housing as per sample.
154Replacement of damaged fan as per sample.
155Repairs to Bearing Housing by way of remetalling, machining etc
156Providing/fitting of connection plate for Vertical motor as per sample.
157Repairs to 3-Phase 30HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
158Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
159Replacement of damaged Bearing Housing as per sample.
160Replacement of damaged fan as per sample.
161Repairs to Bearing Housing by way of remetalling, machining etc
162Providing/fitting of connection plate for Vertical motor as per sample.
163Repairs to 3-Phase 40HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
164Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
165Replacement of damaged Bearing Housing as per sample.
166Replacement of damaged fan as per sample.
167Repairs to Bearing Housing by way of remetalling, machining etc
168Providing/fitting of connection plate for Vertical motor as per sample.
169Repairs to 3-Phase 45HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
170Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
171Replacement of damaged Bearing Housing as per sample.
172Replacement of damaged fan as per sample.
173Repairs to Bearing Housing by way of remetalling, machining etc
174Providing/fitting of connection plate for Vertical motor as per sample.
175Repairs to 3-Phase 50HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
176Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
177Replacement of damaged Bearing Housing as per sample.
178Replacement of damaged fan as per sample.
179Repairs to Bearing Housing by way of remetalling, machining etc
180Providing/fitting of connection plate for Vertical motor as per sample.
181Repairs to 3-Phase 60HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
182Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
183Replacement of damaged Bearing Housing as per sample.
184Replacement of damaged fan as per sample.
185Repairs to Bearing Housing by way of remetalling, machining etc
186Providing/fitting of connection plate for Vertical motor as per sample.
187Repairs to 3-Phase 75HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
188Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
189Replacement of damaged Bearing Housing as per sample.
190Replacement of damaged fan as per sample.
191Repairs to Bearing Housing by way of remetalling, machining etc
192Providing/fitting of connection plate for Vertical motor as per sample.
193Repairs to 3-Phase 100HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
194Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
195Replacement of damaged Bearing Housing as per sample.
196Replacement of damaged fan as per sample.
197Repairs to Bearing Housing by way of remetalling, machining etc
198Providing/fitting of connection plate for Vertical motor as per sample.
199Repairs to 3-Phase 120HP Vertical Turbine Motor by way dismantling of the Vertical motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting of pump motor assembly and successful testing on full load.
200Rewinding by using Se enameled Cu-wire (Reputed make) of proper gauge and specification in the stator slots of the motor as per actual pitch and turns after extraction /removal of the damaged/burnt out windings from all stator slots by special tools & tackles, using skilled manpower and cleaning of slots thereof. The job includes insulation of the windings by proper insulating material, varnishing, tape, sleeves, insulated PVC paper, crimpled paper, bamboo sticks, thread etc. Then assembling back of rotor, stator, cover plates, all nuts and bolts of the motor and testing on no load at the workshop. The Old scraps shall be retained by the firm. The rates quoted should be after the deduction of cost of old scrap @ 80% of total weight.
201Replacement of damaged Bearing Housing as per sample.
202Replacement of damaged fan as per sample.
203Repairs to Bearing Housing by way of remetalling, machining etc
204Providing/fitting of connection plate for Vertical motor as per sample.
205Repairs to VT Pump having discharge from and above 3000GPH and below 10000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
206Line shaft (finished) out of SS-410 material as per sample
207Head shaft (finished) out of SS-410 material as per sample
208Rubber liner centre kit bush
209Muff coupling (finished) out of SS-400 material as per sample
210Gun metal gland bush (finished) as per sample
211MS gland (finished) as per sample
212Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
213GM Wearing Ring (finished) as per sample
214Cooling ring (finished) as per sample
215Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
216Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
217Check nut (finished) as per sample
218Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
219Cost of scrap copper dismattled windings
220Repairs to VT Pump having discharge from and above 10000GPH and below 30000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
221Line shaft (finished) out of SS-410 material as per sample
222Head shaft (finished) out of SS-410 material as per sample
223Rubber liner centre kit bush
224Muff coupling (finished) out of SS-400 material as per sample
225Gun metal gland bush (finished) as per sample
226MS gland (finished) as per sample
227Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
228GM Wearing Ring (finished) as per sample
229Cooling ring (finished) as per sample
230Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
231Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
232Check nut (finished) as per sample
233Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
234Cost of scrap copper dismattled windings
235Repairs to VT Pump having discharge from and above 30000GPH and below 50000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
236Line shaft (finished) out of SS-410 material as per sample
237Head shaft (finished) out of SS-410 material as per sample
238Rubber liner centre kit bush
239Muff coupling (finished) out of SS-400 material as per sample
240Gun metal gland bush (finished) as per sample
241MS gland (finished) as per sample
242Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
243GM Wearing Ring (finished) as per sample
244Cooling ring (finished) as per sample
245Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
246Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
247Check nut (finished) as per sample
248Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
249Cost of scrap copper dismattled windings
250Repairs to VT Pump having discharge from and above 50000GPH and below 90000GPH Dismantling of the pumping unit at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successful testing on full load.
251Line shaft (finished) out of SS-410 material as per sample
252Head shaft (finished) out of SS-410 material as per sample
253Rubber liner centre kit bush
254Muff coupling (finished) out of SS-400 material as per sample
255Gun metal gland bush (finished) as per sample
256MS gland (finished) as per sample
257Facing /treatment of bowel stage and impeller for proper fitment of wearing ring
258GM Wearing Ring (finished) as per sample
259Cooling ring (finished) as per sample
260Repairs to gland box by way of removing of damaged studs and providing and fitting of new studs as per sample
261Re-metalling of bearing seats and coupling seat then turing and finishing to size and shape
262Check nut (finished) as per sample
263Ball bearing No: as per sample after removing old damaged bearing by skilled labours and tools/ tackles.
264Cost of scrap copper dismattled windings
265Replacement of damaged Ball/Thrust bearing for different capacity motors with below mentioned sizes of reputed make with all technical labour for disassembling/assembling, transportation/carriage, fitting the new bearing to both DE and NDE and reassembling of pumping unit thereof:
266Bearing : 6308
267Bearing : 6309
268Bearing : 6311
269Bearing : 6312
270Bearing : 51220
271Bearing : 6220
272Bearing : 6311
273Bearing : 7220
274Bearing : 7214
275Bearing : 7322
276Bearing : 6313/C3
277Bearing : N 313 ECP
278Bearing : 6316
279Bearing : 3310
280Bearing : 6306
281Bearing : 6312 2Z
282Bearing : 6313 2Z
283Bearing : 6311 2Z
284Bearing : 6310 2Z
285Bearing : 6315 ZZ
286Bearing : 6316 ZZ
287Bearing : 6408
288Bearing : 7309
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail