Public Works Department-PWD has published Tender For Providing, Installation And Commissioning Of Air Conditioning Machines For Air Conditioning System At New Dining Hall And Others Conference Hall And Rooms Of Pragya Bhavan During Ensuing Visit Of Honble Prime Minister Of India. Submission Date for this Tender is 18-11-2022. Air Conditioner Tenders in agartala Tripura. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Providing of Split type High wall 2.00 TR (6,000 Kcal/ hr.) split A.C. Machine with Inverter Compressor technology operating on non-CFC refrigerant (R-410A/R-32/equivalent refrigerants) suitable for wall mounting conforming to IS:1391 (Part-II) specification (Evaporator & Condenser must have copper pipe) suitable for operation on 230 volt +- 10%,not less than 3 (Three) Star rating (2019 Standard), 50Hz, Single PhaseAC Supply capable of performing a) Cooling b) Dehumidifying c) Air Circulation d) Filteringas per direction of the Engineer-in-Charge. |
2 | Standard installation of 1.5 TR/2.00 TRcapacity Hi-Wall Split type Air Conditioner in/c repairing of drilled wall by cement mortar, painting in/c necessary insulation, clamping and warping by white masking tapeof copper pipes,and also providing electrical 3 pin 16 amp Top for connection in socket & necessary scaffoldingetc. complete as per direction of the Engineer-in-Charge. |
3 | Supply and installation of additional length of copper pipe of suitable diameter for suction and liquid linebetween indoor and outdoor units (for 1.5 TR & 2 TR ac) beyond the standard length as per direction of the Engineer-in-Charge. |
4 | Fabrication of M.S. platform for placement of condensing unit by using M.S. angle of (50x50x5) mm size base plate, nuts & bolts or cradle of suitable sizes or suitable creadle i/c painting, fitting, fixing grouting by cement mixer as per direction of the Engineer-in-Charge. |
5 | Providing hard PVC pipe of best quality of 25 mm diameter including necessary clamping and fitting for draining of condensate water from indoor unit as per direction of the Engineer-in-Charge. |
6 | Providing and connecting Electric Control cables between MCB to indoor/outdoor. 3C X 2.5 Sq. Mm Copper Cable. |
7 | Providing of 4 to 4.5 TR(not less than 12000Kcal/hr) Vertical split AC machine with Inverter Compressor technology operating & hermitically sealed compressor operating on R22/R-410 A /non CFC equivalent refrigerants suitable for floor mounting, suitable for operation on 3 PhaseAC supply capable of performing A) cooling, B) Dehumidify, C) Air circulation, d) Filtering.etc. complete as per direction of Engineer -in- charge. |
8 | Installation and commissioning of 3 TR /4/4.5 TR vertical split AC unit with vaccumising, Nitrogen pressure testing, first charge of refrigerant including providing Refrigerent & cable connection from MCB to Outdoor/indoor etc. (upto 3mtr) complete as per direction of theEngineer in Charge . |
9 | Providing & installation of Hard Drawn copper piping with insulation for vertical split AC as per direction of the Engineer-In-Charge. 3/4" OD / applicable OD based on manufacturer guidelineetc. complete as per direction of Engineer -in- charge. |
10 | Providing & installation of Hard Drawn copper piping with insulation for vertical split AC as per direction of the Engineer-In-Charge. 1/2"OD / applicable OD based on manufacturer guidelineetc. complete as per direction of Engineer -in- charge. |
11 | Providing and fitting-fixing of VI pad for outdoor unit forVertical split AC unit as per direction of theEngineer in Charge . |
12 | Providing, fitting & fixing of cradle/suitable structure (Base) made of M.S. angle of 65 x 65 x 6 mm, nuts & bolts etc. i/c painting, fitting, fixing, grouting for placement of outdoor unit complete for vertical split AC as per direction of the Engineer-In-Charge. |
13 | Providing, fitting & fixing of suitable structure (Base) made of M.S. angle of 65 x 65 x 6 mm, nuts & bolts etc. i/c painting, fitting, fixing grouting for placement of indoor unit, the M.S base should be enclosed by 12 mm water proof ply with formica pasting/ACP sheet complete for vertical split AC as per direction of the Engineer-in-charge. |
14 | Providing & Fitting fixing ofElectric Control cable (5 core) suitable for connectin between MCB to Outdoor unit / indoor unit etc complete as per direction of the Engineer-in-charge. 5Cx 4.0 sq.mm cu cable |
15 | ProvidingAdditional Refrigerant gas to the AC units as per direction of the Engineer-in-charge. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail