Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 0 days TDR #34621088

Tender For Annual Maintenance Contract For Instrumentation Maintenance At Mining And Msp.

Issued by Boards / Undertakings / PSU · matikhalo, Odisha
Tender Value
65 Lakhs
Estimated cost
Bid Submission
23 Nov 2022
0 days left
EMD
65009
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
matikhalo → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Annual Maintenance Contract For Instrumentation Maintenance At Mining And Msp.

BOQ

Sl. No. Item Description
1Copper Cable up to 2.5 Sq. mm X 4 Core (Flexible)
2Copper Cable 2.5 sq.mm X above 4 core and up to 10 Core or 5 Pair (Flexible)
3Copper Cable up to 2.5 Sq. mm X 4 Core (Armoured)
4Copper Cable 2.5 sq.mm X above 4 core and up to 10 Core or 5 Pair (Armoured)
5Copper Cable up to 1.5 Sq. mm X 11 core-40 Core: Armoured
6Cable: Communication / Compensating
7Cable Glanding: Poly Carbonate/Metal/Equivalent
8Earthing Cable: Wire/ strip
9Installation/Dismantling/Replacement of Magnetic Flow meter up to 200 mm NB
10Installation/ Dismantling/ Dismantling of Commissioning of Magnetic Flow meter: above 200mm NB - 400 mm NB
11Replacement of Earthing Plate of Magnetic Flow Meter
12Replacement of Gasket for Magnetic Flow Meter
13Functional Testing & Troubleshooting of Magnetic Flow meter
14Preventive Maintenance of Magnetic Flow meter with transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20 mA...etc as per Checklist. PM Checklist report shall be submitted on each occasion.
15Installation / Dismantling / Replacement of Density Gauge and Transmitter
16Installation / Dismantling / Replacement of Computing Unit / Detector and its accessories
17Internal calibration & Report generation of Density Meter
18Replacement of Rubber Gasket/ SS Saddle of Density Meter
19Functional Testing & Troubleshooting of Density meter
20Preventive Maintenance of Density Meter: Blowering and cleaning, dedusting/Covering and terminal tightness …etc as per Checklist. PM Checklist report shall be submitted on each occasion.
21Installation / Dismantling / Replacement of RTD/ Thermocouple/ Bi-metallic sensor Element
22Installation / Dismantling / Replacement of Temperature Indicator cum Controller
23Internal Calibration & Report generation of Temperature Sensor / Temperature Controller
24Functional Testing & Troubleshooting of Temperature Measuring System- RTD / Thermocouple / Indicator / controller
25Preventive Maintenance of Temperature Controller & Sensor Element: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per checklist. PM Checklist report shall be submitted on each occasion.
26Installation / Dismantling of Pressure Transmitter
27Installation / Dismantling of Raiser tube replacement
28Installation / Dismantling of Isolation Valve
29Internal calibration & report generation of Pressure Transmitter
30Functional Testing & Troubleshooting of Pressure Transmitter
31Preventive Maintenance of Pressure Transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist.PM Checklist shall be submitted on each occasion.
32Installation / Dismantling / Replacement of Pinch Control valve
33Replacement of Shaft & Brush including Drilling &grinding of shaft
34Replacement / Adjustment of Limit switch of Pinch Control Valve
35Replacement of Capacitor of Pinch Control Valve
36Replacement of Rubber Sleeve of Pinch Control Valve
37Replacement & Realignment of gear system of Pinch Control Valve
38Replacement of Motor of Pinch Control Valve
39Valve Stroke Adjustment of Pinch Control Valve
40Overhauling of Pinch Control Valve
41Condition Monitoring of Pinch Control Valve
42Functional Testing & Troubleshooting of Pinch Type Control Valve
43Preventive Maintenance of Pinch Control Valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness…etc as pr PM Checklist.PM Checklist Report shall be submitted on each occasion.
44Installation/ Dismantling / Replacement of Butterfly Valve
45Adjustment &realignment of the gear system of Butterfly Valve
46Repairing &realignment of variable register port of Butterfly Valve
47Adjustment of Valve Stroke of Butterfly Valve
48Overhauling of Butterfly Valve
49Functional Testing & Troubleshooting of Butterfly Valve
50Preventive Maintenance of Butterfly valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
51Installation / Dismantling / Replacement of water flow meter
52Repair & Overhauling of Water flow meter
53Internal Calibration of Water meter and Report Generation
54Functional Testing & Troubleshooting of water flow meter
55Preventive Maintenance of Water Flow Meter:cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
56Installation / Dismantling / Replacement of Air flow meter
57Repair & Overhauling of Air flow meter
58Internal Calibration and Report Generation of Air flow meter
59Functional Testing & Troubleshooting of Air flow meter
60Preventive Maintenance of Air Flow Meter:cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
61Installation / Dismantling / Replacement of Oil flow meter
62Repair & Overhauling of Oil flow meter
63Internal Calibration of Oil flow meter
64Functional Testing & Troubleshooting of Oil flow meter
65Preventive Maintenance of Oil Flow Meter:cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
66Installation / Dismantling / Replacement of pH meter cum controller
67Installation / Dismantling / Replacement of pH Electrode
68Calibration of pH meter / Conductivity Meter with Buffer Solution & Report Generation
69Functional Testing and Troubleshooting of pH meter/Conductivity meter
70Preventive Maintenance of pH Meter / Conductivity Meter: Electrode cleaning, Meter- Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Analytical Instruments shall be submitted on each occasion.
71Repairing of Panel meter/ PID controller/ transmitter/ Totalizer
72Replacement of Electronic Component-register/capacitor/ IC…etc
73Replacement of Low-capacity Transformer/motor
74Installation /Dismantling /Replacement of Electronic Button or Switch
75Replacement of Battery / Fuse / Buzzer
76Functional Testing and Troubleshooting of Electronic System
77Installation / Dismantling / Replacement of Digital Panel meter / Timer / Counter
78Programming of Digital Panel Meter/Timer/ Counter as per process requirement
79Functional Testing and Troubleshooting of Digital Panel meter /Timer /Counter
80Preventive Maintenance of Digital Panel Meter or Timer: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist.PM Checklist of shall be submitted on each occasion.
81Installation/Dismantling / Replacement of Digital Totalizer cum Indicator
82Programming of Digital Totalizer cum Indicator as per function Requirement
83Functional Testing and Troubleshooting of Digital Totalizer
84Preventive Maintenance of Digital Totalizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
85Installation / Dismantling / Replacement ofDigital Recorder
86Programming of Digital Recorder as per process requirement
87Functional Testing and Troubleshooting of Digital Recorder
88Preventive Maintenance of Digital Recorder: Blowering and cleaning, dedusting/Covering and terminal tightness. Etc as per Pm checklist. PM Checklist r shall be submitted on each occasion.
89Installation / Dismantling / Replacement of PID Controller
90Programming & Parameter Adjustment of PID Controller as per process requirement
91Functional Testing and Troubleshooting of PID Controller
92Preventive Maintenance of PID Controllers: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist.PM Checklist shall be submitted on each occasion.
93Replacement Solenoid coil, Relay, Joystick, Timer, Variable resistive port, Push Button of Hydraulic Control System
94Replacement of Power supply module of Hydraulic Control System
95Functional Testing & Troubleshooting of DWUP Instrument system
96Preventive Maintenance of DWUP Hydraulic System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.
97Installation / Dismantling /Replacement of Dosing Pump
98Installation / Dismantling of Valve Actuator
99Replacement, Repairing & Realignment of gear system / Limit Switch
100Replacement of Potentio meter port
101Replacement of Float Ball
102Installation / Dismantling of Servo controller
103Programming and Fine tuning of Servo controller
104Overhauling of Electric Actuator System
105Condition Monitoring of Flotation cell
106Functional Testing and troubleshooting Sillimanite Floatation Cell
107Preventive Maintenance of Sillimanite Flotation Cell: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.
108Installation/ Dismantling / Replacement of Globe Discharge Valve
109Condition Monitoring of Column Flotation System
110Functional Testing and troubleshooting Column Flotation System
111Preventive Maintenance of Column Flotation System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist ofshall be submitted on each occasion.
112Installation / Dismantling / Replacement of FFD/Park Plug
113Installation / Dismantling / Replacement of Modulation Motors of Oil/Air Control system/ Inlet PRV/ Outlet PRV
114Replacement/ Dismantling of Burner Gun/ Electrode/ Nozzle
115Replacement/Dismantling of Flame Switch / Sequence Controller/ Modulating Controller
116Replacement / Dismantling of solenoid Valve/ Solenoid Coil
117Replacement / Dismantling of Ignition Transformer
118Cleaning of air impulse line from field to Transmitter
119Repair of Oil Heater control System
120Repair of Air Purging System for Bag Filter
121Repair/ Replacement/ Dismantling of Gas Train
122Repair/ Replacement/ Dismantling of Oil Train
123Functional Testing and Troubleshooting of FBD
124Condition Monitoring of FBD system of MUS / GEM / Zircon
125Preventive Maintenance of FBD System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
126Replacement/Repair / Dismantling of Oil Control valve system
127Replacement/ Repair / Dismantling of Combustion Air Control valve
128Replacement/Repair / Dismantling of ID FAN Control Valve Actuator
129Repair of Oil Heater control System
130Replacement/ Repair / Dismantling of Ratio control System
131Checking of Field Instrument signal to DAS Panel for Control room operation and monitoring System
132Condition Monitoring of Dryer System
133Functional Testing and Troubleshooting of Driyer
134Preventive Maintenance of DRIYER system: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
135Installation/Dismantling / Replacement of Auto sampler complete system
136Replacement of Solenoid coil, Timer, Limit switch, Motor, Proximity sensor
137Replacement of Pneumatic Cylinder, 3/2 Solenoid Valve
138Replacement of Valve body, rubber sleeve, shaft, Gear system
139Realignment of Gear System
140Condition Monitoring of Auto Sampling System
141Function Testing and troubleshooting of Auto sampling system
142Preventive Maintenance of Auto Sampling System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per Pm Checklist. PM Checklist shall be submitted on each occasion.
143Installation /Dismantling / Replacement PLC CPU
144Replacement/ Dismantling of SMPS, DI / DO/ AI / AO/ Card Rack
145Replacement / Dismantling of Relay Unit / Relay Card / Card Battery
146Replacement / Dismantling HMI Display
147Re-starting of SCADA application S/W/ PLC System
148Conditioning Monitoring of PLC and SCADA
149Replacement / Dismantling of PLC Based LED Monitor
150Checking of Earthing and Supply Voltage PLC Panel
151Functional Testing & Troubleshooting PLC System
152Preventive Maintenance of PLC & SCADA SYSTEM: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion.
153Installation/Dismantling/Replacement of Computer System / Server
154Installation/Dismantling/Replacement of Printer System
155Cleaning of Computer Unit / Printer Unit
156Formating and Drivers Installation of computer system
157Replacement/ Dismantling of Mother Board / Fan / SMPS / RAM / Hard Disk / Mouse / Key Board / Monitor
158Installation / Dismantling / Replacement of Network Rack 6U / 9U / 19 U
159Installation / Dismantling / Replacement of Network Switch
160Crimping of Network cable like RJ45 / VGA / DVI / HDMI ..etc
161Functional Testing and Troubleshooting of Server /Computer/ Printer/ Network System
162Preventive Maintenance of Computer and Network System: Blowering and cleaning, dedusting and terminal tightness…etc as per PM checklist. PM Checklist shall besubmitted on each occasion.
163Loop checking AI /AO / DI / DO signal inside Panel System
164Loop checking Copper Signal for Field Instruments to Panel
165Loop checking Cooper Power Cable
166Loop Checking of Communication cable
167Installation / Dismantling/ Replacement of UPS System / stabilizer
168Installation / Dismantling / Replacement of Battery
169Conditioning Monitoring of system includes Recording of Battery Voltage, UPS input & output Voltage and Backup performance
170Functional Testing and Troubleshooting of UPS System /stabilizer
171Preventive Maintenance of UPS system / stabilizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion.
172Installation/Dismantling / Replacement of Junction box - Polycarbonate / PVC / SS/ MS / FRP
173Fixing/ Removal of DIN Rail with screw or nut bolts
174Fixing / Removal of Terminal Block
175Fixing / Removal of Terminal End Plate
176Fixing / Removal of Terminal Block stopper
177Fixing / Removal of Electronic Relays
178Fixing / Removal of required Casing Capping /Duct
179New Wiring for Junction Box
180Installation / Dismantling /Replacement ofPressure/ Vaccum / Bi-metallic gauges
181Repair of Pressure /Vaccum / Bi-metallic gauges
182Functional Testing and Troubleshooting of Pressure / Vaccum / Bi-metallic gauges
183Preventive Maintenance of Gauges:cleaning and dedusting/ Covering …etc as per PM checklist. PM Checklist shall be submitted on each occasion.
184Installation/Dismantling / Replacement oflevel transmitter
185Programming of Level Transmitter as per process requirement
186Internal Calibration and Report Generation of Level Transmitter
187Functional Testing & Troubleshooting of Level Transmitter/Switch
188Preventive Maintenance of level transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check 4-20mA supply ..etc as per PM checklist.PM Checklist shall be submitted on each occasion.
189Installation / Dismantling / Replacement of Differential Pressure Switch
190Calibration and Report Generation for of Differential Pressure Switch
191Functional Testing and Troubleshooting of DP Switch
192Preventive Maintenance of Differential Pressure Switch: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.
193Weighbridge in Plant & Mining Area - AMC Support
194Weighing Scales/Machine - AMC Support
195Belt Weigher - AMC Support
196Mass Flow meter - AMC Support
197MUS FBD - AMC Support
198GEM FBD - AMC Support
199Electronic Display Board - AMC Support
200Flow Meter Calibration - AMC Support
201Master Instruments Calibration - AMC Support
202UPS System - AMC Support
203Auto Sampler System - AMC Support
204Bagging Machine - AMC Support
205Fire Alarm System - AMC Support
206PLC & SCADA System - AMC Support
207Installation /Dismantling / Replacement of Weighing Scale
208Replacement of Load Cell / Indicator / Communication Cord
209Internal Calibration and Report Generation of Weighing scale with minimum 50% of Capacity
210Conditioning Monitoring of Weighing Scale with Test Weight of Minimum 50 Kg
211Functional Testing of Weighing Scales
212Preventive Maintenance of Weighing Scale:Dusting, surface cleanning, Load cell cable tightness …etc as per Pm checklist. PM Checklist shall be submitted on each occasion.
213Checking of Earth plate, Load cell, Platform Nut & Bolt and its tightness. Corrective action for optimal Performance
214Greasing of Earth plate, Load cell, Platform Nut & Bolt
215Replacement of Load Cell
216Replacement of RFID / Camera / IR Sensor / NVR / Light Signal / PoE Switch
217Calibration cross Checking with Vehicle in all Weighbridge
218Conditioning Monitoring of Weighbridge
219Functional Testing and Troubleshooting
220Preventive Maintenance Weigh bridge- Dusting, surface cleaning of Digitiser, Computer, Printer, Terminal Tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
221Installation / Dismantling / Replacement of Belt Weigher
222Replacement / Dismantling load cell / Tachometer / Junction Box
223Replacement Belt Weigher Panel
224Repair of Belt Weigher Panel
225Internal calibration & Report Generation - Drop test
226Internal Calibration & Report Generation- Complete with Test Chain
227Conditioning Monitoring of Belt Weigher
228Functional Testing and Troubleshooting of Belt Weigher
229Preventive Maintenance of Belt Weigher: Desting, surface cleaning, Load cell cable tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
230Replacement / Dismantling of Load Cell/ Pneumatic Cylinder / Solenoid Valve
231Replacement / Dismantling of Clamp Belt Rubber (width- 2\"\")/ Foot Switch
232Replacement / Dismantling of PU Tubes
233Repair of Pneumatic Cylinder / Solenoid Valve
234Conditioning Monitoring of Auto bagging System
235Functional Testing and Troubleshooting of Auto Bagging System
236Preventive Maintenance of Bagging System: Desting, surface cleaning, Load cell cable tightness…etc as per PM Checklist. PM Checklistshall be submitted on each occasion.
237Replacement of Needle/ Any Parts
238Replacement/ realignment of Looper
239Replacement of V-Belt
240Overhauling of Stitching Machine
241Condition Monitoring of Stitching Machine
242Functional Testing and Trouble Shooting of Stitching Machine
243Preventive Maintenance of stitching: Blowering and cleaning, oiling, dedusting/Covering and terminal tightness. Etc as per PM Checklist .PM Checklist Shall be submitted on each occasion.
244Conditional Monitoring of Fire Alarm System - MSP / TS / STORE & WORKSHOP / ADMINISTRATIVE BUILDING / MRSS & LCSS
245Functional Testing of Fire Alarm Control Panel /Smoke/ Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module
246Replacement of Smoke/Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module
247Replacement of Fire Alarm Panel
248Installation/Dismantling / Replacement of Camera
249Replacement of PoE Switch/ Power Supply Module / Media Converter
250Replacement of Communication/Power Cord
251Replacement of CCTV Surveillance Monitor
252Replacement of NVR System
253Parameter Fixing of NVR system as per requirement
254Condition Monitoring of CCTV base Surveillance System- MSP / GEM / MUS / MINING POND / SMP / DWUP / SECURITY / ADMIN BUILDING / GUEST HOUSE
255Function Testing and Troubleshooting of CCTV based Surveillance System
256Preventive Maintenance of all camera: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist. PM Checklist shall be submitted on each occasion.
257Installation/Dismantling / Replacement of Air Regulator /Air Filter / Oil Lubricator
258Repair of Air Regulator / Air Filter / Oil Lubricator
259Loading and unloading Pressure Setting
260Oil Refilling for Compressor
261Conditioning Monitoring for Compressor System
262Replacement/ Dismantling of condensate drain valve system
263Repair of condensate drain valve system
264Function Testing and Troubleshooting of Compressor
265Preventive Maintenance of compressed air conditioning system: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist of Air condition of standalone system shall be submitted on each occasion.
266Installation/Dismantling / Replacement of Air Dryer
267Replacement/ Dismantling solenoid valve / Solenoid coil
268Replacement / repair of Air Drier Control Unit
269Function Testing and Troubleshooting of Air Drier System
270Preventive Maintenance of Air Drier: Blowering and cleaning, dedusting and covering, part checking…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.
271Brush Painting -Primer
272Brush Painting -Paint
273Surface Preparation- Chipping/sand Paper/ Buffing
274Replacement/Fixing / Removal of MCB / SPD / Contactor/ Timer / Relay / Bush Button / Emergency Button
275Replacement/ Fixing/ Removal of 5/6 Ams. 3/5 pin Socket(or) 3/5 pin Plug Top/Switch piano type
276Replacement/ Fixing / Removal of 15/16 Ams. 3/5 pin Socket (or) 3/5 pin Plug Top/Switch piano type
277Replacement / Fixing / removal of Light Fittings / Light / Fan
278Fixing / removal of Electrical PVC/ Wooden/ Metal Junction Box - 4\"\" X 4\"\"/4\"\" X 6\"\"/4\"\"X10\"\"/6\"x12\"
279Replacement/ fixing / removal of Transformer / Variac / SMPS
280Functional testing of Electrical system
281Laying & dressing of PVC Conduit pipe
282Laying & dressing PVC Casing and Capping on the wall
283Laying & dressing Flexible Conduit
284Removal of PVC conduit / Casing & Capping / Flexible Conduit
285Connection Fittings- Pipe/ casing capping
286Laying of GI / MS / SS Pipe
287Laying of HDPE Pipe
288Fixing of HDPE Fitting
289Dismantling and Disposal of old or unused Pipe / casing capping
290Dismantling and Disposal of old or HDPE Pipe
291Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size up to 1/2 \"\"
292Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size- above 1/2\"\" to 1 \"\"
293Junction Box Fixing Bracket up to 2 sq. ft.: Mild steel
294Junction Box Fixing Bracket above 2 sq. ft- 4 sq. ft.: Mild Steel
295MS Fabrication as per Drawing provided EIC
296MS Flange fabrication as per requirement with pipe up to 50 mm
297MS Flange Fabrication above 50mm - 100 mm
298SS/MS Cover for Field Instruments as per Drawing- max. sheet thickness 3 mm
299Laying of MS / GI Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm
300Laying of MS / GI Cable Tray Ladder Type- up to 200 X40X 6 mm
301Laying of MS/ Gi cable Tray Fittings
302Fixing of MS / GI Tray Support
303Laying of FRP Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm
304Laying of FRP Cable Tray Ladder Type- up to 200 X40X 6 mm
305Laying of FRP cable Tray Fittings
306Fixing of FRP Tray Support of MS material
307Removing of old cable from wall/cable tray/Cassing /open area and disposal to designated area as per direction EIC after weighment within area 100 mtr. Inside the plant premises.
308Collection of old metal scrap from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises.
309Collection of old electronic waste from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises.
310Preparation soft soil trench of size 30 cm X 30 cm X 30 Cm and refilling after cabling/piping. Etc work
311Preparation of Hard soil (RCC) by cutting of size 20 cm X 20 cm X 20 cm and reconditioning to originality by filling with plain concrete after laying of pipe or cable
312Replacement/ Dismantling /Installation of Control Panel of Booster Pump
313Repair of Booster Pump control system
314Functional testing and Troubleshooting of Booster Pump
315Installation/ Dismantling / replacement of Replacement of Spillage Alarm Panel System
316Replacement of Sensor switch
317Conditional Monitoring of Spillage Control System
318Functional testing and Troubleshooting of Spillage Alarm System
319Preventive Maintenance of Spillage Control System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklistshall be submitted on each occasion.
320The Work Which are not included in the above List
321Replacement / Dismantling / installation of Piezometer
322Internal Calibration
323Functional Testing & Troubleshooting
324Condition Monitoring of Piezometer System
325Preventive Maintenance of Piezometer System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklistshall be submitted on each occasion.
326Installation/ Replacement of IR Occupancy Sensor
327Installation /Replacement of Indicator light
328Repair/ Installation/ Dismantling of Parking LED Monitor
329Functional Testing & Troubleshooting of Smart Parking Facility
330Condition Monitoring of Smart Parking Facility
331Preventive Maintenance of Smart Parking Facility: Blowering and cleaning, dedusting…etc as per PM Checklist shall be submitted on each occasion.
332Installation/ Replacement of Boom
333Installation/ Replacement of Motor for Boom barrier
334Installation/ Replacement / Repair of Mother Board card/ IR Sensor
335Installation/ Replacement of RFID Scanner / Controller
336Functional Testing & Troubleshooting of Boom Barrier System
337Condition Monitoring of Boom Barrier System
338Preventive Maintenance of Boom barrier System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.
339Installation/ Replacement / Repair of RF-NIC card
340Installation/ Replacement / Repair of DCU-NIC card
341Functional Testing & Troubleshooting of Smart Metering System
342Condition Monitoring of Smart Metering System
343Preventive Maintenance of Smart Metering System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.
344Installation/ Replacement / Repair of Signal Light
345Installation/ Replacement / Repair of Traffic Camera
346Installation/ Replacement / Repair of Traffic Controller
347Functional Testing & Troubleshooting of Intelligent Traffic Management System
348Condition Monitoring of Intelligent Traffic Management System
349Preventive Maintenance of Intelligent Traffic Management System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.
350Engagement of one 5 Seated Bolero Camper or TATA Xenon with driver for 8 Hrs Operation from 9:00 AM to 5 PM. The Vehicle shall be of 2019 Model or subsequent.
351Kilometer run by the Vehicle :-Fuel Charge shall be reimbursed @ 1Litre for every 12 Kilometers run by the Vehicle

AI Tender Summary

OUR REF NO 34621088
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 65 Lakhs
LAST DATE 23-11-2022
Authority
Authority Name Indian Rare Earths Limited
Work Description Tender For Annual Maintenance Contract For Instrumentation Maintenance At Mining And Msp.
Basic Detail
Tender No 03-19086
Bidding Type Tender
Location
City matikhalo
State Odisha
Key Dates
Publish Date 02 Nov 2022
Submission Date 23 Nov 2022
Open Date 24 Nov 2022
Finance
Tender Value 65 Lakhs
Tender Fee Ref. Documents
EMD 65009
Exemption Not Available
Document List
e773cb9d-c102-460c-9c4b-fb1a38473546.html
BOQ_146610.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 02, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 23, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 24, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

e773cb9d-c102-460c-9c4b-fb1a38473546.html

xls

BOQ_146610.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders