| 1 | Earthwork excavation in foundation in hard or gravelly soil within 50m initial lead and 1.50m initial lift including rough dressing and breaking clods to maximum 5cm to 7 cm and laying in layer not exceeding 0.3 m in depth and as per specification approved by the department |
| 2 | Filling in foundation and Plinth with sand well watered rammed including cost. Conveyance royalty charges. |
| 3 | Cement Concrete (1:3:6) using 40mm size CB metal including labour and cost. Conveyance and royality of materials etc. complete |
| 4 | RCC work in M20 grade concrete (1:1:5:3) with 20mm down grade CBHG chips including cost of centering charges, labour and cost Conveyance and royality of materials etc. complete |
| 5 | a) Column base |
| 6 | b) column and Beam etc. |
| 7 | c) Lintel |
| 8 | d) Chajja |
| 9 | e) Roof slab |
| 10 | f) Fin |
| 11 | Providing, Cutting, bending, binding of MS reinforcement and placing in position including cost of steel, binding wire, T &P and labour etc. complete |
| 12 | Brickwork in foundation and plinth with Flyash Bricks of size 25cm x 12cmx8 cm in CM (1:6) having crushing strength not less than to 75 Kg/cm2 including cost, conveyance ofall materials and labour charges |
| 13 | Brickwork in superstructurewith Flyash Bricks of size 25cm x 12cmx8 cm in CM (1:6) having crushing strength not less than to 75 Kg/cm2 including cost, conveyance ofall materials and labour charges |
| 14 | 12mm thick CP (1:6) over outside smooth surface of brick work including cost, conveyance of all materials and labour charges. |
| 15 | 16mm thick CP (1:6) over inside rough surface of brick work including cost, conveyance of all materials and labour charges. |
| 16 | 12mm thick CP (1:4) with neat cement punning including cost, conveyance of all materials and labour charges. |
| 17 | 6mm thick CP (1:4) over RCC works for celling plaster including cost, conveyance of all materials and labour charges. |
| 18 | 20mm thick CP (1:4) as graded plaster over roof slab including cost, conveyance of all materials and labour charges. |
| 19 | Fixing the Tiles in dados, Skirtings and rises of steps on 12mm thick bed of cement plaster (1:3) joined with cement slurry including cost of tiles |
| 20 | Fixing of Vitrifiede Tiles in floors,treads and landings on25mm thick bed of cement plaster (1:1) joined with neat cement slurry mixed pigment to match the shade of the tiles including rubbing and polishing including cost of tiles |
| 21 | Supplying and fixing MS Door and Windows including cost, conveyance, taxes etc. complete |
| 22 | Finishing walls with two coats of water proofing cement paint of approved shade including cost of cement paint |
| 23 | Painting two coats with synthetic enamel paint to new MS work including cost of paints etc. complete |