Public Administrative Department Government Departments Closing in 0 days TDR #34604084

Tender For Repair And Raising Of Compound Wall And Peripheral Development Of Slaughter House, Ward No.3

Issued by Government Departments · barbil, Odisha
Tender Value
39.88 Lakhs
Estimated cost
Bid Submission
16 Nov 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
barbil → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Repair And Raising Of Compound Wall And Peripheral Development Of Slaughter House, Ward No.3

BOQ

Name of Work: Raising of Compoud wall and Peripherial development of Slaughter House, Ward No-3, Barbil Municipality.
Sl. No. Item Description
1Reinforced Cement Concrete of M-20 grade using 20 mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge with centering and shuttering. A) Lintel Bend
2Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tyng the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties, taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge
3Fly Ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in super structure.
416mmthick cement plaster (1:6)after racking out joints including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge
512mmthick cement plaster (1:6)finished smooth including close deep chipping including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge.
6Finishing wallstwo coatswith weather coat paintof approved quality and approved shade over a coat of cement washingincluding all cost.
7Labour required for cleaning the Ambiance, bushes etc
8Earth work excavation of foundation in stony earth andgravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed.
9Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete.
10Plain cement concrete (1:3:6) using 40 mm. size CBHG stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & Petc all complete in all respect as per Direction of the Engineer in charge.
11Cement concrete of M-20gradewith 20 mm and down grade black hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge .
12Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. includingcost of materials labour complete .
13Rigid & smooth centering & shuttering for C.C wall including false works and dismantling them after casting including cost of materials labour complete
146mmthick cement plaster (1:4) over RCC work finished smooth including close deep chipping including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge.
15Neat cement punning for skriting including all cost of materials and labour.
16Providing Press-cast M-35grade intrerlocking Paver Block of 80mm thick with appropriate colour combination with transportation to the site complete.and supplying all labour ,T&P for laying of Pre-cast M-35 grade interlocking 80mm thick Concrete Paver Blocks of standard size ,shape and colour over sand bed of reqired thickness and compaction with compactor - cum- vibrater machine to proper secreting I, e. Zero on Zero for complete laying area in 8-stage process as directed by Engg-in-charge.
17Earthwork excavation in all kinds of soil loading in truck , transporting and unloading within 5 k.m. lead including all cost
18Compacting and watering upto O.M.C rolling earth work with P.R.R in embankment in layers not exceeding 0.23m by power road roller including hire and running charges of the roller (measurement to be taken on the finished compacted section of the fill under O.M.C condition)
19Collecting , Conveying, stacking and Conveying from stack ,Compacting and watering upto O.M.C rolling moorum with P.R.R in embankment in layers not exceeding 100 by power road roller including hire and running charges of the roller (measurement to be taken on the finished compacted section of the fill under O.M.C condition)
20Reinforced Cement concrete of M-20gradewith 20 mm and down grade black hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge .
21Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. includingcost of materials labour complete .
22Plain Cement Concrete of M-20 grade using 20 mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge.
2312mmthick cement plaster (1:4) over RCC work finished smooth including close deep chipping including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge.
24Supplying, fitting and fixingM.S. shutter and. grillmade out of M.S. Plate/M.S. square bar / M.S. flats / M.S. angles as per approved drawing and design, cutting to required size and welding properly, finished smooth by machine grinding and sand papering, including cost, conveyance, taxes of all materials, required screws, cost of all labour, T&P paintinga coat of red lead primer and painting etc. as required for the work completeincluding the cost of making holes on brick or concrete structure subsequent mending good damages complete as per direction of the Engineer-in-charge.
25Supplying Fabricated conjugate truss for placing over RCC column with Anchor Plate and bold with rafter and Purlin wind ties including cost of materials labour T & P electricity for welding chieseling for removal of welding slags , using plates hammer and wire brush grinding of joints and lathe work to shape the truss in required manner after releasing the welding stress etc complete including painting two coats over a coat of primer
26Painting two coats of synthetic enamel paint over a coat of primer of approved quality and approved shade confirming to ISI on steel work to give an even shade including sand papering and making the surface smooth in all floors at all heights including cost, conveyance,taxes of all materials,labour, sundries, T& P scaffolding required for the work andcomplete in all respect over a coat of primer as per specifications and directions of Engineer-in-charge.
27Supplying and fixing pre-printed flexy sign Boad as directed by Deptt.
28Provisicn of 10 nos of photographs at different stage of execution of the work.
29Provision of one no displayboard of 3ftx3ft size made of MS angle and plate.

AI Tender Summary

OUR REF NO 34604084
AUTHORITY Government Departments
TENDER VALUE 39.88 Lakhs
LAST DATE 16-11-2022
Authority
Authority Name municipality
Work Description Repair And Raising Of Compound Wall And Peripheral Development Of Slaughter House, Ward No.3
Basic Detail
Tender No BBLM-4/2022-23
Bidding Type Tender
Location
City barbil
State Odisha
Key Dates
Publish Date 01 Nov 2022
Submission Date 16 Nov 2022
Open Date 18 Nov 2022
Finance
Tender Value 39.88 Lakhs
Tender Fee 6000
EMD Ref. Documents
Exemption Not Available
Document List
8a4babd6-fb9e-4ae1-9fea-eb7a3810ee16.html
BOQ_414684.xls
DTCN.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 01, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 18, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

8a4babd6-fb9e-4ae1-9fea-eb7a3810ee16.html

xls

BOQ_414684.xls

pdf

DTCN.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders