|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead• For thickness of tiles above 25 mm and upto 40 m |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead. |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 m lead.1:3:6 or richers mix. |
| 4 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge |
| 5 | Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in- charge. |
| 6 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 7 | Providing & laying in position cement concrete of specified grade excluding the cost of centering & shuttering -All work up to plinth level. 1:5:10 Cement: 5 Coarse sand: 10graded stone agg. 40mm nominal size).. Crushed |
| 8 | Engagement of labourfor clearance of site (complete job) |
| 9 | Providing & laying in position cement concrete of specified grade excluding the cost of centering & shuttering -All work up to plinth level. 1:3:6(1 Cement: 3 Coarse sand: 6graded stone agg. 20mm nominal size) Crushed |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 11 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. |
| 12 | Centering& shuttering (form work ) including strutting propping etc. & removal of form work for: foundations, footings, bases of columns etc for mass concrete |
| 13 | Providing & Fixing of precast cement concrete paver tiles flooring 60 mm thick cement mortar 1:4 mix & joints to be filled with cement mortar 1:3 mix (Complete Job). |
| 14 | Steel work welded in built up section / framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladders, railing, brackets, gates and similar works |
| 15 | 12mm Cement plaster of mix. 1:4 (1 Cement : 4 Fine sand) |
| 16 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand :4 graded stone aggregate 20mm nominal size). Crushed |
| 17 | Removal of Excavated mulba dismantled unserviceable material from the site of work by mech. Transport / Animal Transport or otherwise including loading complete job. |
| 18 | Carriage of materials by mechanical transportincluding loading / unloading & stacking complete.• Sand/Crusher Dust for an average distance 10 Km by MT |
| 19 | Carriage of materials by mechanical transportincluding loading / unloading & stacking complete.• Stone aggregate below/above 40mm Nominal size Crushed for an average distance of10 kms. |