Bharat Heavy Electricals Limited-BHEL has published Tender For Supply And Fitment Of Spare Parts Of Kobelco Make 250Mt Cke2500-2 Crawler Crane (M/C S/N. Jd-04-02373) Deployed At Bhel-Pser 3X660mw North Karanpura Site, Jharkhand.. Submission Date for this Tender is 11-11-2022. Spare Part Tenders in karanpura Jharkhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 07-Nov-2022 | TCN-1 | Date | 10-11-2022 |
2 | 10-Nov-2022 | TCN-2 | Date | 11-11-2022 |
Sl. No. | Item Description |
1 | Cable |
2 | Cable |
3 | Cable |
4 | Sensor |
5 | Harness |
6 | Harness |
7 | Harness |
8 | Harness |
9 | Harness |
10 | Harness |
11 | Harness |
12 | Harness |
13 | Harness |
14 | Cable |
15 | FilterYT50V01002P1 |
16 | Filter Assy Air |
17 | Compressor Air |
18 | Hose |
19 | Hose |
20 | Hose |
21 | Control Cable |
22 | Control Cable |
23 | V-Belt |
24 | Smart Media card 32MB |
25 | Wire rope front drum |
26 | Bolt |
27 | Oring |
28 | Plug |
29 | Bolt |
30 | Oring |
31 | Oring |
32 | Cap |
33 | Oring |
34 | Bolt |
35 | Relay Box GG24E00024F1 |
36 | Harness for GG24E00024F1 |
37 | Switch |
38 | Limit Switch |
39 | Wire rope |
40 | Wire rope |
41 | Shackle |
42 | Clamp 30Z1D10 |
43 | Wire rope |
44 | Pin split |
45 | Fuse 1 Amps 2479Z2812D1 |
46 | Fuse 2 Amps |
47 | Fuse 5 Amps 2479Z2812D5 |
48 | Fuse 10 Amps 2479Z2812D7 |
49 | Fuse 15 Amps 2479Z2812D8 |
50 | Fuse 20 Amps 2479Z2812D9 |
51 | Fuse 30 Amps 2479Z2812D11 |
52 | Oring |
53 | Pin |
54 | Split pin |
55 | Alram over load EZ53E00013F1 |
56 | PACKING AND FORWARDING (P&F) & INSURANCE CHARGE INCLUDED IN BASIC PRICE |
57 | FREIGHT CHARGE (IN RS.) |
58 | FITMENT CHARGES (LUMPSUM) {INSTALLATION AND FITMENT CHARGES OF SUPPLIED SPARE PARTS FORKOBELCOMAKE 250MT CKE2500-2 CRAWLER CRANE (M/C S/N. JD-04-02373) DEPLOYED AT BHEL-PSER 3X660MW NORTH KARANPURA SITE, JHARKHAND} (FOR 4 DAYS) excluding GST |
59 | OPTIONAL JOB (FOR ADDITIONAL DAYS , IFREQUIRED): IF, SERVICE/ INSTALLATION ENGINEER HAS TO STAY BEYOND STIPULATED TIME PERIOD (i.e. 4 MAN DAYS) AT SITE DUE TO NON AVAILABILITY OR DELAY IN REQUIRED SUPPORT/ INPUT AT SITE AND ATTRIBUTABLE TO BHEL, THEN ADDITIONAL CHARGES PER DAY WILL BE PAID EXTRA BY BHEL TO THE VENDOR WITH APPILCABLE GST AND BOCW CESS. (Maximum upto 10 days). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail