Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #34696779

Tender For Survey, Design And Construction Of Ofbudhana W/S Scheme Of Block Jakholi, Consisting Of Rcc Intake Works I.E., Intake Chamber, Bfg, Scc Cum R/F, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Appurtenant Works Etc. Including Supply &

Issued by Government Departments · jakholi, Uttarakhand
Tender Value
2.17 Crore
Estimated cost
Bid Submission
21 Nov 2022
0 days left
EMD
4.35 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
jakholi → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Survey, Design And Construction Of Ofbudhana W / S Scheme Of Block Jakholi, Consisting Of Rcc Intake Works I.E., Intake Chamber, Bfg, Scc Cum R / F, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Appurtenant Works Etc. Including Supply & Cartage Of Allmaterials, Labor And T&P Etc. Complete For Completion Of Works. It Is Also Including Testing, Commissioning Ofscheme With Six Months Trial & Run After Handing Over The Scheme To Ujs For Its Maintenance

BOQ

Name of Work: Survey, Design andConstruction of ofBudhana W/S Scheme of Block Jakholi, consisting of RCC Intake works i.e., Intake Chamber, BFG, SCC cum R/F, Supply main, RCC CWRs, distribution systems, FHTC and all appurtenant works etc. including supply & cartage of allmaterials, labor and T&P etc. complete for completion of works. It is also including testing, commissioning ofScheme with six months trial & run after handing over the Scheme to UJS for its maintenance.
Sl. No. Item Description
1SOURCE WORKS
2Construction ofIntake chamber to fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
3Construction of RCC Gadhera tapping arrangement i.e., 4m wide Cross wall Boulder Filled Gallery with Intake chamberto fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge.
4Survey, design and Constructionof Roughening Filter with filling of supporting & filter media (submitted design should be as pertype design subject to site condition) including all materials, cartage labour, T&P etc. required for proper completion of work
5Confirmatorysurvey, design, supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connectingwith existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc completeand make properfunctioning, confirming to IS:1239 at site of works. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of supply main & distribution main for checking of thickness of pipebefore ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
615 mm dia - GI (M)
720 mm dia - GI (M)
825 mm dia - GI (M)
932 mm dia - GI (M)
1040 mm dia - GI (M)
1150 mm dia - GI (M)
1265 mm dia - GI (M)
13Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
1420mm dia
1525mm dia
1632mm dia
1740mm dia
1850mm dia
1965mm dia
20Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock
21Soil mixed with boulder (SMB)
22Medium Rock (MR)
23Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
2420 mm dia
2525mm dia
2632mm dia
2740 mm dia
2850 mm dia
2965 mm dia
30Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
3120mm dia (CI Air Valve)
32ConstructingWheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
33Constructingmasonry Air Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
34Construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation,0.60 M wide appron with 15 cm PC drain,required sluice valve chamber, MS manhole with locking arrangement, two coat snowcem/distemper/painting including wall writing as per instructions given by E\"ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc,complete. (Cap. in KL)
355.50KL
3620.00 KL
3722.50 KL
3840.00KL
39Supply cartage and fixing ofBucket type chlorinator of 25 Liter capacity at top of service raservoirs.
40Supply, Cartage of all materials, labours, T&P, etc complete making of ferrule connection to provide FHTC to the consumers from existing/Newly laid pipe lines under scheme as per instruction given by Engineer-In-charge.
41Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
42Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
43R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
44R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.

AI Tender Summary

OUR REF NO 34696779
AUTHORITY Government Departments
TENDER VALUE 2.17 Crore
LAST DATE 21-11-2022
Authority
Authority Name Drinking Water And Sanitation Department
Work Description Survey, Design And Construction Of Ofbudhana W / S Scheme Of Block Jakholi, Consisting Of Rcc Intake Works I.E., Intake Chamber, Bfg, Scc Cum R / F, Supply Main, Rcc Cwrs, Distribution Systems, Fhtc And All Appurtenant Works Etc. Including Supply & Cartage Of Allmaterials, Labor And T&P Etc. Complete For Completion Of Works. It Is Also Including Testing, Commissioning Ofscheme With Six Months Trial & Run After Handing Over The Scheme To Ujs For Its Maintenance
Basic Detail
Tender No 2635/Lekha-05/293 Dated 15.09.2022
Bidding Type Tender
Location
City jakholi
State Uttarakhand
Key Dates
Publish Date 07 Nov 2022
Submission Date 21 Nov 2022
Open Date 23 Nov 2022
Finance
Tender Value 2.17 Crore
Tender Fee 5900
EMD 4.35 Lakhs
Exemption Not Available
Document List
0a5d47b8-8449-4881-b7bd-8e40e0fa8045.html
BOQ_61746.xls
BudhanaTD.pdf
NIT.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 07, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 21, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 23, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

0a5d47b8-8449-4881-b7bd-8e40e0fa8045.html

xls

BOQ_61746.xls

pdf

BudhanaTD.pdf

pdf

NIT.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders