| 1 | Working Charges |
| 2 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) |
| 3 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 4 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. |
| 5 | 18.17.6:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore |
| 6 | OD116669/2022-2023:Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary. |
| 7 | OD116670/2022-2023:160 mm dia PVC pipe for Valve protection |
| 8 | OD116671/2022-2023:Interconnection of newly laid PVC pipe line with existing AC/PVC/G.I. pipe line using suitable specialsincluding cost of necessary earth work , cost of materials, labour charges , conveyance etc. complete as per directions. |
| 9 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 10 | OD116672/2022-2023:Supplying, Conveying and fixing in position 90 mm PVC End Cap (10 Kg/cm2) in position as per directions. |
| 11 | Supply of Material s |
| 12 | 100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia. |
| 13 | Note:GST @ 18% should be paid additionally |