Tender For Construction Of Boys Toile At Pues Kelaparai In Package No. Tn04-49 / Agamt Ii 2022-2023 Harur Block P49
Tender Value
5.30 Lakhs
Estimated cost
Bid Submission
18 Nov 2022
0 days left
EMD
6000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
harur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Construction Of Boys Toile At Pues Kelaparai In Package No. Tn04-49 / Agamt Ii 2022-2023 Harur Block P49
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Boys Toile @ PUES Kelaparai H/O Ellapudayampatti |
| 2 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm. |
| 3 | Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete |
| 4 | Random rubble in cement Mortar 1:5 (One cement and five sand) using including mixing mortar and all other labour charges etc complete upto basement |
| 5 | Filling the Basement with excavated earth other than sand etc., complete complying to standard specification. |
| 6 | Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification. |
| 7 | Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel ang |
| 8 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS ) |
| 9 | RCC 1: 1 1/2:3 mix using 20mm ISS HBG metal for RCC works excluding centering, shuttering, and reinforcement grill but including laying, ramming, curing etc, completed |
| 10 | Brick jelly 40mm sixe for filling soak pit inner etc complete complying with standared specification including & conveyance and all laobour charges etc. |
| 11 | Supplying and fixing of Indian type water closet including all charges etc |
| 12 | Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification. |
| 13 | Plastering with Cement Mortar 1:4 mix 20mm thick in all floor complying with standardspecification. |
| 14 | Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification. |
| 15 | Pavinig the Floor with scratch proof antiskid tiles of size 200x200x20mm in cm 1:3,20mm thick.and pointing with whiote cement 0.40kg per sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with |
| 16 | Dadooing walls with Glazed tiles of any colour and any size laid in cm 1:2,10 mm tk.and pointing with white cement 0.40 kg per sqm mixed with colouring pigments to siut the colour of the tiles including finishing the joints neatly complying with standared |
| 17 | Towards the cost of steel door of size 0.75mx1.80m including all charges etc. |
| 18 | Towards the cost of steel door of size 0.75mx1.80m including all charges etc. |
| 19 | Distembering two coats using best approved Interiar oil destember with one coat primer overNew plastered Surface including costand conveyance of materials and labour charges etc complete |
| 20 | Exterior emulsion two coats using best freshly burnt shell lime ain all the floors using best quality and approved verity of colouring pigments including cost of lime,colouring pigments,fevicol type gum,brushes,scaffolding etc.,complete. |
| 21 | Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specific |
| 22 | Provision for supply supply/ sanitary arrangement |
| 23 | Provision for Electrification work |
| 24 | Provision for 500 Lit PVC water tank |
| 25 | Provision for Supplying and fixing RCC Jolly |
| 26 | Provision for Leach pit cover slab |
| 27 | Provision for hand rail for ramp |
| 28 | Provision for hand rail for DA Toilet |
| 29 | Provision for RWH |
| 30 | Provision for supply and fixing of wash basin |
| 31 | Provision of Name Board |
| 32 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Nov 08, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedNov 18, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 18, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender