Housing Urban and Rular Development Government Departments Closing in 0 days TDR #34737475

Tender For Road From Upper Dikhalmukh To To Radhaso

Issued by Government Departments · East Kameng, Arunachal Pradesh
Tender Value
4.98 Crore
Estimated cost
Bid Submission
16 Nov 2022
0 days left
EMD
4.98 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
East Kameng → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Road From Upper Dikhalmukh To To Radhaso C/O Road From Upper Dikhalmukh To Radhasso (8.5 Kms) (Including 100 Mtr Bridge), Pakke Kessang District.

BOQ

Name of Work: C/O Road from Upper Dikhalmukh to Radhasso (8.5 KMs) (including 100 Mtr bridge), Pakke Kessang District.
Sl. No. Item Description
1SH-1:SITE CLERANCE
2Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) (i) B y Manual Means:-A In area of light jungle
3SH-2: FORMATION CUTTING
4Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
5Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
6A) Ordinary rock (with or without blasting)
7Deduct for quantum of earth work of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Soil/Hard Shale, soil containing shingle or small size boulders.)
8Deduct for quantum of earth work of all types disposal directly by throwing into the valley without involving any lead and lift.(Ordinary and Hard Rock)
9Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transportating to site, spreadind, grading to required slope and compacting to meet requirement of table 300-2)
10Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres)) A Mechanical means
11SH-3:GSB
12Preparation of Sub-Grade
13Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth,lead upto 50 m.)
14Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
15Granular Sub-base with Close Graded Material (Table:- 400-1)
16Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (i) for grading- I Material
17SH-4: RCC Slab Culvert 1m Span - 1.50m height = 7 Nos
18Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
19Ordinary soil
20B Mechanical Means
21(i) upto 3 m depth (without de-watering)
22PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
23Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
24Coursed rubble masonry (first sort )
25Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m
26Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
27RCC Grade M20
28Using Concrete Mixer
29For solid slab super-structure,20-30% of (a+b+c)
30Height upto 5m
31Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
32Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
33Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification
34a)Granular material
35RCC Slab Culvert 2m Span - 2m height) - 2 Nos
36Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
37Ordinary soil
38B Mechanical Means
39(i) upto 3 m depth (without de-watering)
40PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
41Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
42Coursed rubble masonry (first sort )
43Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
44PCC Grade M20
45Height upto 5m
46Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
47RCC Grade M20
48Using Concrete Mixer
49For solid slab super-structure,20-30% of (a+b+c)
50Height upto 5m
51Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
52Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
53Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification
54a)Granular material
55RCC Slab Culvert 4m Span - 4m height - 1 Nos
56Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
57Ordinary soil
58B Mechanical Means
59(i) upto 3 m depth (without de-watering)
60PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
61Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
62Coursed rubble masonry (first sort )
63Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
64PCC Grade M20
65Height upto 5m
66Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
67RCC Grade M20
68Using Concrete Mixer
69For solid slab super-structure,20-30% of (a+b+c)
70Height upto 5m
71Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
72Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
73Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification
74a)Granular material
75RCC Slab Culvert 6m Span - 4m height - 2 Nos
76Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
77Ordinary soil
78B Mechanical Means
79(i) upto 3 m depth (without de-watering)
80PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
81Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
82Coursed rubble masonry (first sort )
83Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
84PCC Grade M20
85Height upto 5m
86Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
87RCC Grade M20
88Using Concrete Mixer
89For solid slab super-structure,20-30% of (a+b+c)
90Height upto 5m
91Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
92Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
93Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification
94a)Granular material
95SH-5: PROTECTION WORKS- RETAINING WALL
96( SH: Retaining Wall 4.00 Height 10.00 Length)
97Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
98Ordinary soil
99B Mechanical Means
100(i) upto 3 m depth (without de-watering)
101PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
102Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
103Random Rubble Masonry
104Dry rubble Flooring
105Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification
106Granular material
107Providing weep holes in brick masonary /plain/ reinforced concrrete abutment, W/wall/ R/wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1 V : 20H towards drawing face complete as per drawing and technical specification.
108PROTECTION WORKS - Breast Wall 3.00 mtr Height 10.00 mtr Length - 20 Mtr
109Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
110Ordinary soil
111Manual Means
112upto 3 m depth
113PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
114Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
115Random Rubble Masonry
116Dry rubble Flooring
117Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification
118Granular material
119Providing weep holes in brick masonary /plain/ reinforced concrrete abutment, W/wall/ R/wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1 V : 20H towards drawing face complete as per drawing and technical specification.
120SH6:-BaileyBridge
121Sub Head :BRIDGE ABUTMENTS
122Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
123Ordinary soil
124Mechanical Means
125Depth upto 3 m (without de-watering)
1263 m to 6 m depth (with de-watering)
127Above 6 m depth (with de-watering)
128Ordinary rock (not requiring blasting)
129Mechanical Means
130Depth upto 3 m ( with de-watering)
131PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
132Plain/Reinforced cement concrete in foundation complete as per drawing and technical specifications.
133RCC Grade M25(a) Using concrete mixer.
134Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications.
135RCC Grade M25
136(p) Height upto 5m
137(a) Using concrete mixer.
138(q) Height 5m to 10m
139Case I Using concrete Mixer
140Supplying,fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications
141Supplying,fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications.
142Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
143Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification.
144Granular material
145Sub Head- WING WALLS
146Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)
147Ordinary soil
148Mechanical Means
149Depth upto 3 m (without de-watering)
150PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
151Stone masonry work in cement mortar 1:3 in foundation complete asper drawing and Technical Specification
152(b) Random Rubble Masonry
153Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
154Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification

AI Tender Summary

OUR REF NO 34737475
AUTHORITY Government Departments
TENDER VALUE 4.98 Crore
LAST DATE 16-11-2022
Authority
Authority Name Public Works Department
Work Description Road From Upper Dikhalmukh To To Radhaso C/O Road From Upper Dikhalmukh To Radhasso (8.5 Kms) (Including 100 Mtr Bridge), Pakke Kessang District.
Basic Detail
Tender No PKD/SSD/NIT/RIDF/2022-23/18
Bidding Type Tender
Location
City East Kameng
State Arunachal Pradesh
Key Dates
Publish Date 10 Nov 2022
Submission Date 16 Nov 2022
Open Date 18 Nov 2022
Finance
Tender Value 4.98 Crore
Tender Fee 2000
EMD 4.98 Lakhs
Exemption Not Available
Document List
06b392e9-3079-4d56-8606-502602123e07.html
BOQ_1006.xls
SBD_Dikhalmukh_Road.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 10, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 18, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

06b392e9-3079-4d56-8606-502602123e07.html

xls

BOQ_1006.xls

pdf

SBD_Dikhalmukh_Road.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders