Tender For Wc For Erection Dt,Pillar Laying Of Cable Mtce Works T.Nagar North And T.Nagar Central Section Sec Tngr Div

Issued by Boards / Undertakings / PSU · nungambakkam, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Nov 2022
0 days left
EMD
5000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
nungambakkam → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Wc For Erection Dt, Pillar Laying Of Cable Mtce Works T.Nagar North And T.Nagar Central Section Sec Tngr Div

BOQ

Name of Work:Erection and dismantling of DT, Structure, Pillar, Laying of HT & LT cable for improvement, extension , DCW works and allied works towards attending HT cable fault of 3x300 and 3x120 sqmm, LT cable fault of 4x240, 4x120, service cable fault of 4x25 and 2x16sqmm, Maintenance of DT, Maintenance of DT Structure and Pillar Maintenance in respect ofT.Nagar North and T.Nagar Central of T.NAGARdivision for period of One year which ever is earlier .
Sl. No. Item Description
1ERECTION OF DISTRIBUTION TRANSFORMER STRUCTURE
2Excavation of Structure Pole Pit 2x3x1/6 th of height
3Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
4Transporting of 9.14 m poles from Road side to pole pit
5Structure pole mass Concreting and coping 0.6x0.6x1.65 for DP structure Including cost of materials and cement.
6Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.DPDC channel, T.I. Fitting etc., in complete.
7Erection of HG fuse set with transport
8Erection of 11 KV AB switch complete setwith transport
9Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt
10Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for DP Structure
11For Triple Pole and four pole structure
12Erection of H.T. jumpering in DP structure complete
13Erection of H.T. LAS
14Erection of L.T. LAS
15Erection of DT excluing loading and unloading
16Upto 100 KVA
17Above 100 KVA
18Painting of two coats of Aluminium paints for DP structure and iron materials including cost of paint and distemper etc.
19Loading and unloading of Distribution Transformer at site and store.
20Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)
21Upto 100 KVA
22Above 100 KVA
23Crane hire charges
24LAYING OF HT CABLE
25Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,
26Normal Road (earth)
27Tar Road
28Concrete Road
29Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites.
303x300 sq mm XLPE (1 drum: 200 m)
313x120 sq mm XLPE (1 drum: 200 m)
32LAYING OF HT CABLE
33Laying of 300 sq mm XLPE cable
34Laying of 120 sq mm XLPE cable
35Covering HT cable by cement \"V\" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough
36Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
37Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums)
38LAYING OF LT CABLE
39Tansport of LT cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites.
40240 sq.mm ( 1 drum - 200 m)
41120 sq. mm ( 1 drum - 500 m)
4225 sq. mm ( 1 drum - 500 m)
4316 sq. mm ( 1 drum - 500 m)
44Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc.
45Normal Road (earth)
46Tar Road
47Concrete Road
48LAYING OF LT CABLE
49Laying of 240 sq.mm cable
50Laying of 120 sq.mm cable
51Laying of 25 sq.mm cable
52Laying of 16 sq.mm cable
53Excavation of 11KV straight joint pit
54Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.
55ERECTION OF PILLAR BOX
56Erection of pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,elec. works, transportion, lead, lift etc.,
574/6/8 way, HRC & mini pillar boxes for 2 feet i-e 0.6m
584/6/8 way,HRC & mini pillar boxes for 3 feet i-e 0.9m(Rate for HB/Con)
594/6/8 way, HRC & mini pillar boxes for 4 feet i-e 1.2 m(Rate for HB/Con)
604/6/8 way, HRC & mini pillar boxes for 5 feet i-e 1.5 m(Rate for HB/Con)
61Cleaning & painting with Aluminium paint 2 coats & numbering with fdr details
628 way pillar box/HRC Pillar Box
636 way pillar box/HRC Pillar Box
644 way pillar box/HRC Pillar Box
65Mini way pillar box/HRC Pillar Box
66DISMANTLING OF PILLAR BOX
67Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
684/6/8 way pillar box/HRC pillar Box
69Mini pillar box/HRC pillar Box
70Erection of cross bracing set
71DP structure
72TP structure
73Erection ofTop Channels
7410\" Centre
7515\" Centre
76Erection of11 KV centre rotating AB switch complete set
77Metering set loading & unloading
78Loading
79Un loading
80Erection ofmetering sets
81Up to 11 metering set
82A).Loading of poles
839.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
84B).Un Loading of poles
859.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
86MAINTENANCE WORK
87Maintenance of DT structure for various capacity (pole mounted structure)
88DP/TP Structure maintenance
89DT maintenance
90Replacement of HT Bushing rod
91Replacement of LT Bushing rod
92Replacement of Gasket
93Structure earthi re - wiring .
94Replacement of Structure earthing in complete without material
95DT structure Yard cleaning
96Numbering of location including cost of paint and labour
97Maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing.
988 way pillar box /6 way pillar box
994 way pillar box
100Mini pillar box
101HRC Fuse Pillar Box
102FixingofMissing Doors in Pillars including materials
103MS Mini Pillar Door
104MS 4 WayPillar Door
105MS 6 Way / 8 wayPillar Door
106FRP 4 Way Pillar Door
107Maintenance of 11 KV ABS only.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
10811 KV AB switch at structure in work site
10911 KV AB switch at SS
110DISMANTLING WORKS
111Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles
112Dismantling of damaged 6 way / 4 wayPillar box
113Dismatling of Transformer structure materials
114Dismatling ofAB Switch with HG Fuse set
115Releasingof \" V \" X Arm
116Stacking of materials / Scarp
117Substation Maintenance
118Removing weed in Substation/Office premises per sq.mtr(Jungle Clearance)
119Hot oil circulation for replacement of Tr.oil in Pr.Tr. With filter machine & loading.
120Transporting offilter machine unit& oil drum (to&fro)
121Cleaning of110 KV Breakersincluding CTs and allied maintenance work
122Cleaning of 110 KVLAS
123Cleaning of 110 KVAB Switch and applying Petroleum jelly
124Cleaning of 110 KV Power transformer insulators and other maintenance work
125Cleaning of 110 KV Bus Insulators
126Cleaning of33/ 11 KV Breakersincluding CTs and allied maintenance work
127Cleaning of 33 KV /11 KVLAS
128Cleaning of 33/11 KVAB Switch including tightening of Bolt & Nutt and applying Petroleum jelly
129Cleaning of 33/11 KV KV Power transformer insulators and other maintenance work
130Cleaning of 33/11 KVBus Insulators
131Aluminium painting in substation
13233KVstructure
13311KV structure
134Power transformer
135Breaker
136ERECTION OFSINGLE POLEDTSTRUCTURE
137Loading andunloading of RCC 9 / 9.14 mtrSquare Pole
138Excavation ofpole pit for 3\" x 3\" x 6\"size
139Erection of RCC 9 / 9.14 mtrSquare Pole including base plate erection.
140Loading , unloading and erection ofHVDSDT (16 ,25 & 40 KVA)
141Excavation of stay Pit for 2\" x 2\" x 6\" size
142Erection of stay set complete including base plate
143SINGLE POLETransformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., completeincluding cost of coal and salt ,Fixing of earth connections with GI wire , bolt and Nuts.
144Erection ofTransformerStructure materials
145Erection of HG fuse set
146Erection of 11 KV AB switch complete set
147Provision of Mass concreting of pole with cement , sand and jelly
148Erection of H.T. LAS
149Erection of L.T. LAS
150Erection of H.T. jumpering in DT structure complete
151Erection of L.T.Open type fuse unit including cable jumpering complete set.
152Heightening of 4 way, 6 wayPillar Boxes:(Water logging area)
153H(80cms)xL(82cm)xW(72cm) size pedestal of Grade-M-20 with steel reinforcement 8mm and 6 mm ring, GI Bolt, Colour, Primer, sticker and paint for pedestal
154Pedestal loading, transport from manufacturing site, and unloading.
155Removing the cable from existing 4 way pillar box
156Existing 4 way pillar box dismantling
157Breaking the existing dismantled pedestal
158Clearing the debris
159Erection of new pedestal and 4 way pillar box
160Reconnecting the cables with 4 way pillar box including all materials like core sleeve, lugs, line connector, insulation tapes etc excluding cable and sleeve kit box
161Painting the 4 way pillarbox with Asian grey paint
162Heightening of Mini Pillar Boxes:(Water logging area)
163H(80cms)xL(70cm)xW(50cm) size pedestal of Grade-M-20 with steel reinforcement 8mm and 6 mm ring, GI Bolt, Colour- Primer, sticker and paint for pedestal.
164Loading, Transport from Manufacturing site and unloading
165Removing the cable from existing mini pillar box
166Existing mini pillar box dismantling
167Breaking the existing dismantled pedestal
168Clearing the debris
169Erection of new pedestal and mini pillar box
170Reconnecting the cables with mini pillar box including all materials like core sleeve, lugs, line connector, insulation tapes etc excluding cable and sleeve kit box
171Painting the pillar box with Asian grey paint
172Raising of Pillar Boxes
173Raising of 4W,6W , 8W Pillar boxes
174Raising of Mini Pillar boxes
175Fixing of Mini pillar door with pad lock,hinges-2 Nos (including cost of material)
176a. Labour charges for welding,painting and earthing of 4w and 6w pillar
177b.Removing and refixing of LT cables in pillar boxes(4w&6w)
178Erection of AB switch alone for DP Switch

AI Tender Summary

OUR REF NO 34602189
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 14-11-2022
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Wc For Erection Dt, Pillar Laying Of Cable Mtce Works T.Nagar North And T.Nagar Central Section Sec Tngr Div
Basic Detail
Tender No TNagar Specn.No.001/22-23 dt.31.10.2022
Bidding Type Tender
Location
City nungambakkam
State Tamil Nadu
Key Dates
Publish Date 31 Oct 2022
Submission Date 14 Nov 2022
Open Date 15 Nov 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 5000
Exemption Not Available
Document List
857bbce5-c69f-4e56-9b26-b4884aecfb9b.html
BOQ_306950.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 31, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 14, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 15, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

857bbce5-c69f-4e56-9b26-b4884aecfb9b.html

xls

BOQ_306950.xls

pdf

Tendernotice_1.pdf