Name of Work: Infrastructure Works (Loss Reduction) under Revamped Distribution Sector Scheme
Sl. No.
Item Description
1
Replacement of Old and frayed Conductor
2
Providing andReconductoring of overloaded 11 KVAB Cable by 3X95sqmm XLPE AB Cable (includes dismantling of existing AB Cable, replacement with new AB Cable and dismantled materials are to be returned to DISCOM Store). Scope of work Clause 1.A may be referred.
3
Providing and Reconductoring of overloaded LT AB Cable by 3X120sqmm XLPE AB Cable (includes dismantling ofexisting AB Cable, replacement with new AB Cable and dismantled materials are to be returned to DISCOM Store). Scope of work Clause 1.B may be referred.
4
Providing and reconductoring of 11kV Bare Conductor by using 80 sqmm. 6/1/4.09 mm. ACSR Racoon conductor (Includes dismantling of conductor, replacement of conductor and dismantled materials are to be returned to DISCOM Store). Scope of work Clause 1.C may be reffered.
5
Segregation/Bifurcation of 11kV and LT Feeders
6
Construction of New 11kV line with SP35 GI Pole & Brackets and 80 sqmm. 6/1/4.09 mm. ACSR Racoon conductor. Scope of work Clause 2.A may be reffered.
7
Construction of New 11kV AB Cable 3X95sqmm XLPE on SP35 GI pole (in thick vegetation area/ ROW). Scope of work Clause 2.B may be reffered.
8
Construction of New LT line on SP29 GI Pole & Brackets with 50 sqmm., 7/3.10 mm. AAC Ant conductor - 5 wire. Scope of work Clause 2.C may be reffered.
9
Construction of New 11 KV AB Cable line by dismantling existing bare 11kV line by 3X95sqmm XLPE AB Cable (in thick vegetation areas/ ROW) on SP35 GI pole (Includes dismantling of conductor/ AB Cable, replacement by AB Cable and dismantled materials are to be returned to DISCOM Store). Scope of work Clause 2.D may be reffered.
10
Provision for AB Cable
11
Construction of New LTAB Cable 3X120sqmm XLPE on SP29 GI pole (Considering span length of 30 mtr.). Scope of work Clause 3.A may be reffered.
12
Construction of New LT AB Cable 3X95sqmm XLPE on SP29 GI pole (Considering span length of 30 mtr.)including civil works for erection of pole. Scope of work Clause 3.B may be referred.
13
Construction of New LT line 3X120sqmm XLPE AB Cable in existingRoW on SP29 GI pole (Construction of 33 nos of poles and dismantling works of existing line and dismantled material are to be returned to DISCOM store). (Considering span length of 30 mtr.). Scope of work Clause 3.C may be referred.
14
Construction of New LT line 3X95sqmm XLPE AB Cable in existing RoW on SP29 GI pole (33 nos of poles and dismantling works of existing line and to be returned to DISCOM centralised store). Scope of work Clause 3.D may be referred.
15
Providing and Installation of DB (The DB Box shall be mounted on each LT poles) and Piercing Connector. Scope of work Clause 3.E may be referred.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.