| 1 | Picking the existing BT surface upto 50mm depth as directed bythe departmental officers and collecting the picked up salvagedmetal and stacking the same for reuse and deposting the debris excludingcost of materials including all labour charges for pickig and all othertools and plants employed for the work and including all other incidental charges etc., complete, as per MORTH Specification. MORTH No. 111, 112, 501, 504, 900, 3004 |
| 2 | Road C |
| 3 | Excavation for Roadway and drainageExcavation including removal and satisfactory disposal of all materials necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer,as per MORTH Specification. Box cutting for widening portion. Morth No. 111, 112, 301, 305, 900 |
| 4 | Road A |
| 5 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401of MORTH Specification- for grading- VMaterial. MORTH No. 111, 112, 401, 900ning portion. Morth No. 111, 112, 301, 305, 900 |
| 6 | Road A (1312.96+33.75) |
| 7 | Road B Approach Road & Diversion Road (65.96+84.00) |
| 8 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401of MORTH Specification- for grading- III Material. MORTH No. 111, 112, 401, 900. |
| 9 | Road A |
| 10 | Road B Approach Road |
| 11 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification. MORTH No. 111,112, 406, 900 |
| 12 | Road A |
| 13 | Road B Approach Road & Diversion Road (131.91+42.00) |
| 14 | Road C |
| 15 | Prime coat Providing and applying primer coat with bitumen emulsion(SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM. MORTH No. 111, 112, 501, 502, 900 |
| 16 | Road A |
| 17 | Road B Approach Road |
| 18 | Road C |
| 19 | Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer. MORTH No. 111,112,501, 503,900 |
| 20 | Road A |
| 21 | Road B Approach Road |
| 22 | Road C |
| 23 | Bituminous Macadam Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), laid over a previously prepared surfaceusing manual labourto the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504of MORTH Specification - Grading II (Table 500-7). MORTH No. 111,112,501,505,900 (For Patch work) |
| 24 | Road A |
| 25 | Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over bituminous surfaces. MORTH No. 111,112,501,503,900 |
| 26 | Road A |
| 27 | Road C |
| 28 | Providing and laying Tack Coat overCement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to an other bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 29 | Road A |
| 30 | Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), laid over a previously prepared surfaceusing manual labourto the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504of MORTH Specification - Grading II (Table 500-7) MORTH No. 111,112,501,505,900 |
| 31 | Road C |
| 32 | Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 40) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisherto the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading I. MORTH No. 111, 112, 501, 505, 900 |
| 33 | Road A |
| 34 | Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 40) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisherto the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading II. MORTH No. 111, 112, 501, 505, 900 |
| 35 | Road A |
| 36 | Road B Approach Road |
| 37 | Bituminous Concrete (Table500-17) Providing and laying bituminous concrete with Hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II MORTH No. 111, 112, 501, 507, 900 |
| 38 | Road A |
| 39 | Road B Approach Road |
| 40 | Road C |
| 41 | Excavation including removal and satisfactory disposal of all materials necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer,as per MORTH Specification. for Berms using Carted Earth with an average lead of 1.00 Km including Compaction by power roller.MORTH No. 111, 112, 301, 305, 900 |
| 42 | Road A (298.59+199.50) |
| 43 | Road B |
| 44 | Road C |
| 45 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Box Culverts |
| 46 | Road A Box Culvert (349.35+349.35+349.35+186.09) |
| 47 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bankwith all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Retaining wall |
| 48 | Road A Retaining Wall (324.50+387.13) |
| 49 | Road B |
| 50 | Plain Cement Concrete of grade M10 grade,using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELLING COURSE UNDER FOOTING OF RETAINING WALL. |
| 51 | Road A (29.50+35.19) |
| 52 | Road B Retaing Wall |
| 53 | Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert and Wing wall. |
| 54 | Road A Box Culvert (17.14+17.14+17.14+10.66) |
| 55 | Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert. |
| 56 | Road A Box Culvert |
| 57 | Road A Box Culvert ( 81.70+81.70+81.70) |
| 58 | Road B RCC Retainig Wall |
| 59 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Wing wall and Parapet. |
| 60 | Road A Box Culvert |
| 61 | Road A Box Culvert ( 61.50+61.50+61.50) |
| 62 | Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. |
| 63 | Road A Box Culvert (5.552+5.552+5.552+3.332) |
| 64 | Road B RCC Retaining Wall & Minor Bridge (6.287+11.049) |
| 65 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Broken Parapet. |
| 66 | Road B RCC Retaining Wall |
| 67 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Below Sill Level.. |
| 68 | Road A Retaining Wall |
| 69 | Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges forlaying,compacting, curing all incidental charges etc., complete for Above Sill Level. |
| 70 | Road A Retaining Wall |
| 71 | Filling behind Retaining Wall with carted earth with 1 Km lead to required thick below the foundation concrete including cost and conveyance of all material to site form any approved source satisfying the standard and specifications, and all labour charges for filling in layers compacting, ramming to obtain the maximum density by watering to obtain the maximum density by watering with all leads for water including all other incidental charges such as bailing out water if necessary forming protective bunds etc., complete. MORTH No. 111, 112, 2900 |
| 72 | Road A Retaining Wall (48.90+41.00) |
| 73 | Road B RCC Retaining Wall |
| 74 | Excavation including removal and satisfactory disposal of all materials necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer,as per MORTH Specification. Refilling Behind retaining walls using suitable earth MORTH No. 111, 112, 301, 305, 900 |
| 75 | Road A Retaining Wall (324.50+387.13) |
| 76 | Road B RCC Retaining Wall |
| 77 | Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN THE RETAINING WALL. |
| 78 | Road A Retaining Wall (191.10+222.89) |
| 79 | Road B RCC Retaining Wall |
| 80 | Supplying and fixing 20mm thick Bitumen Pad 20mm expansion gap provided in between Retaining wall as shown in the drawing including cost and conveyance expansion joints etc., complete |
| 81 | Road A Retaining Wall 3m (7.99+15.98) |
| 82 | Vibrated Cement Concrete M20 using 20mm ISS size HBG metal including cost and conveyance of all materials to worksite and cost of cement at site including cost of soft water, labour charges for mixing, transporting, laying, curing working at depths, tools and plants etc. complete as perstandard specifications forpile cap areaas per MORTH Rev.V. No.1000,1500,1700,2100. |
| 83 | Road A Median Kerb |
| 84 | Painting the existing Center median with one coats of best approved first quality and colour or synthertic enemal paint including coast of paint, labour and other materials like brushes, putty, soap and also scaffolding charges etc., compleying with standard specification and as directed by the departmental officer for Median Kerb. |
| 85 | Road A Median Kerb |
| 86 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. |
| 87 | Road B |
| 88 | Earthwork excavation in Soft Disintegrated rock not requiring blastingexcept medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS. |
| 89 | Road B |
| 90 | PlainCement Concrete of grade M15 grade using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE UNDER FOOTING |
| 91 | Road B |
| 92 | VibratedCement Concrete of grade M20 grade, Nominal Mix using 40mm metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF ABUTMENT, PIERS AND WINGS BELOW SILL LEVEL |
| 93 | Road B |
| 94 | VibratedCement Concrete of grade M20 grade, Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL |
| 95 | Road B |
| 96 | VibratedReinforced Cement Concrete of grade M30 design mixusingISS size HBG graded metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS, - |
| 97 | Road B |
| 98 | Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS |
| 99 | Road B |
| 100 | Providing and fixing KRAFT PAPER for full width of seating of deck slab andincluding cost and conveyanceto work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete. |
| 101 | Road B |
| 102 | Vibrated Reinforced Cement ConcreteM30 Grade Design mix using Crusher ISS, HBG graded Metalincluding cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting , curing including all incidental charges etc., complete for DECK SLAB. MORTH No. 111, 112, 1000, 1500, 1600, 1700, 2200, 2300, 900 |
| 103 | Road B |
| 104 | Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick andwell compacted in layerswith smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site includingall labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST\"s (Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete |
| 105 | Road B |
| 106 | Filling behind Abutmants and wings with clean gritty gravel including cost and conveyance of gravel to worksite,laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density including watering,with all leads for water and all other incidental charges etc,complete for filling behind the abutment and wings. |
| 107 | Road B |
| 108 | Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete |
| 109 | Road B |
| 110 | Vibrated Cement Concrete M15 grade Nominal Mix using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB. |
| 111 | Road B |
| 112 | Vibrated reinforced cement concrete M30 design mix using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for Approach Slab |
| 113 | Road B |
| 114 | Vibrated cement Concrete M30 design mixusing ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing cost of 75mm uniform thickness over deck slab and approach slab |
| 115 | Road B |
| 116 | Vibrated Reinforced Cement Concrete M-40, Grade, Design Mix,using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc.,, complete for RCC CRASH BARRIERS OVER DECK SLAB. |
| 117 | Road B |
| 118 | Vibrated Cement Concrete M20 grade Nominal Mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for PCCPARAPETS OVER WINGS |
| 119 | Road B |
| 120 | Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete. |
| 121 | Road B |
| 122 | Supply and fixing of High Quality of PVC pipes of 160mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths. |
| 123 | Road B |
| 124 | Vibrated Cement Concrete M20 grade Nominal Mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Toe wall |
| 125 | Road B |
| 126 | Manufacturing and fixing of Cement Conncrete blocks of size 250mm x 250mm x 300mm in CC 1:2:4 nominal mix (M15 Grade) using 20mm ISS size HBG metal including cost and conveyance of all materials to work site and cement at site including conveyance and handling charges for the same at both ends, including all other incidental charges etc., complete for Apron. |
| 127 | Road B |
| 128 | Excavation including removal and satisfactory disposal of all materials necessary for the construction ofroad way and side drains inaccordance with specifications and the lines , grades and crosssections shown in the drawingsor as indicatedby the Engineer for Carted Eath (1Km Lead)for formation of Approach Road. |
| 129 | 95% Compaction Approach Road |
| 130 | 97% Compaction Approach Road |
| 131 | Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete. MORTH No. 2900, 900 |
| 132 | Road B Diversion Road |
| 133 | Hoisting and fixing of 1000 mm dia pipes proper gradient including all labour charges and all other incidental charges etc., complete. MORTH No. 2904, 2905, 2906 |
| 134 | Road B Diversion Road |
| 135 | Providing RCC M15 grade precast KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer |
| 136 | Road C |
| 137 | Providing RCC M15 grade precast HM Stone of standard design as per IRC: 26 - 1976 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer. |
| 138 | Road C |
| 139 | Supply and fixing of RCC Guide post of size 0.20 x 0.20 x 1.20m using vibrated RCC 1:2:4 mix using 20mm ISS HBG metal and fixing 0.50m below GL and side packing CC 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site, including moulding and fixing charges and all other incidental charges, etc., complete as directed by the Engineer. |
| 140 | Road C |
| 141 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 142 | Basic cost of value put to tender as per estimate |
| 143 | Add GST at 18% |
| 144 | Total Value put to Tender |
| 145 | Quoted value |
| 146 | Final Quoted Value |
| 147 | Add GST at 18% of Final Quoted Value |
| 148 | Total Value of Contract Including 18% of GST |
| 149 | Basic cost of value put to tender as per Estimate |
| 150 | Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) |