}

Tender For Tank Farm Management System (Tfms) And Tang Gauging, numaligarh-Assam

Numaligarh Refinery Limited has published Tender For Tank Farm Management System (Tfms) And Tang Gauging. Submission Date for this Tender is 17-02-2023. LED Light Tenders in numaligarh Assam. Bidders can get complete Tender details and download the document.




Tender Notice

34642194
Corrigendum : Tender For Tank Farm Management System (Tfms) And Tang Gauging
Open Tender
Indian
Assam
numaligarh
17-02-2023

Tender Details

Tender For Tank Farm Management System ( Tfms ) And Tang Gauging Tank Farm Management System ( Tfms ) And Tang Gauging Instruments For Numaligarh Refinery Expansion Project , Tank Gauging Instruments As Per Tp-1Zzza-Ic-Itp-0032 For Radar Level Instruments Including Packing & Forwarding, Spare Parts And Consumables For Installation, Pre-Commissioning, And Start-Up, Documentation, Inspection And Testing, Special Tools , Non Contact Radar Level Transmitter For Tfms Including Inspection For Crude Storage Tanks -Sil 2 Certified Instrument With An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Hcgo Tanke Tanks -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Dht Feed Tanks -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Nht Feed Tanks -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Light Slop Tank -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Heavy Slop Tank -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Dcu Feed Tank -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Rptu Feed Tank -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Srvgo Tank -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Pfcc Tank -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Gds Feed Tank -Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. Along With Tank Side Indicator ( With Mounting Accessories ) , Multipoint Temperature, Field Interface Unit ( As Applicable Including Mounting Accessories ) , Non Contact Radar Level Transmitter For Tfms Including Inspection For Heavy Slop Tank-Sil 2 Certifiedwith An Accuracy Of + / -1Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , Field Interface Unit ( As Applicable Including Mounting Accessories ) For Interfacing To Tfms , Non Contact Radar Level Transmitter For Tfms Including Inspection For Dcu Feed Tank-Sil 2 Certified With An Accuracy Of + / -1Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , Field Interface Unit ( As Applicable Including Mounting Accessories ) For Interfacing To Tfms , Non Contact Radar Level Transmitter For Tfms Including Inspection For Rptu Feed Tank-Sil 2 Certifiedwith An Accuracy Of + / -1Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , Field Interface Unit ( As Applicable Including Mounting Accessories ) For Interfacing To Tfms , Non-Contact Radar Level Transmitter Including Inspection For Crude Storage Tanks - Sil 2 Certifiedwith An Accuracy Of + / -1Mm Instrument With Sil2 Relay. , Non-Contact Radar Level Transmitter Including Inspection For Dht Feed Tanks - Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. , Non-Contact Radar Level Transmitter Including Inspection For Nht Feed Tanks - Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. , Non-Contact Radar Level Transmitter Including Inspection For Light Slop Tanks - Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. , Non-Contact Radar Level Transmitter Including Inspection For Heavy Slop Tanks - Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. , Non-Contact Radar Level Transmitter Including Inspection For Gds Feed Tanks - Sil 2 Certified Instrumentwith An Accuracy Of + / -1Mm With Sil2 Relay. , Non-Contact Radar Level Transmitter Including Inspection For Rw Intake Wellwith An Accuracy Of + / -3 Mm , Non-Contact Radar Level Transmitter Including Inspection For Closed Caustic Blowdown Drum -Along With Tank Side Indicator ( With Mounting Accessories ) With An Accuracy Of + / -3 Mm , Non-Contact Radar Level Transmitter Including Inspection For Closed Caustic Blowdown Drumwith An Accuracy Of + / -3 Mm , Non-Contact Radar Level Transmitter Including Inspection For Rw Filtration Sumpwith An Accuracy Of + / -3 Mm , Non-Contact Radar Level Transmitter Including Inspection For Rw Reservoirwith An Accuracy Of + / -3 Mm , Non-Contact Radar Level Transmitter Including Inspection For Dm Water Tankwith An Accuracy Of + / -3 Mm , Non-Contact Radar Level Transmitter Including Inspection For Dm Water Tank Along With Tank Side Indicator ( 1U59-Li-463301 ) ( With Mounting Accessories ) , With An Accuracy Of + / -4 Mm , Non-Contact Radar Level Transmitter Including Inspection For Fire Fighting Facility Sil2 Certifiedwith An Accuracy Of + / -3 Mm , Tank Gauging Instruments Including Inspection As Per Tp-1Zzza-Ic-Itp-0032 For Servo Level Instruments Ncluding Packing & Forwarding, Spare Parts And Consumables For Installation, Pre-Commissioning, And Start-Up, Documentation, Inspection And Testing, Special Tools , Servo Type Level Transmitter For Tfms Including Inspection For Crude Storage Tanks-Sil 2 Certifiedwith An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Servo Type Level Transmitter For Tfms Including Inspection For Hcgo Tank-Sil 2 Certified With An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Servo Type Level Transmitter For Tfms Including Inspection For Dht Feed Tank-Sil 2 Certified With An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Servo Type Level Transmitter For Tfms Including Inspection For Nht Feed Tanks-Sil 2 Certified With An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Servo Type Level Transmitter For Tfms Including Inspection For Light Slop Tank-Sil 2 Certified With An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Servo Type Level Transmitter For Tfms Including Inspection For Srvgo Tank-Sil 2 Certified With An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Servo Type Level Transmitter For Tfms Including Inspection For Pfcc Tank-Sil 2 Certified With An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Servo Type Level Transmitter For Tfms Including Inspection For Gds Feed Tank-Sil 2 Certified With An Accuracy Of + / -1 Mm. Along With Tank Side Indicator ( With Mounting Accessories ) , , Tfms System Including Fat, Ifat As Per Tp-1Zzza-Ic-Itp-0032 , Remote Communication Interface Unit ( At Srr ) ( Redundant Set ) With Necessary Io Cards Including Fat, Ifat -Minimum 2 Redundant Interface Units Meeting Mr , Wired Tfms Cabinet Including Fat, Ifat -System & Marshalling For Srr-9 And Srr-10. Shall House Items Such As But Not Limited To Fully Wired System And Marshalling Cabinet ( As Required ) Including Necessary Power Supply Units, Mcbs, Isolators Barriers, Relays, Tbs, Fan, Led Light, Fan Failure Relay, Other Cabinet Diagnostic Alarms Etc., Redundant Remote Communication Interface Unit, Io Cards ( As Required ) , Redundant Network Switches With Fo Uplink, Redundant Power Modules ( As Required ) , System Cables And All Maintenance Tools And Tackles. , Tfms Laptop -Intel Core I9 Or Higher Multi Core / Multi Processors, 2.5 Ghz Or Above, Wireless Mouse & Keyboard Detailed Configuration Shall Be As Per Tp-1Zzza-Ic-Ins-0021 , Tfms Engineering Workstation- High End Server Grade Machine Along With Tfms Software, Tfms Cds And Licensing, Application Packages As Necessary, Data Acquisition Packages As Required, Hmi Software And Any Other Software That May Be Required For Achieving The Functionality Mentioned In This Tender , 24” Widescreen ( Led ) , Engineering Keyboard, Mouse Or Track Ball Detailed Configuration Shall Be As Per Tp-1Zzza-Ic-Ins-0021 , Tfms Operator Workstation Workstation Grade, 24” Widescreen Led ( Anti-Glare Type Screen To Be Provided ) With Touch Facility Of The Bottom Monitor In Case Of 2 Tier Consoles, Wireless Mouse And Keyboard ( Operator & Oep Keyboard As Applicable ) Detailed Configuration Shall Be As Per Tp-1Zzza-Ic-Ins-0021 , Network Cabinet ( Fully Wired ) At Mcr. It Shall Include Fully Wired Network Cabinet To House All The Networking Components, Media Convertors, Redundant Firewall, Liu, Redundant Network Switch, Power Supplies ( As Required ) , , Ethernet Cable Bidder Shall Provide The Complete Length Of Ethernet Cables Required To Connect The Tfms Network Described In The Tender And Tfms Architecture. This Shall Include But Not Limited To The Network Between Tfms System To The Engineering Workstation / Operator Workstation, Network Switches To Respective Media Convertors, Network Switches To Firewall, Opc Communication, Remote Interface Unit To Network Switches Etc , Fo Patch Cord Between 1 ) Network Switch / Media Convertor To Liu ( At Mcr ) 2 ) Network Switch / Media Convertor To Liu ( At Srr-9 ) 3 ) Network Switch / Media Convertor To Liu ( At Srr-10 ) , Media Convertors Items Shall Be Placed / Installed At 1 ) Mcr 2 ) Srr-9 3 ) Srr-10 4 ) Between New Tfms System And Existing Tfms System ( If Any ) , Firewall Redundant Configuration , Opc Redundancy Broker , Opc Tunneller , A3 Colour Laser Printer Along With Accessories -Placed In Mcr , Ethernet Switch ( 24 Port ) Items Shall Be Placed / Installed At 1 ) Mcr 2 ) Srr-9 3 ) Srr-10 , Ethernet Switch ( 08 Port ) Items Shall Be Placed / Installed At 1 ) Mcr 2 ) Srr-9 3 ) Srr-10 , Antivirus Antivirus For All Engineering Stations And Operator Stations That Are Part Of This Requisition , Supply Of Mandatory Spares As Per Tp-1Zzza-Pq-Prc-0005 And Tp-1Zzza-Ic-Ins-0021 Including Spares For The Servers, Workstations, Networking Components, Tfms Components, Tank Gauging Instruments Etc. , Site Services And Training Support , Service Support During Warranty Period-Periodic Visits ( 2 Visits ( Mandatory ) ) Of The Expert Of Oem / Oem’S Representative Shall Be Considered For Preventive / Periodic Maintenance / Healthiness Checking / Troubleshooting Etc. During Warranty Period , Service Support During Unit Start-Up / Unit Commissioning Activity And Sat During Unit Start Up / Commissioning And Sat, If Sufficient Front Is Not Available At Site, Vendor May Be Required To Mobilise As Well As Demobilise Its Resources ( Manpower ) Multiple Times ( Max. 5 Times ) As Per Instruction Of Eic. However, Prior Intimation With Sufficient Time Will Be Given To Vendor For Every Mobilization / Demobilisation Based On Site Readiness. Bidder To Note This Requirement And Shall Comply Without Any Additional Financial Implication To Nrl As Per Site Requirements. , Maintenance And Calibration Services During Defect Liability Period -Periodic Visits ( 2 Visits Of The Expert Of Oem / Oem’S Representative For Preventive / Periodic Maintenance / Healthiness Checking / Troubleshooting Etc. ) . , Site Services For Sat , Site Assistance During Plant Commissioning And Start-Up -Tfms And Tank Gauging Instruments , Training Services For Owner Personnel For All Items ( Tfms And Tank Gauging Instruments, Bought Out Item As Per Mr ) At Oem Works , Training Services For Owner Personnel For All Items ( Tfms And Tank Gauging Instruments, Bought Out Item As Per Mr ) At Site , Total In Figures

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 21-Nov-2022 CORRIGENDUM_01 Date 01-12-2022
2 25-Nov-2022 ADDENDUM_01_COMMERCIAL Terms and Conditions 01-12-2022
3 29-Nov-2022 CORRIGENDUM_02 Date 12-12-2022
4 30-Nov-2022 TQ_RESPONSE_01 Other 12-12-2022
5 08-Dec-2022 ADDENDUM_02_TECHNICAL Terms and Conditions 12-12-2022
6 12-Dec-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 19-12-2022
7 15-Dec-2022 ADDENDUM_03_COMMERCIAL Other 19-12-2022
8 19-Dec-2022 CORRIGENDUM_04 Date 29-12-2022
9 28-Dec-2022 CQ_RESPONSE_01 Other 29-12-2022
10 28-Dec-2022 TQ_RESPONSE_02 Other 29-12-2022
11 30-Dec-2022 CORRIGENDUM_05 Date 10-01-2023
12 11-Jan-2023 CORRIGENDUM_06 Date 17-01-2023
13 17-Jan-2023 ADDENDUM_04_TECHNICAL Other 25-01-2023
14 17-Jan-2023 CORRIGENDUM_07 Date 25-01-2023
15 25-Jan-2023 CORRIGENDUM_08 Date 09-02-2023
16 01-Feb-2023 ADDENDUM 5 TECHNICAL Other 09-02-2023
17 10-Feb-2023 TQ_RESPONSE_03 Other 17-02-2023
18 10-Feb-2023 CORRIGENDUM_09 Date 17-02-2023

Key Value

Document Fees
Refer document
EMD
INR 571810.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: SUPPLY OF TANK FARM MANAGEMENT SYSTEM (TFMS) ANDTANK GAUGING INSTRUMENTS
Sl. No. Item Description
1Tank Gauging instruments as per TP-1ZZZA-IC-ITP-0032 for Radar Level instruments including Packing & Forwarding,Spare Parts and Consumables for Installation, Pre-commissioning, and Start-up, Documentation,Inspection and Testing, Special tools
2Non Contact Radar Level Transmitter For TFMS including Inspection for Crude storage tanks -SIL 2 Certified instrument with an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
3Non Contact Radar Level Transmitter For TFMS including Inspection for HCGO Tanke tanks -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
4Non Contact Radar Level Transmitter For TFMS including Inspection for DHT Feed tanks -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
5Non Contact Radar Level Transmitter For TFMS including Inspection for NHT Feed tanks -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
6Non Contact Radar Level Transmitter For TFMS including Inspection for Light Slop Tank -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
7Non Contact Radar Level Transmitter For TFMS including Inspection for Heavy Slop tank -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
8Non Contact Radar Level Transmitter For TFMS including Inspection for DCU Feed Tank -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
9Non Contact Radar Level Transmitter For TFMS including Inspection for RPTU Feed Tank -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
10Non Contact Radar Level Transmitter For TFMS including Inspection for SRVGO Tank -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
11Non Contact Radar Level Transmitter For TFMS including Inspection for PFCC Tank -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
12Non Contact Radar Level Transmitter For TFMS including Inspection for GDS Feed Tank -SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay. Along with Tank Side indicator (with mounting accessories), Multipoint temperature, Field interface unit(As applicable including mounting accessories)
13Non Contact Radar Level Transmitter For TFMS including Inspection for Heavy Slop Tank-SIL 2 Certifiedwith an accuracy of +/-1mm. Along with Tank Side indicator (with mounting accessories), Field interface unit(As applicable including mounting accessories) for interfacing to TFMS
14Non Contact Radar Level Transmitter For TFMS including Inspection for DCU Feed tank-SIL 2 Certified with an accuracy of +/-1mm. Along with Tank Side indicator (with mounting accessories), Field interface unit(As applicable including mounting accessories) for interfacing to TFMS
15Non Contact Radar Level Transmitter For TFMS including Inspection for RPTU Feed Tank-SIL 2 Certifiedwith an accuracy of +/-1mm. Along with Tank Side indicator (with mounting accessories), Field interface unit(As applicable including mounting accessories) for interfacing to TFMS
16Non-Contact Radar Level Transmitter including Inspection for Crude Storage tanks - SIL 2 Certifiedwith an accuracy of +/-1mm instrument with SIL2 relay.
17Non-Contact Radar Level Transmitter including Inspection for DHT Feed tanks - SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay.
18Non-Contact Radar Level Transmitter including Inspection for NHT Feed tanks - SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay.
19Non-Contact Radar Level Transmitter including Inspection for Light Slop tanks - SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay.
20Non-Contact Radar Level Transmitter including Inspection for Heavy Slop tanks - SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay.
21Non-Contact Radar Level Transmitter including Inspection for GDS Feed tanks - SIL 2 Certified instrumentwith an accuracy of +/-1mm with SIL2 relay.
22Non-Contact Radar Level Transmitter including Inspection for RW Intake wellwith an accuracy of +/-3 mm
23Non-Contact Radar Level Transmitter including Inspection for Closed Caustic Blowdown Drum -Along with Tank side indicator(with mounting accessories) with an accuracy of +/-3 mm
24Non-Contact Radar Level Transmitter including Inspection for Closed Caustic Blowdown Drumwith an accuracy of +/-3 mm
25Non-Contact Radar Level Transmitter including Inspection for RW Filtration Sumpwith an accuracy of +/-3 mm
26Non-Contact Radar Level Transmitter including Inspection for RW Reservoirwith an accuracy of +/-3 mm
27Non-Contact Radar Level Transmitter including Inspection for DM water Tankwith an accuracy of +/-3 mm
28Non-Contact Radar Level Transmitter including Inspection for DM water Tank Along with Tank Side indicator(1U59-LI-463301) (with mounting accessories),with an accuracy of +/-4 mm
29Non-Contact Radar Level Transmitter including Inspection for Fire Fighting Facility SIL2 Certifiedwith an accuracy of +/-3 mm
30Tank Gauging instruments including Inspection as per TP-1ZZZA-IC-ITP-0032 for Servo Level instruments ncluding Packing & Forwarding,Spare Parts and Consumables for Installation, Pre-commissioning, and Start-up, Documentation,Inspection and Testing, Special tools
31Servo Type Level Transmitter for TFMS including Inspection for Crude Storage Tanks-SIL 2 Certifiedwith an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
32Servo Type Level Transmitter for TFMS including Inspection for HCGO Tank-SIL 2 Certified with an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
33Servo Type Level Transmitter for TFMS including Inspection for DHT Feed Tank-SIL 2 Certified with an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
34Servo Type Level Transmitter for TFMS including Inspection for NHT Feed tanks-SIL 2 Certified with an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
35Servo Type Level Transmitter for TFMS including Inspection for Light Slop Tank-SIL 2 Certified with an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
36Servo Type Level Transmitter for TFMS including Inspection for SRVGO Tank-SIL 2 Certified with an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
37Servo Type Level Transmitter for TFMS including Inspection for PFCC Tank-SIL 2 Certified with an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
38Servo Type Level Transmitter for TFMS including Inspection for GDS Feed tank-SIL 2 Certified with an accuracy of +/-1 mm. Along with Tank Side indicator (with mounting accessories),
39TFMS system including FAT,IFAT as per TP-1ZZZA-IC-ITP-0032
40Remote Communication Interface Unit(At SRR) (Redundant Set) with necessary IO cards including FAT,IFAT -Minimum 2 redundant Interface units meeting MR
41Wired TFMS cabinet including FAT,IFAT -System & Marshalling for SRR-9 and SRR-10. Shall house items such as but not limited to Fully wired System and Marshalling cabinet (As required) including necessary Power supply units, MCBs, isolators barriers, relays, TBs, Fan, LED light, Fan Failure relay, other cabinet diagnostic alarms etc., Redundant Remote Communication Interface Unit, IO cards(as required), redundant network switches with FO uplink, Redundant Power modules(As required), system cables and all maintenance tools and tackles.
42TFMS laptop -Intel Core i9 or higher Multi core/ Multi processors, 2.5 GHz or above, Wireless Mouse & Keyboard Detailed configuration shall be as per TP-1ZZZA-IC-INS-0021
43TFMS Engineering Workstation- High End Server Grade Machine along with TFMS software, TFMS CDs and licensing, application packages as necessary, data acquisition packages as required, HMI software and any other software that may be required for achieving the functionality mentioned in this tender , 24” Widescreen (LED), Engineering Keyboard, Mouse or Track ball Detailed configuration shall be as per TP-1ZZZA-IC-INS-0021
44TFMS Operator Workstation Workstation grade, 24” Widescreen LED (Anti-Glare type screen to be provided) with touch facility of the bottom monitor in case of 2 tier consoles, wireless mouse and Keyboard (operator & OEP keyboard as applicable) Detailed configuration shall be as per TP-1ZZZA-IC-INS-0021
45Network Cabinet(Fully wired) At MCR. It shall include Fully wired network cabinet to house all the networking components, media convertors, redundant firewall, LIU, redundant network switch, power supplies (as required),
46Ethernet cable Bidder shall provide the complete length of ethernet cables required to connect the TFMS network described in the tender and TFMS architecture. This shall include but not limited to the network between TFMS system to the engineering workstation/operator workstation, network switches to respective media convertors, network switches to firewall, OPC communication, remote interface unit to network switches etc
47FO patch cord Between 1)network switch/Media convertor to LIU (at MCR) 2)network switch/Media convertor to LIU (at SRR-9) 3)network switch/Media convertor to LIU (at SRR-10)
48Media Convertors Items shall be placed/installed at 1) MCR 2) SRR-9 3) SRR-10 4) Between New TFMS system and existing TFMS system(If any)
49Firewall Redundant configuration
50OPC Redundancy broker
51OPC Tunneller
52A3 colour Laser Printer along with accessories -Placed in MCR
53Ethernet Switch (24 Port) Items shall be placed/installed at 1) MCR 2) SRR-9 3) SRR-10
54Ethernet Switch (08 Port) Items shall be placed/installed at 1) MCR 2) SRR-9 3) SRR-10
55Antivirus Antivirus for all Engineering stations and operator stations that are part of this requisition
56Supply of mandatory spares as per TP-1ZZZA-PQ-PRC-0005 and TP-1ZZZA-IC-INS-0021 including spares for the servers, workstations,networking components, TFMS components, tank gauging instruments etc.
57SITE SERVICES AND TRAINING SUPPORT
58Service Support during warranty period-Periodic visits (2 visits (Mandatory)) of the expert of OEM/ OEM’s representative shall be considered for preventive/periodic maintenance/ healthiness checking/ troubleshooting etc. during Warranty Period
59Service support during unit start-up/unit commissioning activity and SAT During Unit start up/ commissioning and SAT, if sufficient front is not available at site, vendor may be required to mobilise as well as demobilise its resources (Manpower) multiple times (max. 5 times) as per instruction of EIC. However, Prior intimation with sufficient time will be given to vendor for every mobilization /demobilisation based on site readiness. Bidder to note this requirement and shall comply without any additional financial implication to NRL as per site requirements.
60Maintenance and calibration services during Defect Liability period -Periodic visits (2 visits of the expert of OEM/ OEM’s representative for preventive/ periodic maintenance/ healthiness checking/ troubleshooting etc.).
61Site Services for SAT
62Site Assistance during plant commissioning and start-up -TFMS and Tank Gauging instruments
63Training Services for owner personnel for all items (TFMS and Tank gauging instruments, bought out item as per MR) at OEM works
64Training Services for owner personnel for all items (TFMS and Tank gauging instruments, bought out item as per MR) at Site
65Total in Figures
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail