1 Wiring As Per Item No. 1 Of Unpriced Boq But For One Light / Exhaust / Ceiling Wiring As Per Item No. 1 Of Unpriced Boq But For One Light / Exhaust / Ceiling Fan Point Controlled By One 6 Amp. Modular Type Switch Complete As Directed. ( Avg Length Of Circuit Is 20 Meter And Avg Length Of Light Point Is 5 Meter ) 2 2 Wiring As Per Item No. 1 But For Two Light / Exhaust / Ceiling Fan Point Controlled Wiring As Per Item No. 1 But For Two Light / Exhaust / Ceiling Fan Point Controlled By One 6 Amp. Modular Type Switch Complete As Directed. ( Avg Length Of Circuit Is 20 Meter And Avg Length Of Light Point Is 5 Meter ) 3 3 Wiring As Per Item No. 1 But For Three Light / Exhaust / Ceiling Fan Point Controlled Wiring As Per Item No. 1 But For Three Light / Exhaust / Ceiling Fan Point Controlled By One 6 Amp. Modular Type Switch Complete As Directed. ( Avg Length Of Circuit Is 20 Meter And Avg Length Of Light Point Is 5 Meter ) 4 4 Wiring As Per Item No. 1 But For Four Light / Exhaust / Ceiling Fan Point Controlled Wiring As Per Item No. 1 But For Four Light / Exhaust / Ceiling Fan Point Controlled By One 6 Amp. Modular Type Switch Complete As Directed. ( Avg Length Of Circuit Is 20 Meter And Avg Length Of Light Point Is 5 Meter ) 5 5 Wiring As Per Item No. 1 But For Five Light / Exhaust / Ceiling Fan Point Controlled Wiring As Per Item No. 1 But For Five Light / Exhaust / Ceiling Fan Point Controlled By One 6 Amp. Modular Type Switch Complete As Directed. ( Avg Length Of Circuit Is 20 Meter And Avg Length Of Light Point Is 5 Meter ) 6 6 Wiring As Per Item No. 1 But For Six Light / Exhaust / Ceiling Fan Point Controlled Wiring As Per Item No. 1 But For Six Light / Exhaust / Ceiling Fan Point Controlled By One 6 Amp. Modular Type Switch Complete As Directed. ( Avg Length Of Circuit Is 20 Meter And Avg Length Of Light Point Is 5 Meter ) 7 7 Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches -2 Nos. And 6 Amp Socket- 3 Nos Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 40 Meter ) - ( Ups Points For The Work Station ) 8 8 Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches -2 Nos. And 6 Amp Socket- 3 Nos Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 32 Meter ) - ( Ups Points For The Work Station ) 9 9 Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches -2 Nos. And 6 Amp Socket- 3 Nos Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 24 Meter ) - ( Ups Points For The Work Station ) 10 10 Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches -2 Nos. And 6 Amp Socket- 3 Nos Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 18 Meter ) - ( Ups Points For The Work Station ) 11 11 Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches -2 Nos. And 6 Amp Socket- 3 Nos Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 12 Meter ) - ( Ups Points For The Work Station ) 12 12 Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches -2 Nos. And 6 Amp Socket- 3 Nos Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 8 Meter ) - ( Ups Points For The Work Station ) 13 13 Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches Wiring As Per Item No.1.0 But For 8 Module Box With 6 Amp Switches -2 Nos. And 6 Amp Socket- 3 Nos Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 4 Meter ) - ( Ups Points For The Work Station ) 14 14 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 40 Meter ) - For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 15 15 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 32 Meter ) - For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 16 16 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 24 Meter ) - For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 17 17 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 18 Meter ) -For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 18 18 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 12 Meter ) -For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 19 19 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 8 Meter ) -For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 20 20 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 4 Meter ) -For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 21 21 Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Wiring As Per Item No.1.0 But For 6 Amp Independent Switch Socket Point Complete Modular Switch, Socket Etc. ( Length Of Circuit- Up To 2 Meter ) -For Fan Points Switch And Socket Shall Be Separate. Rate Shall Include The Cost Of Cutting Of Work Station Plate For Accomodating Switch Plate. 22 22 Wiring Same As Above For 6 Amp Switch Socket Point But On Switch Board Wiring Same As Above For 6 Amp Switch Socket Point But On Switch Board. ( Half Point ) 23 23 Wiring As Per Item No.1.0 But For Power Point Using 2X4sqmm + 1X2.5Sqmm Wiring As Per Item No.1.0 But For Power Point Using 2X4sqmm + 1X2.5Sqmm Pvc Frls Copper Wire With 6Pin 16A Socket With16 A Modular Switches With Indicator Housed In Concealed Manner Complete As Directed. ( For Primary Power Point Directly Frlsom Mcb Db ) ( Length Of Circuit- Up To 40 Meter ) . For Ac Point Switch And Socket Shall Be Separate. 24 24 Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Pvc Frls Copper Wire With 6Pin 16A Socket With16 A Modular Switches With Indicator Housed In Concealed Manner Complete As Directed. ( For Primary Power Point Directly Frlsom Mcb Db ) ( Length Of Circuit- Up To 32 Meter ) . 25 25 Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Pvc Frls Copper Wire With 6Pin 16A Socket With16 A Modular Switches With Indicator Housed In Concealed Manner Complete As Directed. ( For Primary Power Point Directly Frlsom Mcb Db ) ( Length Of Circuit- Up To 24 Meter ) . 26 26 Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Pvc Frls Copper Wire With 6Pin 16A Socket With16 A Modular Switches With Indicator Housed In Concealed Manner Complete As Directed. ( For Primary Power Point Directly Frlsom Mcb Db ) ( Length Of Circuit- Up To 18 Meter ) . 27 27 Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Pvc Frls Copper Wire With 6Pin 16A Socket With16 A Modular Switches With Indicator Housed In Concealed Manner Complete As Directed. ( For Primary Power Point Directly Frlsom Mcb Db ) ( Length Of Circuit- Up To 12 Meter ) . 28 28 Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Wiring As Per Item No.1.0 But For Power Point Using 2X2.5Sqmm + 1X1.5Sqmm Pvc Frls Copper Wire With 6Pin 16A Socket With16 A Modular Switches With Indicator Housed In Concealed Manner Complete As Directed. ( For Primary Power Point Directly Frlsom Mcb Db ) ( Length Of Circuit- Up To 8 Meter ) . 29 29 Specification Same As Above ( 1.23 -1.28 Of Unpriced Boq ) , For Specification Same As Above ( 1.23 -1.28 Of Unpriced Boq ) , For 16 Amp Switch Socket Point But On Switch Board. ( Half Point ) 30 30 Supply & Providing Wiring For Telephone Point By Providing Suitable Supply & Providing Wiring For Telephone Point By Providing Suitable Junction Box ( 4X4 Metal Box Concealed In Wall / Work Station With Cover ) And Wiring With Two Pair 0.5 Mm. Dia Copper Conductor Pvc Insulated In Suitable Dia Pvc Conduit As Described In Item 1.0. The Rate Shall Include For Providing Modular Telephone Sockets With Respective Make, Required Size Mounting Plate Fixed On M.S. Box Concealed In Wall, Termination Of The Wire At Both Ends. ( 100 Pair Krone Box Will Be Provided And The Cables Are To Be Terminatted On The Same ) . 31 31 Wiring As Per Item No.1.0 But For Using 2X4sqmm + 1X2.5Sqmm Wiring As Per Item No.1.0 But For Using 2X4sqmm + 1X2.5Sqmm Pvc Frls Copper Wire. The Work Include Termination At Both The Ends ( For Connecting Existing Ac Points / Power Points In The Fidd Area 32 32 Wiring As Per Item No.1.0 But For Using 2X2.5Sqmm + 1X1.5Sqmm Wiring As Per Item No.1.0 But For Using 2X2.5Sqmm + 1X1.5Sqmm Pvc Frls Copper Wire. The Work Include Termination At Both The Ends ( For Connecting Existing Ups Points / Power Points In The Fidd Area 33 33 Supply, Installation, Testing And Commissioning Of 12 Way Vertical 3 Phase Supply, Installation, Testing And Commissioning Of 12 Way Vertical 3 Phase ( Vtpn ) Mcb Db Double Door Factory Fabricated, Ip 43 Protection In Concealed / Partially Concealed Manner Complete With Loop Connections , Earthing Etc With The Following Rccb And Mcbs 1. 4 Pole Rccb 40 A, 30 Ma- 1 No 2. 4 Pole Mcb 40 A- 1 No 3. 1 Pole Mcb 32 / 20 / 16 / 10 / 6 A- 36 Nos 34 34 Supply, Installation, Testing And Commissioning Of 8 Way Vertical 3 Phase Supply, Installation, Testing And Commissioning Of 8 Way Vertical 3 Phase ( Vtpn ) Mcb Db Double Door Factory Fabricated, Ip 43 Protection In Concealed / Partially Concealed Manner Complete With Loop Connections , Earthing Etc With The Following Rccb And Mcbs 1. 4 Pole Rccb 63 A, 30 Ma- 1 No 2. 4 Pole Mcb 63 A- 1 No 3. 3 Pole Mcb 32A- 1 No 4. 1 Pole Mcb 32 / 20 / 16 / 10 / 6 A- 21 Nos 35 35 Supply, Installation, Testing And Commissioning Of 8 Way 3 Phase Mcb Db Supply, Installation, Testing And Commissioning Of 8 Way 3 Phase Mcb Db ( Tpn ) Double Door Factory Fabricated, Ip 43 Protection In Concealed / Partially Concealed Manner Complete With Loop Connections , Earthing Etc With The Following Rccb And Mcbs 1. 4 Pole Rccb 40 A, 30 Ma- 1 No 2. 4 Pole Mcb 32 A- 1 No 3. 1 Pole Mcb 32 / 20 / 16 / 10 / 6 A- 24 Nos 36 36 Supply, Laying, Testing And Commissioning Of The 4 Core 10 Sqmm Xlpe Supply, Laying, Testing And Commissioning Of The 4 Core 10 Sqmm Xlpe Insulated Pvc Sheathed Power Cable Of 1.1 Kv Grade Armoured Copper Cable Including End Terminations With Brass Compression Glands And Suitable Copper Lugs As Per Standard And 2 Runs Of 12 Guage Bare Copper Along With Its Termination As Directed. On Wall Or Ceiling In Partially Concealed / Partially Surface Manner Using Spacers And Saddles. 37 37 Supply, Laying, Testing And Commissioning Of The 4Core 6 Sqmm Xlpe Supply, Laying, Testing And Commissioning Of The 4Core 6 Sqmm Xlpe Insulated Pvc Sheathed Power Cable Of 1.1 Kv Grade Armoured Copper Cable Including End Terminations With Brass Compression Glands And Suitable Copper Lugs As Per Standard And2 Runs Of 12 Guage Bare Copper Along With Its Termination As Directed As Directed. On Wall Or Ceiling In Partially Concealedo / Partially Surface Manner Using Spacers And Saddles. 38 38 Supply And Fixing Of 2X2 Led Fitting Of Wattage 36 Watts On The Ceiling Supply And Fixing Of 2X2 Led Fitting Of Wattage 36 Watts On The Ceiling With Necessary Accessories Including Frame. 39 39 Supply And Fixing Of Led Round Fitting Of Wattage 15 Watts On The Ceiling Supply And Fixing Of Led Round Fitting Of Wattage 15 Watts On The Ceiling With Necessary Accessories 40 40 Supply, Installation, Testing And Commissioning Of Passive Infrared Supply, Installation, Testing And Commissioning Of Passive Infrared Technology Based ( Pir ) Based Occupancy Sensor Suiable For Connected Load Upto 6 Amps With Features Of 360� Detection, Programmable Time Delay Etc. 41 41 Supply, Installation, Testing And Commissioning Of 400Mm Wall Mount Fan Supply, Installation, Testing And Commissioning Of 400Mm Wall Mount Fan 42 42 Supply, Installation, Testing And Commissioning Of 400Mm Pedestal Mount Supply, Installation, Testing And Commissioning Of 400Mm Pedestal Mount Fan 43 43 Supply, Laying, Testing And Commissioning Of Jelly Filled Armoured Supply, Laying, Testing And Commissioning Of Jelly Filled Armoured Telephone Cable 0.5 Mm, 100 Pair, Including Termination At Both Sides On The Krone Boxes 44 44 Supply, Installation, Testing And Commissioning Of 100 Pair Krone Box With Krone Modules Supply, Installation, Testing And Commissioning Of 100 Pair Krone Box With Krone Modules 45 45 Supply And Laying Of 2 X 1.5 Sq.Mm Twisted Armoured Frls Cable ( Red Colour ) Supply And Laying Of 2 X 1.5 Sq.Mm Twisted Armoured Frls Cable ( Red Colour ) For Fire Loop Etc On Ceiling / Walls With All Accessories Hardware And Fixing Materials I.E Saddles, Screws, Ms Supports, Proper Terminations Using Brass Glands / Copper Thimbles On Various Devices , Boxes, 46 46 Supply, Laying, Testing And Commissioning Of 2C X 1.0Sq.Mm Speaker Supply, Laying, Testing And Commissioning Of 2C X 1.0Sq.Mm Speaker Wire In Suitable Dia. Pvc Conduit With Required Accessories Like Bends, Tees, Junction Boxes Etc., In Surface Manner Clamped Suitably On Wall / Ceiling As Required And Supported By Dual Down Rods With Channels Above False Ceiling. 47 47 Supply, Installation, Testing And Commissioning Of Ceiling Mounted Supply, Installation, Testing And Commissioning Of Ceiling Mounted Speaker Of Minimum Sound Output Of 6 Watts On The False Ceiling 48 48 Charges For Removal Of Exiting Wiring / Dbs / Enclosure Boxes / Switch Charges For Removal Of Exiting Wiring / Dbs / Enclosure Boxes / Switch Boxes / Light Fittings Etc 49 49 Supply And Laying Of Pvc Conduit ( 25Mm ) Medium Duty In Concealed Supply And Laying Of Pvc Conduit ( 25Mm ) Medium Duty In Concealed Manner With A Gi Wire For Pulling Cable In Future. 50 50 Buy Back Of Old Wiring / Dbs / Enclosure Boxes / Switch Boxes / Light Buy Back Of Old Wiring / Dbs / Enclosure Boxes / Switch Boxes / Light Fittings / Ceiling Fans ( Except Wall Fans ) Etc