Military Engineer Services-MES has published Tender For Comprehensive Maintenance Of Amf Panels,Changeover Switches And Earthings At Dg Set Installation At Af Stn Yelahanka And Comprehensive Maintenance Of Dg Set Including Replacement Of Defective Parts At Domestic Area At Af Stn Yelahanka. Submission Date for this Tender is 17-11-2022. Switch Supply Tenders in yelahanka Karnataka. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 10-Nov-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 17-11-2022 |
Sl. No. | Item Description |
1 | Comprehensive maintenance of Panels for DG sets with & without for following capacities of DG setsincludingrouting / preventive maintenance checks at least once in a month, for trouble free functioning and attendingbreak downs/ complaints as and when required. (a)Checking all electrical connections. (b)Checking all contact points / Bus bars. (c)Checking / replace timers (AC or DC). (d)Checking / replace buttons. (e)Checking / replace selector switches (volt/Amp meter). (f)Checking / replace indicator lamps. (g)Checking / replace main , auxliary contacts/relays. (h)Checking / replace contact coils . (i)Checking / replace ,volt /amps/energy/ PF/ KWH meters/CT"s. (j)Checking Auto / manual function. (k)Check and tight screws and bolts. (l)Check battery charger out put voltage. (m)Cleaning the panel. |
2 | 250 KVA AMF panel (200KVA=04 Nos and 250 KVA=01 No) (05 Nos x 7 Months) |
3 | 200 KVAwith out AMF panel |
4 | 160 KVA AMF panel |
5 | 125 KVAAMF panel |
6 | 125 KVA without AMF panel |
7 | 100 KVAAMF panel (100 KVA=03 Nos) (03 Nos x 7Months) |
8 | 100 KVA without AMF panel (100 KVA=Mobile DG Set 02 Nos)(02 Nos x 7 Months) |
9 | 63/62.5/50 KVA AMF panel (63 KVA=01, 62.5 KVA=02 Nos, 50 KVA=01 No) (04 Nos x 7 Months) |
10 | 30/25/20/15KVAAMF panel (30 KVA=01, 25 KVA=01, 15 KVA=02) (04 Nos x 7 Months) |
11 | Supply and Fix in repair of Current Transformer 400/5 make: AE |
12 | Supply and Fix in repair of Current Transformer 300/5 make: AE |
13 | Supply and Fix in repairof Current Transformer 200/5make: AE |
14 | Supply and Fixin repairof Current Transformer 30/5 make: AE |
15 | Supply and Fix in repairof Power factor meter , 3 phase Digital type.Make : CONZERV Ref. 30002572 |
16 | M&L for providingcable tag made out of 2 mm thick aluminium plate of size note exeeding 75mm x 25mm clearly engraved "the size of the cable , feeding to & connected to pole No." and tightly clamped to the cable all as directed at site. Note :- The cable size , feeding area & the pole No. connected shall be identified by the contractor correctly. |
17 | Supply & fixing in repairof Indicator (LED) 230VAC/30V DC Cat no. -SIL |
18 | Supply & fixing in repair of Digital Voltmeter (Meco)0 to 500V model DM3210 |
19 | Supply & fixing in repair of Digital Ammeter (Meco)0 to 1000A Model DM3110 |
20 | Supply & fixing in repair of Frequency Meter make:meco DM1310 |
21 | Supply & fixing in repair of GCU 101 (Utopia) Control Unit |
22 | Supply & fixing in repairof OLR (L&T) cat no. SS9414500 |
23 | Supply & fixing in repair of Relay Salzer - MSP-2P SA, 240V AC, 5A,12VDC |
24 | Supply & fixing in repair of Relay (ARC 25P12) 12VDC Salzer |
25 | Supply & fixing in repair of Relay Card |
26 | Supply & fixing in repair of Magnatic Relay- 12V DC |
27 | Supply & fixing in repair of Push Button (TEKNIC/VAISHNO) with ElementsNO+ NC element |
28 | Supply & fixing in repairof Selector Switch - 3W3P, 6 A |
29 | Supply & fixing in repair of Selector Switch - 2W1P,63 A |
30 | Supply & fixing in repair of Selector Switch - 2W2P,63 A |
31 | Supply & fixing in repair of Selector Switch - 3W4P |
32 | Supply & fixing in repair for Selector Switchwith off (3 way) -4 P 3 W,10 A |
33 | Supply & fixing in repair of Selector Switch - 2W, 3P,63 A |
34 | Supply & fixing in repair of S. Switches -Voltmeter Cat no. 61312SBB13TDYR, 10 A |
35 | Supply & fixing in repair of S. Switches Ammeter. Cat no. -61325SCBO3TDHR, 16 A |
36 | Supply & fixing in repair ofING Key |
37 | Supply & fixing in repair ofC.T (Nippen) 25/5A |
38 | Supply & fixing in repair ofC.T. 100/5A |
39 | Supply & fixing in repair of euroload changeover switch 63A 4pole Make: Havells Cat no.-1HCVF00063 |
40 | Earthing complete with copperplate electrode of size 600x600x3mm thick burried directly in ground (earth pit not less than 2,25 mtrs deep below ground level) with top edge of the plate not less than 1,5 m below ground level , connected copperstrip of size 25mm x 3 mm with DG sets , LT panel / AMF Panel etc |
41 | Supply and laying copper strip [size of 25 x 3 mm ]connectto various eath points etc as reqd. |
42 | Supply and laying protection G I pipe size of 40mm,light grade |
43 | Taking down the unserviceable changeover switch after disconnecting from LT panel board, supply and fix new on load type ChangeoverSS enclosure 415 volts 200 amps 4 pole 50Hz including necessary fabrication , addition and alterations all as specified and directed.Make :- Havells/Standard |
44 | Taking down the unserviceable changeover switch after disconnecting from LT panel board, supply and fix new on load type Changeover SS enclosure 415 volts 400 amps 4 pole 50Hzincluding necessary fabrication , addition and alterations all as specified and directed. Make :- Havells/Standard |
45 | Taking down the unserviceable MCCB after disconnecting frompanel board, supply and fix new MCCB415 volts 250 amps 4 pole 50Hz including necessary fabrication , addition and alterations all as specified and directed.make :- Havells / L&T. |
46 | Supply & fixing in repair of Battery charger (Naren) 24V, 20A |
47 | Supply & fixing in repair of Battery Charger 12V, 10Amodel-smps Make-nhp |
48 | AIRMEN MESS |
49 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required (Twice during the contract period) |
50 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required, Burning of ducting and blower, balancing of impeller, painting, replacements of nuts and bolts, rivets etc. (Twice during the contract period) (a) SS Hood cleaning |
51 | Grease filters cleaning |
52 | servicing and repairs including windingsof Exhaust Blower of 5 HP |
53 | SNCO’S MESS |
54 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required ((Twice during the contract period) |
55 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required, Burning of ducting and blower, balancing of impeller, painting, replacements of nuts and bolts, rivets etc. ((Twice during the contract period) (a)SS Hood cleaning |
56 | Grease filters cleaning |
57 | Exhaust Blower of 3 HP |
58 | GI Ducting( Approx ) |
59 | FLIGHT CADETMESS |
60 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required (Twice during the contract period) |
61 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required, Burning of ducting and blower, balancing of impeller, painting, replacements of nuts and bolts, rivets etc. ((Twice during the contract period) (a)SS Hood cleaning |
62 | Grease filters cleaning |
63 | Exhaust Blower of3 HP |
64 | GI Ducting(Approx ) |
65 | OFFICERS MESS |
66 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required.(Twice during the contract period) |
67 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required, Burning of ducting and blower, balancing of impeller, painting, replacements of nuts and bolts, rivets etc. (Twice during the contract period) (a)SS Hood cleaning |
68 | Grease filters cleaning |
69 | Exhaust Blower of 3 HP |
70 | GI Ducting(Approx ) |
71 | 112 HU Cafeteria |
72 | Servicing and cleaning of exhaust hoods along with grease filters with necessary chemical consumables with removal of oil, dust fumes inside and outside of hoods complete as required, Burning of ducting and blower, balancing of impeller, painting, replacements of nuts and bolts, rivets etc. (Twice during the contract period) (a) SS Hood cleaning |
73 | Grease filters cleaning |
74 | servicing of Exhaust Blower of 3 HP |
75 | Remove unserviceable 3HP motor and take to workshop after removing the unserviceable winding with new suitable copper including changing bearings overhauling and testing,refixing as directed by Engr-In-Charge |
76 | Remove unserviceable 5HP motor and take to workshop after removing the unserviceable winding with new suitable copper including changing bearings overhauling and testing,refixing as directed by Engr-In-Charge |
77 | Comprehensive maintenance and servicing of gate barriers of span 5.5 metre,electrically operated, lifting type, of including repairs and servicing of electrical motor, fly wheel,pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directedby Engr-in-Charge. Once in 2 months |
78 | Comprehensive maintenance and servicing of Hangar gateelectrically operated including repairs and servicing of electrical motor, fly wheel, pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc., complete for smooth functioningall as specified and as directedby Engr-in-Charge. Once in 6 Months |
79 | Supply and Fix Electronic Controller for suitable Gate Barrier any make |
80 | DOMESTIC AREA Comprehensive maintenance of DG sets including Alternator for routine check up once in a month of the engine for the smooth functioning and carrying out the complete as per the Manufacturers instructions all as specified and directed by the Engineer-in-Charge for 200 KVA DG set -01 No, installed at New pump house Make: KIRLOSKAR . Note : Items of Rs. upto 500/- which are not catered in the Sch also part of this check Make : KIRLOSKAR. |
81 | A CHECK (every 50 hrs operation or 1 month which ever is earlier) (i)Lubrication/greasing to all parts. (ii) Check engine oil level. FUEL SYSTEM (i) Drain sediment from fuel tanks. AIR SYSTEM (Every 50 Hrs/1 month whichever earlier) (i) Clean pre cleaner dustpan weekly. (ii) Check Air cleaner restriction clean/Change cleaner element if required. COOLING SYSTEM (i) Check coolant level OTHER MAINTENANCE (i) Drainer tank (ii) Check & rectify leakages (iii) Dian fuel filter water fuel filter water separator. (iv) Check belts, adjust if required. |
82 | B CHECK (every 250 Hrs operation or every 6 month which ever is earlier) (i) Repeat "A" Lubrication (ii) Changing Engine Oil (iii) Record oil pressure FUEL SYSTEM (i) Check Hydraulic-Governor Oil (ii) Check Throttle Leakage (iii) Lubricate Ball joints of the throttle linkage of Hydraulic, Governor (iv) Change Fuel filter (v) Clean fuel tank breather AIR SYSTEM (i) Clean/Change Crankcase Breather (ii) Check Air pipings COOLING SYSTEM (i) Check coolant in radiator (ii) ADD Coolant concentrate if required (iii) Check heat exchanger zinc plugs . Note :- Coolant oil and Engine Oil will be measured and paid separetly. |
83 | All as per item No 49 above but 100 KVA set at Receptorium Power House - 02 nos & 125 KVA at New Pump House-01 Nos. Make: KIRLOSKAR /CUMMINS |
84 | A CHECK (Every 50 hrs operation or 01 month whichever is earlier) |
85 | B - CHECK (Every 250 Hrs operation or 6 month whichever is earlier) |
86 | All asper Item Sl No 49 above but DG set of capacity 62.5 KVA installed at 1&2 Pump house/Make : KIRLOSKAR |
87 | A CHECK (Every 50 hrs operation or 01 month whichever is earlier) |
88 | B - CHECK (Every 250 Hrs operation or 6 month whichever is earlier) |
89 | All asper Item Sl No 49 above but DG set of capacity 15/25 KVA Installed in Middle marker / Officers Institute complex. Make : KIRLOSKAR |
90 | A CHECK (Every 50 hrs operation or 01 month whichever is earlier) |
91 | B - CHECK (Every 250 Hrs operation or 6 month whichever is earlier) |
92 | Supply and changing /Top up of engine oil 15W40 CH /I grade Makes; VOLVOLINE [CUMMINS] |
93 | Supply and add coolant in radiator all as directed by Engineer in charge Make -VOLVOLINE [CUMMINS] |
94 | Servicing of radiator assembly complete for cleaning, cooling water spaces cleaning the inter cooler and Supply and fix replace u/rubber hose, pipes,irclip,clamps; cleaning of radiator mix .with appropriate cleaning agent, de-scaling by means of scale solvent aswell as neutralizing agent to arrest leakages by means of brazing etc. all as directed by the Engr-in-charge of following capacities: |
95 | 200 KVA |
96 | 125/100 KVA |
97 | 62.5 KVA |
98 | 15/25 KVA |
99 | M&L for servicing of self starter assembly of DG sets 24/12 volts of following capacities by disc connecting the self starter assembly from the engine and dismantling, cleaning all accessories, replacing worn-out parts like carbon brushes, bushes, contact plates, jumping levels etc and rewinding the/s field coil and varnishing all as directed by Engr-in-charge. NOTE : Major parts like armature, bentex,field coil, solenoid not inculed, and will be measured and paid separetly. |
100 | 200 KVA DG Set |
101 | 125/100 KVA DG Set |
102 | 62.5 KVA DG Set |
103 | 15/25 KVA DG Set |
104 | Suply only the following items for self starter assembly of DG Set. |
105 | Bentex for 200 kva [Make : Delco /130PE] |
106 | Armature for 200 kva [Make : Delco /130PE] |
107 | Field coilfor 200 kva [Make : Delco /130PE] |
108 | Solenoid Switch for for 200 kva [Make : Delco /130PE] |
109 | Bentex for 100 kva [Make : Lucas TVS] |
110 | Armature for 100 kva [Make : Lucas TVS] |
111 | Field coilfor 100 kva [Make : Lucas TVS] |
112 | Solenoid Switch for for 100 kva [Make : Lucas TVS ] |
113 | Bentex for 50/62.5 kva [Make : Lucas TVS] |
114 | Armature for 50/62.5 kva [Make : Lucas TVS] [Make : Lucas TVS] |
115 | Field coilfor 50/62.5kva [Make : Lucas TVS]kva [Make : Lucas TVS] |
116 | Solenoid Switch for for 50/62.5 KVA [Make : Lucas TVS] |
117 | Supply only stopping solenoid coil 12V for 25 KVA/15 KVA DG set |
118 | Supply and fix lead acid battery 180 AH Make :Amco / Exide/SF |
119 | Supply and fix lead acid battery 150 AH make : Amco / Exide/SF |
120 | Opening the coupling, dismantling the alternator carefully removing the flywheel, dismantling the unserviceable starting gear wheel, supply and fixing new staring gear wheel , fixing back the alternator and properly coupled back all as directed for 200 KVA Make : KIRLOSKAR |
121 | All as per item No 61 above but 62.5 KVA DG set |
122 | All as per item No 61 above but 25 KVA DG set |
123 | Supply only Air filter element as per existing make for the following capacities of DG sets |
124 | 125 KVA DG Set |
125 | 100 KVA DG Set |
126 | 25 KVA DG Set |
127 | Replacing the faulty water pump assembly with new one suitable for 200 KVA Make:Kirloskar, I/c necessarygaskets and packing …etc.. As required. |
128 | Supply only fan belts as per existing make for the following capacities of DG sets |
129 | 125 /100 KVA DG Set |
130 | 62.5 KVA DG Set |
131 | 15/25 KVA DG Set |
132 | Supply and fix Tacho drive meter including cable assembly 1.5 mtr length (2000 RPM) Make : KOEL/VDO |
133 | Supply and fix water temp gauge [40 degree C - 120 degreeC] Meehan oil type with accessories [Make : KOEL /VDO/PRICAL] |
134 | Supply and fix oil pressure gauge [7/0-10] Kg/Sqm with all accessories [Make : KOEL/VDO] |
135 | Supply and replace Brass, Battery terminals suitable for +/- leads of existing size all as specified and directed |
136 | Supply and fix Automatic Voltage Regulator for brush type alternator 200 KVA |
137 | Supply and fix Automatic Voltage Regulator for brush type alternator 100 /125 KVA |
138 | Supply and fix Automatic Voltage Regulator for brush type alternator 62.5 KVA |
139 | Supply and fix Automatic Voltage Regulator for brush type alternator 15/25 KVA |
140 | supply and fix alternator surge unit for 200 KVA |
141 | supply and fix alternator surge unit for 100/125 KVA |
142 | supply and fix alternator surge unit for 15/25 KVA |
143 | Suply and Fix Oil pressure senser Unit for 200 KVA DG set |
144 | Suply and Fix Oil pressure senser Unit for 125 KVA DG set |
145 | Suply and Fix High water temparature sensor Unit for 200 kva DG Set |
146 | Suply and Fix Oil pressure senser Unit for 100/125 kva DG set |
147 | Suply and Fix Oil pressure senser Unit for 62.5/15 kva DG set |
148 | Suply and Fix High water temparature senser Unit for 100/125 KVA DG Set |
149 | Replacing the faulty water pump assembly with new one suitable for 200 KVA, Make: Kirloskar I/c necessary gaskets and packing …etc.. As required. |
150 | Replacing the faulty water pump assembly with new one suitable for 100/125 KVA Make:KIRLOSKAR] I/c necessarygaskets and packing …etc.. As required. |
151 | Repair and servicing of 125 KVA fuel injection pump assembly by replacing the unserviceable parts like elements, d-valves , plunger springs, injector nozzles and reassembling testing ...etc as required. |
152 | Supply and fixing the Starter Motor Assembly for 25/15 KVA DG Set Make: Lucas TVS , 12 Volt DC |
153 | Opening the coupling , dismantling the alternator carefully removing the flywheel, dismantling the unserviceable starting gear wheel, supply and fixing new staring gear wheel , fixing back the alternator and properly coupled back of 100 KVA DG Set Make : Kirloskar, all as directed |
154 | Replacing of damaged water separator fuel filter assembly for 125 KVA DG Set Engine, Make : Cummins |
155 | TECHNICAL AREA Comprehensive maintenance of DG sets including replacement of defective parts at sub station DG sets installed at AN-32 Sub Stn & 112 HU Sub Stn and 112 HU DSS & MAFI-II Sub Stn AF Station Yelahanka . (200 KVA-4 & 250 KVA-1). Note : Items of Rs. upto 500/- which are not catered in the Sch also part of this check Make : CUMMINS/ KIRLOSKAR. |
156 | A CHECK (Every 50 hrs operation or 01 month which ever is earlier) (i) Lubrication/greasing to all parts (ii) Check engine oil level FUEL SYSTEM (i) Drain sediment from fuel tanks AIR SYSTEM (every 50 hrs operation or01 month which ever is earlier) (i) Clean pre cleaner dustpan weekly(ii) Check Air cleaner restriction clean/Change cleaner element if required COOLING SYSTEM (i) Check coolant level OTHER MAINTENANCE (i) Drainer tank (ii) Check & rectify leakages (iii) Dian fuel filter water fuel filter water separator (iv) Checks belts, adjust if required |
157 | B - CHECK (Every 250 hrs operation or 06 month which ever is earlier) (i) Repeat "A" Lubrication (ii) Changing Engine Oil (iii) Record oil pressure. FUEL SYSTEM (i) Check Hydraulic-Governor Oil (ii) Check Throttle Linkage (iii) Lubricate Balljoints of the throttle linkage of Hydraulic, Governor (iv) Change Fuel filter (v) Clean fuel tank breather AIR SYSTEM (i) Clean/Change Crankcase Breather (ii) Check Air pipings COOLING SYSTEM (i) Check coolant in radiator (ii) ADD Coolant concentrate if required (iii) Check heat exchanger zinc plugs . Note :- Coolant oil and Engine Oil will be measured and paid separetly. |
158 | Comprehensive maintenance of DG sets including Alternator for routine check up of the engine for the smooth functioning and carrying out the complete as per the Manufacturers instructions all as specified and directed by the Engineer - in - Charge for 160 KVA DG sets installed at Dornier FTD |
159 | A -check (every 50 hrs/1 month which ever is earlier) (a) Repeat the daily checks (b) Check oil level in the oil bath type air cleaner © Check the fan belt tension. (d) Check the electrical connection. |
160 | B - CHECK(Every 250 hours/Six month whichever is earlier) (a) Repeat the "A" Checks (b) Service the oil bath type air cleaner (c) Replace the engine main lub oil filter element & sealing ring (d) Grease the water pump bearing Cleaning the button filter (e) Clean the button filter (f )Drain fuel filler bowls to remove sediments and water (g) Check baltery electrolyte level ,top up with distiIled water,clean terminals and apply petroleum jelly. |
161 | Comprehensive maintenance of DG sets including Alternator for routine check up of the engine for the smooth functioning and carrying out the complete as per the Manufacturers instructions all as specified and directed by the Engineer - in - Charge for 100/125 KVA DG sets installed at AN-32 Sub Stn, 112 HU Sub Station, 15 Tetra school & SRE Complex (100 KVA-03, Make : Greaves Cotton/KIRLOSKER & 125 KVA-01, Make-KIRLOSKAR) |
162 | A CHECK (Every 50 hrs operation or 01 month which ever is earlier) (a) Repeat the daily checks (b) Check oil level in the oil bath type air cleaner (c) Check the fan belt tension. (d) Check the electrical connection. |
163 | B CHECK (Every 250 hours operation or six month whichever is earlier) (a) Repeat the "A" Checks (b) Service the oil bath type air cleaner (c) Replace the engine main lub oil filter element & sealing ring (d) Grease the water pump bearing Cleaning the button filter (e) Clean the button filter (f) Drain fuel filler bowls to remove sediments and water (g) Check battery electrolyte level , top up with distiIled water,clean terminals and apply petroleum jelly. |
164 | All as per item No 92 above but 50/62.5/63 KVA DG Set at IT Complex, ATC and TCCF (MAKE: Greaves Cotton/KIRLOSKAR) |
165 | A CHECK (Every 50 hours operation or 01 month whichever is earlier) |
166 | B CHECK (Every 250 hours operation or 06 months whichever is earlier) |
167 | All as per item No 92 above but 20/30 KVA DG set installed at , Stn HQ and CADF (MAKE:KIRLOSKER) |
168 | A CHECK (Every 50 hours operation or 01 month whichever is earlier) |
169 | B CHECK (Every 250 hours operation or 06 months whichever is earlier) |
170 | Supply and changing /Top up of engine oil 15W-40 CH/I grade Makes; VOLVOLINE [CUMMINS] |
171 | Supply and add coolant oil in radiator all as directed by Engineer-in-charge Make -VOLVOLINE [CUMMINS] |
172 | Servicing of radiator assembly complete for cleaning, cooling water spaces cleaning the inter cooler and Supply and fix replace u/rubber hose, pipes, circlip,clamps; cleaning of radiator mix with appropriate cleaning agent, de-scaling by means of scale solvent as well as neutralizing agent to arrest leakages by means of brazing etc. all as directed by the Engr-in-charge of following capacities: |
173 | 250 /200 KVA DG Set |
174 | 100/125 KVA DG Set |
175 | 62.5/63 KVA DG Set |
176 | 30/20 KVA DG Set |
177 | M&L for servicing of self starter assembly of DG sets 24/12 Volts of following capacities bydis-connecting the self starter assembly from the engine and dismantling, cleaning all accessories, replacing worn-out parts like carbon brushes, bushes, contact plates, jumping levels etc and rewinding the/s field coil and varnishing all as directed by Engr-in-charge. |
178 | 250 /200 KVA DG Set |
179 | 100/125 KVA DG Set |
180 | 62.5/63 KVA DG Set |
181 | 30/20 KVA DG Set |
182 | Suplying following items for self starter assembly of DG Set |
183 | Bentex for 250 KVA DG Set [Make : Delco /130PE] |
184 | Armature for 250 KVA DG Set [Make : Delco /130PE] |
185 | Field coilfor 250 KVA DG Set [Make : Delco /130PE] |
186 | Solenoid Switch for for 250 KVA DG Set [Make : Delco /130PE] |
187 | Bentex for 160 KVA DG Set [Make : Lucas TVS] |
188 | Armature for 160 KVA DG Set [Make : Lucas TVS] |
189 | Field coilfor 160 KVA DG Set [Make : Lucas TVS] |
190 | Solenoid Switch for for 160 KVA DG Set [Make : Lucas TVS ] |
191 | Bentex for 50 KVA DG Set [Make : Lucas TVS] |
192 | Armature for 50 KVA [Make : Lucas TVS] [Make : Lucas TVS] |
193 | Field coilfor 50 KVA DG Set [Make : Lucas TVS]kva [Make : Lucas TVS] |
194 | Solenoid Switch for for 50 KVA [Make : Lucas TVS] kva (Make : Lucas TVS) |
195 | Supply only stopping solenoid coil 12V for 62.5 KVA/30 KVA DG set |
196 | Supply and fix lead acid battery 180 AH make /Amco / Exide /SF |
197 | Supply and fix lead acid battery 150 AH make /Amco / Exide/SF |
198 | Opening the coupling , dismantling the alternator carefully removing the flywheel, dismantling the unserviceable starting gear wheel, supply and fixing new staring gear wheel , fixing back the alternator and properly coupled back all as directed for 160 KVA |
199 | Supply and Fixing of Automatic voltage regulator (AVR) suitable for DG Set 250KVA/200KVA |
200 | Supply and Fixing Automatic voltage regulator (AVR) suitable for DG Set 160 KVA |
201 | Supply and Fixing Automatic voltage regulator (AVR) suitable for DG Set 100/125KVA |
202 | Supply only Air filter element as per existing make for the following capacities of DG sets : |
203 | 250 KVA DG Set |
204 | 200 KVA DG Set |
205 | 160 KVA DG Set |
206 | 100 /125 KVA DG Set |
207 | 50/62.5/63 KVA DG Set |
208 | 30/20 KVA DG Set |
209 | Replacing the faulty water pump assembly with new one suitable for 250 KVA (Make : KIRLOSKAR) I/c necessarygaskets and packing…etc.. As required. |
210 | Supply only fan belts as per existing make for the following capacities of DG Sets |
211 | 250 KVA DG Set |
212 | 200 KVA DG Set |
213 | 160 KVA DG Set |
214 | 100 KVA DG Set |
215 | 50/62.5/63 KVA DG Set |
216 | 20/30 KVA DG Set |
217 | Supply and fix water temp gauge (40 degree C to 120degree C) Meehan oil type with all accessories. Make : KOEL / VDO / PRICOL |
218 | Supply and fix oil pressure gauge (7-10) Kg/Sqm with all accessories. Make : KOEL / VDO / PRICOL |
219 | Supply and fix techo meter with cable assembly 1.5 Mtr length (0- 2000) rpm Make : KOEL / VDO |
220 | Supply and replace Brass, Battery terminals |
221 | Supply and top up of distilled water |
222 | Material and labour for repair/servicing of 2 Ton crane after dismantling the crab and gear box and repair gear box by replacement of worn-out/unserviceable gears and turning the shaft and refixing the same with new gasket complete including commissioning all as directed |
223 | Material and labour for repair/servicing of 2 Ton crane after dismantling and rewinding the unserviceable hydraulic cylinder coil and refixing the same complete including commissioning all as directed |
224 | Supply and filling hydraulic oil for topping up of hydraulic cylinders 6 Nos complete for 2 ton crane all as directed |
225 | Supply and filling gear box oil complete for 2 ton crane complete all as directed |
226 | Material and labour for servicing the LT system of crane installed by replacement of unserviceable LT insulator complete all as directed |
227 | Periodical examination, carrying out normal and routine maintenance including cleaning of all parts and carry out corrective maintenance for trouble free working, attending to complaints on call, repair and replacement ofspares2 Ton capacity all as specified and as directed. |
228 | Material and labour for dismantling of crab system of 5 ton capacityand servicing the rail alignment including refixing the crab properly and and commissioning complete all as directed |
229 | Material and labour for dismantling the gear box of crane 5 ton capacity and repair/servicing the gear box including replacement of worn-out/unserviceable gear and replacement of gear oil and refixing the same including commissioning complete all as directed |
230 | Material and labour for servicing of track/rail of the crane on both sides by welding/grinding and making proper alignment for smooth functioning of crane including balancing the shaft and commissioning complete all as directed |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail