|
| 1 | Design, Suplly, installation , testing , Integration & commissioning of ongrid Solar Photo voltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GIstructure of suitable strength with following components complete as required:-a) Solar Photo voltaic Module of capacity 540Wp or above, manufactured in India, conforming to IS14286/ IEC61215, IS/IEC61730-Part-1, IS/IEC61730-Part-2. Solar Photo voltaic Module conversion efficiency shall not be less than 16.5%. PVmodules used in solar power plants/ systems must be warranted for their out put peak watt capacity, which should not be less than 90% at the end of 10years and 80% at the end of 25 years. b)Power Conditioning Unit (PCU)of 350-800V DC Input voltage range and 400V AC, three phase, 4wire, 50Hz+/-2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3%and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d)Fixing of Array junction box & Main junction box with IP65 protection and termination arrangement for incoming and out going cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f)Connections & Inter connections by supplying & fixing required size XLPE insulated copper conductor 1.1kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. |
| 2 | Note: Optimum wattage of each module, no of modules considered and technical details should be given in technical bid. |
| 3 | (MNRE approved Bench mark rate) |
| 4 | The following shall be supplied along with the SPP as pre requisite. |
| 5 | a) DC COMBINER BOXES FOR 150 kWP SPP |
| 6 | b) DC DISTRIBUTION BOXES |
| 7 | c) GRID –TIE STRING INVERTERS FOR 150 KW SPP – Minimum20 kVA output |
| 8 | d) AC DISTRIBUTION BOXES , IP 65 with ACB\"s, Synch Relay, Multifunction meter, LED Indicator |
| 9 | e) ARMOURED DATA COMMUNICATION AND SYSTEM CONTROL CABLES |
| 10 | f) GI frame structure with 75 x 75 x 5 mm Hollow sectionHeavy gauge. (Preferably Ballast ype structures shall be used without tampering the roof top to avoid any possible leakage. The structure shall be designed to withstand 200 kmph wind load. |
| 11 | g) ALUMINUM ARMOURED POWER CABLE OF 1.1KV RATING 3.5CORE 240 SQMM |
| 12 | h) COPPER ARMOURED POWER CABLES FOR 150 KW SPP |
| 13 | i)EARTHING AND LIGHTNING PROTECTIONFOR 150 KW SPP |
| 14 | j)SCADA CUM WEATHER SENSOR STATION –DATA ACQUISTION, PERFORMANCE MONITORING & REPORTING: |
| 15 | Make, model nos for weather station & SCADA, measured , monitored & accuracy levels parameters considered, at what level the parameters inputs are taken, software & hard ware details along with quantities consired and all technical details in a tabular form should be given in technical bid |
| 16 | (The structural consideration shall be certified by a structural engineer to withstand a wind speed of 200 km/h |
| 17 | \"NOTE:-THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.\" |