|
| 1 | Remuneration for Local Staff |
| 2 | Team Leader cum Senior Highway Engineer |
| 3 | Senior Bridge Engineer |
| 4 | Highway cum Pavement Engineer |
| 5 | Material cum Geotechnical Engineer cum Geologist |
| 6 | Senior Survey Engineer |
| 7 | Traffic and Safety Expert |
| 8 | Enviroment Specialist |
| 9 | Quantity Surveyor / Documentation expert |
| 10 | Sub Professional Staff (To be assessed by consultant as per requirement of assignment) |
| 11 | Position |
| 12 | Position |
| 13 | Position |
| 14 | Position |
| 15 | Position |
| 16 | Position |
| 17 | Position |
| 18 | Support StaffNote : To be assessed by consultant as per requirement of assignment) |
| 19 | Office Manager |
| 20 | Typist |
| 21 | Office Boy |
| 22 | Night Watchman |
| 23 | Transportation (Fixed Cost) |
| 24 | The Vehicle provided by the consultant shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etcA. For use of Consultants |
| 25 | Duty travel to Site (Fixed Cost) |
| 26 | Trips |
| 27 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 28 | Office Supplies Drafting |
| 29 | Supplies Computer |
| 30 | Running Costs |
| 31 | Domestic and International Communication |
| 32 | Office Furniture and Equipment (Rental) |
| 33 | Office Furniture and Equipment |
| 34 | Reports and Document Printing |
| 35 | Monthly Reports (3 Copies per month) |
| 36 | Inception Report & QAP |
| 37 | Environment and Social Impact Screening Report |
| 38 | Draft Feasibility Report |
| 39 | Final Feasibility Report |
| 40 | Strip Plan with L.A. Reports |
| 41 | Draft LA and Clearances I Report |
| 42 | Final LA and Clearances I Report |
| 43 | Draft Enviroment Assessment report & RAP |
| 44 | Final Enviroment Assessment report & RAP |
| 45 | Draft Detailed Design Report & Drawings etc. |
| 46 | Draft EMP |
| 47 | Draft Bidding Document |
| 48 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP |
| 49 | Final EMP |
| 50 | Final Bidding Documents |
| 51 | Draft 3(a), 3(A) and 3(D) notification for land acquisition (03 copies each) |
| 52 | LA & Clearances II Report |
| 53 | Survey and Investigation |
| 54 | A. Tropographical Survey (Fixed Cost) |
| 55 | Tropographical Survey including hire charges for eqipment and supply of survey team comprising of project survey field staff etc. inclusive of cost of materials, labourer |
| 56 | Detailed topograhic surveys using mobile/aerial LiDAR or equivalent technology |
| 57 | B. Investigation (Fixed Cost) |
| 58 | Road and Bridge Inventory |
| 59 | BBD Test and Pavement Evaluation |
| 60 | Roughness Survey |
| 61 | Axle Load Survey |
| 62 | Material Survey and Investigation |
| 63 | Sub-grade Investigation |
| 64 | Traffic Survey |
| 65 | Socio-economic & Census Survey/Studies |
| 66 | Land Acquisition Studies |
| 67 | Any other Investigation/Surveys |
| 68 | Sub-soil Investigation |
| 69 | Boring in all type of soils (Other than hard rock) |
| 70 | Boring in hard rock |
| 71 | Estimate of Cost for Expatriate Consultants ( Name and Position to be filled in below columns by the bidder)Renumeratrion of Expatriate Satff including per diem allowance |
| 72 | Position |
| 73 | Position |
| 74 | Position |
| 75 | Position |
| 76 | Position |
| 77 | Position |
| 78 | Mobilization and Demobilization - International Airfares (Fixed Cost) (To be filled by the bidder in below columns) |
| 79 | Position |
| 80 | Position |
| 81 | Position |
| 82 | Position |
| 83 | Position |
| 84 | Position |
| 85 | Mobilization and Demobilization -Inland Travel in Home Country (Fixed Costs) |
| 86 | Other Miscellaneous expenses (Like DA, Internal travel expenses other than incidentals) (Fixed Cost) |