Tender For Annual Maintenance Contract For Instrumentation Maintenance At Mining And Msp.
Tender Value
65 Lakhs
Estimated cost
Bid Submission
23 Nov 2022
0 days left
EMD
65009
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
matikhalo → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Annual Maintenance Contract For Instrumentation Maintenance At Mining And Msp.
BOQ
| Sl. No. | Item Description |
| 1 | Copper Cable up to 2.5 Sq. mm X 4 Core (Flexible) |
| 2 | Copper Cable 2.5 sq.mm X above 4 core and up to 10 Core or 5 Pair (Flexible) |
| 3 | Copper Cable up to 2.5 Sq. mm X 4 Core (Armoured) |
| 4 | Copper Cable 2.5 sq.mm X above 4 core and up to 10 Core or 5 Pair (Armoured) |
| 5 | Copper Cable up to 1.5 Sq. mm X 11 core-40 Core: Armoured |
| 6 | Cable: Communication / Compensating |
| 7 | Cable Glanding: Poly Carbonate/Metal/Equivalent |
| 8 | Earthing Cable: Wire/ strip |
| 9 | Installation/Dismantling/Replacement of Magnetic Flow meter up to 200 mm NB |
| 10 | Installation/ Dismantling/ Dismantling of Commissioning of Magnetic Flow meter: above 200mm NB - 400 mm NB |
| 11 | Replacement of Earthing Plate of Magnetic Flow Meter |
| 12 | Replacement of Gasket for Magnetic Flow Meter |
| 13 | Functional Testing & Troubleshooting of Magnetic Flow meter |
| 14 | Preventive Maintenance of Magnetic Flow meter with transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20 mA...etc as per Checklist. PM Checklist report shall be submitted on each occasion. |
| 15 | Installation / Dismantling / Replacement of Density Gauge and Transmitter |
| 16 | Installation / Dismantling / Replacement of Computing Unit / Detector and its accessories |
| 17 | Internal calibration & Report generation of Density Meter |
| 18 | Replacement of Rubber Gasket/ SS Saddle of Density Meter |
| 19 | Functional Testing & Troubleshooting of Density meter |
| 20 | Preventive Maintenance of Density Meter: Blowering and cleaning, dedusting/Covering and terminal tightness …etc as per Checklist. PM Checklist report shall be submitted on each occasion. |
| 21 | Installation / Dismantling / Replacement of RTD/ Thermocouple/ Bi-metallic sensor Element |
| 22 | Installation / Dismantling / Replacement of Temperature Indicator cum Controller |
| 23 | Internal Calibration & Report generation of Temperature Sensor / Temperature Controller |
| 24 | Functional Testing & Troubleshooting of Temperature Measuring System- RTD / Thermocouple / Indicator / controller |
| 25 | Preventive Maintenance of Temperature Controller & Sensor Element: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per checklist. PM Checklist report shall be submitted on each occasion. |
| 26 | Installation / Dismantling of Pressure Transmitter |
| 27 | Installation / Dismantling of Raiser tube replacement |
| 28 | Installation / Dismantling of Isolation Valve |
| 29 | Internal calibration & report generation of Pressure Transmitter |
| 30 | Functional Testing & Troubleshooting of Pressure Transmitter |
| 31 | Preventive Maintenance of Pressure Transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist.PM Checklist shall be submitted on each occasion. |
| 32 | Installation / Dismantling / Replacement of Pinch Control valve |
| 33 | Replacement of Shaft & Brush including Drilling &grinding of shaft |
| 34 | Replacement / Adjustment of Limit switch of Pinch Control Valve |
| 35 | Replacement of Capacitor of Pinch Control Valve |
| 36 | Replacement of Rubber Sleeve of Pinch Control Valve |
| 37 | Replacement & Realignment of gear system of Pinch Control Valve |
| 38 | Replacement of Motor of Pinch Control Valve |
| 39 | Valve Stroke Adjustment of Pinch Control Valve |
| 40 | Overhauling of Pinch Control Valve |
| 41 | Condition Monitoring of Pinch Control Valve |
| 42 | Functional Testing & Troubleshooting of Pinch Type Control Valve |
| 43 | Preventive Maintenance of Pinch Control Valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness…etc as pr PM Checklist.PM Checklist Report shall be submitted on each occasion. |
| 44 | Installation/ Dismantling / Replacement of Butterfly Valve |
| 45 | Adjustment &realignment of the gear system of Butterfly Valve |
| 46 | Repairing &realignment of variable register port of Butterfly Valve |
| 47 | Adjustment of Valve Stroke of Butterfly Valve |
| 48 | Overhauling of Butterfly Valve |
| 49 | Functional Testing & Troubleshooting of Butterfly Valve |
| 50 | Preventive Maintenance of Butterfly valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 51 | Installation / Dismantling / Replacement of water flow meter |
| 52 | Repair & Overhauling of Water flow meter |
| 53 | Internal Calibration of Water meter and Report Generation |
| 54 | Functional Testing & Troubleshooting of water flow meter |
| 55 | Preventive Maintenance of Water Flow Meter:cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 56 | Installation / Dismantling / Replacement of Air flow meter |
| 57 | Repair & Overhauling of Air flow meter |
| 58 | Internal Calibration and Report Generation of Air flow meter |
| 59 | Functional Testing & Troubleshooting of Air flow meter |
| 60 | Preventive Maintenance of Air Flow Meter:cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 61 | Installation / Dismantling / Replacement of Oil flow meter |
| 62 | Repair & Overhauling of Oil flow meter |
| 63 | Internal Calibration of Oil flow meter |
| 64 | Functional Testing & Troubleshooting of Oil flow meter |
| 65 | Preventive Maintenance of Oil Flow Meter:cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 66 | Installation / Dismantling / Replacement of pH meter cum controller |
| 67 | Installation / Dismantling / Replacement of pH Electrode |
| 68 | Calibration of pH meter / Conductivity Meter with Buffer Solution & Report Generation |
| 69 | Functional Testing and Troubleshooting of pH meter/Conductivity meter |
| 70 | Preventive Maintenance of pH Meter / Conductivity Meter: Electrode cleaning, Meter- Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Analytical Instruments shall be submitted on each occasion. |
| 71 | Repairing of Panel meter/ PID controller/ transmitter/ Totalizer |
| 72 | Replacement of Electronic Component-register/capacitor/ IC…etc |
| 73 | Replacement of Low-capacity Transformer/motor |
| 74 | Installation /Dismantling /Replacement of Electronic Button or Switch |
| 75 | Replacement of Battery / Fuse / Buzzer |
| 76 | Functional Testing and Troubleshooting of Electronic System |
| 77 | Installation / Dismantling / Replacement of Digital Panel meter / Timer / Counter |
| 78 | Programming of Digital Panel Meter/Timer/ Counter as per process requirement |
| 79 | Functional Testing and Troubleshooting of Digital Panel meter /Timer /Counter |
| 80 | Preventive Maintenance of Digital Panel Meter or Timer: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist.PM Checklist of shall be submitted on each occasion. |
| 81 | Installation/Dismantling / Replacement of Digital Totalizer cum Indicator |
| 82 | Programming of Digital Totalizer cum Indicator as per function Requirement |
| 83 | Functional Testing and Troubleshooting of Digital Totalizer |
| 84 | Preventive Maintenance of Digital Totalizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 85 | Installation / Dismantling / Replacement ofDigital Recorder |
| 86 | Programming of Digital Recorder as per process requirement |
| 87 | Functional Testing and Troubleshooting of Digital Recorder |
| 88 | Preventive Maintenance of Digital Recorder: Blowering and cleaning, dedusting/Covering and terminal tightness. Etc as per Pm checklist. PM Checklist r shall be submitted on each occasion. |
| 89 | Installation / Dismantling / Replacement of PID Controller |
| 90 | Programming & Parameter Adjustment of PID Controller as per process requirement |
| 91 | Functional Testing and Troubleshooting of PID Controller |
| 92 | Preventive Maintenance of PID Controllers: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist.PM Checklist shall be submitted on each occasion. |
| 93 | Replacement Solenoid coil, Relay, Joystick, Timer, Variable resistive port, Push Button of Hydraulic Control System |
| 94 | Replacement of Power supply module of Hydraulic Control System |
| 95 | Functional Testing & Troubleshooting of DWUP Instrument system |
| 96 | Preventive Maintenance of DWUP Hydraulic System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion. |
| 97 | Installation / Dismantling /Replacement of Dosing Pump |
| 98 | Installation / Dismantling of Valve Actuator |
| 99 | Replacement, Repairing & Realignment of gear system / Limit Switch |
| 100 | Replacement of Potentio meter port |
| 101 | Replacement of Float Ball |
| 102 | Installation / Dismantling of Servo controller |
| 103 | Programming and Fine tuning of Servo controller |
| 104 | Overhauling of Electric Actuator System |
| 105 | Condition Monitoring of Flotation cell |
| 106 | Functional Testing and troubleshooting Sillimanite Floatation Cell |
| 107 | Preventive Maintenance of Sillimanite Flotation Cell: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion. |
| 108 | Installation/ Dismantling / Replacement of Globe Discharge Valve |
| 109 | Condition Monitoring of Column Flotation System |
| 110 | Functional Testing and troubleshooting Column Flotation System |
| 111 | Preventive Maintenance of Column Flotation System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist ofshall be submitted on each occasion. |
| 112 | Installation / Dismantling / Replacement of FFD/Park Plug |
| 113 | Installation / Dismantling / Replacement of Modulation Motors of Oil/Air Control system/ Inlet PRV/ Outlet PRV |
| 114 | Replacement/ Dismantling of Burner Gun/ Electrode/ Nozzle |
| 115 | Replacement/Dismantling of Flame Switch / Sequence Controller/ Modulating Controller |
| 116 | Replacement / Dismantling of solenoid Valve/ Solenoid Coil |
| 117 | Replacement / Dismantling of Ignition Transformer |
| 118 | Cleaning of air impulse line from field to Transmitter |
| 119 | Repair of Oil Heater control System |
| 120 | Repair of Air Purging System for Bag Filter |
| 121 | Repair/ Replacement/ Dismantling of Gas Train |
| 122 | Repair/ Replacement/ Dismantling of Oil Train |
| 123 | Functional Testing and Troubleshooting of FBD |
| 124 | Condition Monitoring of FBD system of MUS / GEM / Zircon |
| 125 | Preventive Maintenance of FBD System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 126 | Replacement/Repair / Dismantling of Oil Control valve system |
| 127 | Replacement/ Repair / Dismantling of Combustion Air Control valve |
| 128 | Replacement/Repair / Dismantling of ID FAN Control Valve Actuator |
| 129 | Repair of Oil Heater control System |
| 130 | Replacement/ Repair / Dismantling of Ratio control System |
| 131 | Checking of Field Instrument signal to DAS Panel for Control room operation and monitoring System |
| 132 | Condition Monitoring of Dryer System |
| 133 | Functional Testing and Troubleshooting of Driyer |
| 134 | Preventive Maintenance of DRIYER system: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 135 | Installation/Dismantling / Replacement of Auto sampler complete system |
| 136 | Replacement of Solenoid coil, Timer, Limit switch, Motor, Proximity sensor |
| 137 | Replacement of Pneumatic Cylinder, 3/2 Solenoid Valve |
| 138 | Replacement of Valve body, rubber sleeve, shaft, Gear system |
| 139 | Realignment of Gear System |
| 140 | Condition Monitoring of Auto Sampling System |
| 141 | Function Testing and troubleshooting of Auto sampling system |
| 142 | Preventive Maintenance of Auto Sampling System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per Pm Checklist. PM Checklist shall be submitted on each occasion. |
| 143 | Installation /Dismantling / Replacement PLC CPU |
| 144 | Replacement/ Dismantling of SMPS, DI / DO/ AI / AO/ Card Rack |
| 145 | Replacement / Dismantling of Relay Unit / Relay Card / Card Battery |
| 146 | Replacement / Dismantling HMI Display |
| 147 | Re-starting of SCADA application S/W/ PLC System |
| 148 | Conditioning Monitoring of PLC and SCADA |
| 149 | Replacement / Dismantling of PLC Based LED Monitor |
| 150 | Checking of Earthing and Supply Voltage PLC Panel |
| 151 | Functional Testing & Troubleshooting PLC System |
| 152 | Preventive Maintenance of PLC & SCADA SYSTEM: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion. |
| 153 | Installation/Dismantling/Replacement of Computer System / Server |
| 154 | Installation/Dismantling/Replacement of Printer System |
| 155 | Cleaning of Computer Unit / Printer Unit |
| 156 | Formating and Drivers Installation of computer system |
| 157 | Replacement/ Dismantling of Mother Board / Fan / SMPS / RAM / Hard Disk / Mouse / Key Board / Monitor |
| 158 | Installation / Dismantling / Replacement of Network Rack 6U / 9U / 19 U |
| 159 | Installation / Dismantling / Replacement of Network Switch |
| 160 | Crimping of Network cable like RJ45 / VGA / DVI / HDMI ..etc |
| 161 | Functional Testing and Troubleshooting of Server /Computer/ Printer/ Network System |
| 162 | Preventive Maintenance of Computer and Network System: Blowering and cleaning, dedusting and terminal tightness…etc as per PM checklist. PM Checklist shall besubmitted on each occasion. |
| 163 | Loop checking AI /AO / DI / DO signal inside Panel System |
| 164 | Loop checking Copper Signal for Field Instruments to Panel |
| 165 | Loop checking Cooper Power Cable |
| 166 | Loop Checking of Communication cable |
| 167 | Installation / Dismantling/ Replacement of UPS System / stabilizer |
| 168 | Installation / Dismantling / Replacement of Battery |
| 169 | Conditioning Monitoring of system includes Recording of Battery Voltage, UPS input & output Voltage and Backup performance |
| 170 | Functional Testing and Troubleshooting of UPS System /stabilizer |
| 171 | Preventive Maintenance of UPS system / stabilizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion. |
| 172 | Installation/Dismantling / Replacement of Junction box - Polycarbonate / PVC / SS/ MS / FRP |
| 173 | Fixing/ Removal of DIN Rail with screw or nut bolts |
| 174 | Fixing / Removal of Terminal Block |
| 175 | Fixing / Removal of Terminal End Plate |
| 176 | Fixing / Removal of Terminal Block stopper |
| 177 | Fixing / Removal of Electronic Relays |
| 178 | Fixing / Removal of required Casing Capping /Duct |
| 179 | New Wiring for Junction Box |
| 180 | Installation / Dismantling /Replacement ofPressure/ Vaccum / Bi-metallic gauges |
| 181 | Repair of Pressure /Vaccum / Bi-metallic gauges |
| 182 | Functional Testing and Troubleshooting of Pressure / Vaccum / Bi-metallic gauges |
| 183 | Preventive Maintenance of Gauges:cleaning and dedusting/ Covering …etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 184 | Installation/Dismantling / Replacement oflevel transmitter |
| 185 | Programming of Level Transmitter as per process requirement |
| 186 | Internal Calibration and Report Generation of Level Transmitter |
| 187 | Functional Testing & Troubleshooting of Level Transmitter/Switch |
| 188 | Preventive Maintenance of level transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check 4-20mA supply ..etc as per PM checklist.PM Checklist shall be submitted on each occasion. |
| 189 | Installation / Dismantling / Replacement of Differential Pressure Switch |
| 190 | Calibration and Report Generation for of Differential Pressure Switch |
| 191 | Functional Testing and Troubleshooting of DP Switch |
| 192 | Preventive Maintenance of Differential Pressure Switch: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion. |
| 193 | Weighbridge in Plant & Mining Area - AMC Support |
| 194 | Weighing Scales/Machine - AMC Support |
| 195 | Belt Weigher - AMC Support |
| 196 | Mass Flow meter - AMC Support |
| 197 | MUS FBD - AMC Support |
| 198 | GEM FBD - AMC Support |
| 199 | Electronic Display Board - AMC Support |
| 200 | Flow Meter Calibration - AMC Support |
| 201 | Master Instruments Calibration - AMC Support |
| 202 | UPS System - AMC Support |
| 203 | Auto Sampler System - AMC Support |
| 204 | Bagging Machine - AMC Support |
| 205 | Fire Alarm System - AMC Support |
| 206 | PLC & SCADA System - AMC Support |
| 207 | Installation /Dismantling / Replacement of Weighing Scale |
| 208 | Replacement of Load Cell / Indicator / Communication Cord |
| 209 | Internal Calibration and Report Generation of Weighing scale with minimum 50% of Capacity |
| 210 | Conditioning Monitoring of Weighing Scale with Test Weight of Minimum 50 Kg |
| 211 | Functional Testing of Weighing Scales |
| 212 | Preventive Maintenance of Weighing Scale:Dusting, surface cleanning, Load cell cable tightness …etc as per Pm checklist. PM Checklist shall be submitted on each occasion. |
| 213 | Checking of Earth plate, Load cell, Platform Nut & Bolt and its tightness. Corrective action for optimal Performance |
| 214 | Greasing of Earth plate, Load cell, Platform Nut & Bolt |
| 215 | Replacement of Load Cell |
| 216 | Replacement of RFID / Camera / IR Sensor / NVR / Light Signal / PoE Switch |
| 217 | Calibration cross Checking with Vehicle in all Weighbridge |
| 218 | Conditioning Monitoring of Weighbridge |
| 219 | Functional Testing and Troubleshooting |
| 220 | Preventive Maintenance Weigh bridge- Dusting, surface cleaning of Digitiser, Computer, Printer, Terminal Tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 221 | Installation / Dismantling / Replacement of Belt Weigher |
| 222 | Replacement / Dismantling load cell / Tachometer / Junction Box |
| 223 | Replacement Belt Weigher Panel |
| 224 | Repair of Belt Weigher Panel |
| 225 | Internal calibration & Report Generation - Drop test |
| 226 | Internal Calibration & Report Generation- Complete with Test Chain |
| 227 | Conditioning Monitoring of Belt Weigher |
| 228 | Functional Testing and Troubleshooting of Belt Weigher |
| 229 | Preventive Maintenance of Belt Weigher: Desting, surface cleaning, Load cell cable tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion. |
| 230 | Replacement / Dismantling of Load Cell/ Pneumatic Cylinder / Solenoid Valve |
| 231 | Replacement / Dismantling of Clamp Belt Rubber (width- 2\"\")/ Foot Switch |
| 232 | Replacement / Dismantling of PU Tubes |
| 233 | Repair of Pneumatic Cylinder / Solenoid Valve |
| 234 | Conditioning Monitoring of Auto bagging System |
| 235 | Functional Testing and Troubleshooting of Auto Bagging System |
| 236 | Preventive Maintenance of Bagging System: Desting, surface cleaning, Load cell cable tightness…etc as per PM Checklist. PM Checklistshall be submitted on each occasion. |
| 237 | Replacement of Needle/ Any Parts |
| 238 | Replacement/ realignment of Looper |
| 239 | Replacement of V-Belt |
| 240 | Overhauling of Stitching Machine |
| 241 | Condition Monitoring of Stitching Machine |
| 242 | Functional Testing and Trouble Shooting of Stitching Machine |
| 243 | Preventive Maintenance of stitching: Blowering and cleaning, oiling, dedusting/Covering and terminal tightness. Etc as per PM Checklist .PM Checklist Shall be submitted on each occasion. |
| 244 | Conditional Monitoring of Fire Alarm System - MSP / TS / STORE & WORKSHOP / ADMINISTRATIVE BUILDING / MRSS & LCSS |
| 245 | Functional Testing of Fire Alarm Control Panel /Smoke/ Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module |
| 246 | Replacement of Smoke/Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module |
| 247 | Replacement of Fire Alarm Panel |
| 248 | Installation/Dismantling / Replacement of Camera |
| 249 | Replacement of PoE Switch/ Power Supply Module / Media Converter |
| 250 | Replacement of Communication/Power Cord |
| 251 | Replacement of CCTV Surveillance Monitor |
| 252 | Replacement of NVR System |
| 253 | Parameter Fixing of NVR system as per requirement |
| 254 | Condition Monitoring of CCTV base Surveillance System- MSP / GEM / MUS / MINING POND / SMP / DWUP / SECURITY / ADMIN BUILDING / GUEST HOUSE |
| 255 | Function Testing and Troubleshooting of CCTV based Surveillance System |
| 256 | Preventive Maintenance of all camera: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist. PM Checklist shall be submitted on each occasion. |
| 257 | Installation/Dismantling / Replacement of Air Regulator /Air Filter / Oil Lubricator |
| 258 | Repair of Air Regulator / Air Filter / Oil Lubricator |
| 259 | Loading and unloading Pressure Setting |
| 260 | Oil Refilling for Compressor |
| 261 | Conditioning Monitoring for Compressor System |
| 262 | Replacement/ Dismantling of condensate drain valve system |
| 263 | Repair of condensate drain valve system |
| 264 | Function Testing and Troubleshooting of Compressor |
| 265 | Preventive Maintenance of compressed air conditioning system: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist of Air condition of standalone system shall be submitted on each occasion. |
| 266 | Installation/Dismantling / Replacement of Air Dryer |
| 267 | Replacement/ Dismantling solenoid valve / Solenoid coil |
| 268 | Replacement / repair of Air Drier Control Unit |
| 269 | Function Testing and Troubleshooting of Air Drier System |
| 270 | Preventive Maintenance of Air Drier: Blowering and cleaning, dedusting and covering, part checking…etc as per PM Checklist. PM Checklist shall be submitted on each occasion. |
| 271 | Brush Painting -Primer |
| 272 | Brush Painting -Paint |
| 273 | Surface Preparation- Chipping/sand Paper/ Buffing |
| 274 | Replacement/Fixing / Removal of MCB / SPD / Contactor/ Timer / Relay / Bush Button / Emergency Button |
| 275 | Replacement/ Fixing/ Removal of 5/6 Ams. 3/5 pin Socket(or) 3/5 pin Plug Top/Switch piano type |
| 276 | Replacement/ Fixing / Removal of 15/16 Ams. 3/5 pin Socket (or) 3/5 pin Plug Top/Switch piano type |
| 277 | Replacement / Fixing / removal of Light Fittings / Light / Fan |
| 278 | Fixing / removal of Electrical PVC/ Wooden/ Metal Junction Box - 4\"\" X 4\"\"/4\"\" X 6\"\"/4\"\"X10\"\"/6\"x12\" |
| 279 | Replacement/ fixing / removal of Transformer / Variac / SMPS |
| 280 | Functional testing of Electrical system |
| 281 | Laying & dressing of PVC Conduit pipe |
| 282 | Laying & dressing PVC Casing and Capping on the wall |
| 283 | Laying & dressing Flexible Conduit |
| 284 | Removal of PVC conduit / Casing & Capping / Flexible Conduit |
| 285 | Connection Fittings- Pipe/ casing capping |
| 286 | Laying of GI / MS / SS Pipe |
| 287 | Laying of HDPE Pipe |
| 288 | Fixing of HDPE Fitting |
| 289 | Dismantling and Disposal of old or unused Pipe / casing capping |
| 290 | Dismantling and Disposal of old or HDPE Pipe |
| 291 | Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size up to 1/2 \"\" |
| 292 | Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size- above 1/2\"\" to 1 \"\" |
| 293 | Junction Box Fixing Bracket up to 2 sq. ft.: Mild steel |
| 294 | Junction Box Fixing Bracket above 2 sq. ft- 4 sq. ft.: Mild Steel |
| 295 | MS Fabrication as per Drawing provided EIC |
| 296 | MS Flange fabrication as per requirement with pipe up to 50 mm |
| 297 | MS Flange Fabrication above 50mm - 100 mm |
| 298 | SS/MS Cover for Field Instruments as per Drawing- max. sheet thickness 3 mm |
| 299 | Laying of MS / GI Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm |
| 300 | Laying of MS / GI Cable Tray Ladder Type- up to 200 X40X 6 mm |
| 301 | Laying of MS/ Gi cable Tray Fittings |
| 302 | Fixing of MS / GI Tray Support |
| 303 | Laying of FRP Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm |
| 304 | Laying of FRP Cable Tray Ladder Type- up to 200 X40X 6 mm |
| 305 | Laying of FRP cable Tray Fittings |
| 306 | Fixing of FRP Tray Support of MS material |
| 307 | Removing of old cable from wall/cable tray/Cassing /open area and disposal to designated area as per direction EIC after weighment within area 100 mtr. Inside the plant premises. |
| 308 | Collection of old metal scrap from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises. |
| 309 | Collection of old electronic waste from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises. |
| 310 | Preparation soft soil trench of size 30 cm X 30 cm X 30 Cm and refilling after cabling/piping. Etc work |
| 311 | Preparation of Hard soil (RCC) by cutting of size 20 cm X 20 cm X 20 cm and reconditioning to originality by filling with plain concrete after laying of pipe or cable |
| 312 | Replacement/ Dismantling /Installation of Control Panel of Booster Pump |
| 313 | Repair of Booster Pump control system |
| 314 | Functional testing and Troubleshooting of Booster Pump |
| 315 | Installation/ Dismantling / replacement of Replacement of Spillage Alarm Panel System |
| 316 | Replacement of Sensor switch |
| 317 | Conditional Monitoring of Spillage Control System |
| 318 | Functional testing and Troubleshooting of Spillage Alarm System |
| 319 | Preventive Maintenance of Spillage Control System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklistshall be submitted on each occasion. |
| 320 | The Work Which are not included in the above List |
| 321 | Replacement / Dismantling / installation of Piezometer |
| 322 | Internal Calibration |
| 323 | Functional Testing & Troubleshooting |
| 324 | Condition Monitoring of Piezometer System |
| 325 | Preventive Maintenance of Piezometer System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklistshall be submitted on each occasion. |
| 326 | Installation/ Replacement of IR Occupancy Sensor |
| 327 | Installation /Replacement of Indicator light |
| 328 | Repair/ Installation/ Dismantling of Parking LED Monitor |
| 329 | Functional Testing & Troubleshooting of Smart Parking Facility |
| 330 | Condition Monitoring of Smart Parking Facility |
| 331 | Preventive Maintenance of Smart Parking Facility: Blowering and cleaning, dedusting…etc as per PM Checklist shall be submitted on each occasion. |
| 332 | Installation/ Replacement of Boom |
| 333 | Installation/ Replacement of Motor for Boom barrier |
| 334 | Installation/ Replacement / Repair of Mother Board card/ IR Sensor |
| 335 | Installation/ Replacement of RFID Scanner / Controller |
| 336 | Functional Testing & Troubleshooting of Boom Barrier System |
| 337 | Condition Monitoring of Boom Barrier System |
| 338 | Preventive Maintenance of Boom barrier System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion. |
| 339 | Installation/ Replacement / Repair of RF-NIC card |
| 340 | Installation/ Replacement / Repair of DCU-NIC card |
| 341 | Functional Testing & Troubleshooting of Smart Metering System |
| 342 | Condition Monitoring of Smart Metering System |
| 343 | Preventive Maintenance of Smart Metering System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion. |
| 344 | Installation/ Replacement / Repair of Signal Light |
| 345 | Installation/ Replacement / Repair of Traffic Camera |
| 346 | Installation/ Replacement / Repair of Traffic Controller |
| 347 | Functional Testing & Troubleshooting of Intelligent Traffic Management System |
| 348 | Condition Monitoring of Intelligent Traffic Management System |
| 349 | Preventive Maintenance of Intelligent Traffic Management System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion. |
| 350 | Engagement of one 5 Seated Bolero Camper or TATA Xenon with driver for 8 Hrs Operation from 9:00 AM to 5 PM. The Vehicle shall be of 2019 Model or subsequent. |
| 351 | Kilometer run by the Vehicle :-Fuel Charge shall be reimbursed @ 1Litre for every 12 Kilometers run by the Vehicle |
AI Tender Summary
Tender Timeline
Nov 02, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedNov 23, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 24, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender