Kanpur Electricity Supply Co Limited-KESCO has published Tender For Work For Attending Breakdown As Well As Maintenance, Change The Damaged Pole, Feeder And Lines With Loading And Unloading Of Materials, Equipment, Annual Maintenance Of Transfer And Other Related Work In Kalyanpur Divsion. Submission Date for this Tender is 02-11-2022. Tree Cutting Tenders in kalyanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Pole Work |
2 | Dismentalling of X-Arm/L.T. brackets and insulators etc. from the damaged pole/pole to be replaced/shifted. |
3 | Excavation of foundation and taken out the damaged pole/pole to be replaced/shifted from the ground. |
4 | Strengthening of damaged pole by providing and welding of pipe or angle by overlapping in the place of damaged portion. |
5 | Loading, Carriage and unloading of poles from store to work site. |
6 | Loading, Carriage and unloading of damaged poles from work site to store. |
7 | Loading, Carriage and unloading of damaged PCC poles fromstore to work site. |
8 | Grouting of pole with cement brick ballast and coarse sand as per Standard Spacification. |
9 | Grouting of PCC pole with cement brick ballast and coarse sand as per Standard Spacification. |
10 | Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings. |
11 | Erection of PCC pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings. |
12 | Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
13 | Painting of Steel Tubular Poles after rubbing, cleaning with emery paper and coating one coat of redoxide on full length of pole and then two coat of Aluminum paint upto X-arm from top including cost of paint and redoxide paint used should be ISI mark Ist class enamel paint. |
14 | Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications. |
15 | Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials. |
16 | Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification) |
17 | Erection of Tri-Pole structure including fitting of channels etc. and proper alignment. |
18 | Erection of four pole structure including fitting of channels etc. as well as proper alignment of structure. |
19 | Increasing the pole length to Cross H.T./L.T. OH line by welding of M.S. pipe with all Material |
20 | Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection. |
21 | Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
22 | Line Work (Conductor) |
23 | Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles. |
24 | Loading, carriage and unloading of conductor fromstore to work site and vice versa |
25 | Re-sagging of conductor, on old line after erection of pole, binding of conductor etc. |
26 | Laying, stringing, tensioning and binding of Weasal conductor for H.T./L.T. O.H. |
27 | Laying, stringing, tensioning and binding of Dog conductor for H.T./L.T. O.H. |
28 | Fixing of guarding angle/guarding channel for laying of guarding |
29 | Laying, stringing, tensioning & final sagging ofEarth wire/G.I. wire |
30 | Cross laying of guarding by G.I. wire (approximate 5 lacing of each span) |
31 | Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. |
32 | Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work. |
33 | Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. |
34 | Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections. |
35 | Fabrication/modifications of M.S. Items as per requirement of site conditions. |
36 | Jumpering of H.T. Lines from the existing H.T.O.H. line. |
37 | Jumpering of L.T. Lines from the existing L.T.O.H. line. |
38 | Triming of tree branches which are in range of line conductor to avoide breakdown, triming due to tree branche (per tree) Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines. |
39 | Line Work (AB Cable) |
40 | Dismentalling of Aerial Bunched Cable from L.T. O/H (damage) line. |
41 | Loading, carriage and unloading of Aerial Bunched Cable from store to work site and vice versa. |
42 | Laying of Aerial Bunched Cable for Erection of L.T. O/H Line. |
43 | Taking out cable from drum. |
44 | Mounting & Erection of single phase distribution box. |
45 | Mounting & Erection of three phase distribution box. |
46 | Opening and reconnection of consumer connections for shifted/replaced of pole. |
47 | H.T. / L.T. Cable Work |
48 | Taking out new/old cable from cable drum and then after transportation from store to work site or vice-versa. |
49 | (a) H.T. Cable |
50 | (b) L.T. Cable |
51 | Digging of cable trench in size of 30 cm wide and 60 to 90 Cm meter deep as per site requirement for laying of cable- |
52 | (a) Normal Soil |
53 | (b) Kharanja Road |
54 | (c)Metallic Road |
55 | Laying of cable in the abovedigging, trench, covering with bricks, sand and back filling. |
56 | (a) H.T. Cable |
57 | (b) L.T. Cable |
58 | Laying of H. T. cable through Hume/C.I./MS. pipe in digged trench and back filling. |
59 | (a) H.T. Cable |
60 | (b) L.T. Cable |
61 | Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles. |
62 | (a) H.T. Cable |
63 | (b) L.T. Cable |
64 | Restoration of Metallic/RCC road after proper repairing with appropriate materials. |
65 | Making of cable box for 11/6.6 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.) |
66 | Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line : |
67 | a) Single Core L.T. Cable |
68 | b) 3 ½ Core L.T. Cable |
69 | c) 11 KV H.T. Cable |
70 | H.T. /L.T. P.B. & H.T./L.T. M.C. Work |
71 | Loading, Carriage and unloading of H.T.P.B. form store to work site and then after erection on the relay constructed plinth. |
72 | Loading, carriage and unloading of H.T.M.C. from store to site or vice-versa. |
73 | Erection of H.T. metering cubical on plinth as per standard norms. |
74 | Construction of plinth for H.T. pilffer metering cubical. |
75 | Dismentalling of H.T. pilffer metering cubical. |
76 | Erection of L.T. metering cubical as per standard norms and connection of L.T. Cable including crimping of Lugs etc. |
77 | Earthing of supports/ metering cubical/ HTPB etc. as per standard specifications. |
78 | Out Door Metering Unit Work |
79 | Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa. |
80 | Erection of O/D type Metering unit on D/P Structure. |
81 | Connection of H.T. Jumper to HT Bushing of O/D type Metering unit. |
82 | Distribution T/F work |
83 | Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth. |
84 | Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa. |
85 | Erection of Distribution T/F on plinth/D/pole structure. |
86 | Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer. |
87 | Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B. |
88 | Connection of L.T. cable from L.T.D.B to L.T.O.H. |
89 | To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust. |
90 | Reparing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust. |
91 | Supply of 40mm dia Class "B" G.I. Pipe 40" long including M.S. flat 50x6 mm along with all related materials required for distribution T/F earthing work and Boring 39" deep & connection of neutral bushing with G.I. Pipe through M.S. flat/earth wire with proper connection arrangement. |
92 | Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth. |
93 | Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion. |
94 | Capacity of Transformers(100KVA-250KVA) |
95 | Routine Checking of Distribution T/F as per Annexure"A" |
96 | Removal & Rerfitting of H.T., L.T. & Top Cover with Draining & Refilling of Oil |
97 | Attending Oil Leakage by replacement of Gasket, Packing & O-ring etc. |
98 | Replacement of HV Bushing/Bushing Rod. |
99 | Replacement of LV Bushing/Bushing Rod. |
100 | Repairing & Dressing of damaged LT cable by cutting & lugging etc. |
101 | Capacity of Transformers(400KVA-630KVA) |
102 | Routine Checking of Distribution T/F as per Annexure"A" |
103 | Removal & Rerfitting of H.T., L.T. & Top Cover with Draining & Refilling of Oil |
104 | Attending Oil Leakage by replacement of Gasket, Packing & O-ring etc. |
105 | Replacement of HV Bushing/Bushing Rod. |
106 | Replacement of LV Bushing/Bushing Rod. |
107 | Repairing & Dressing of damaged LT cable by cutting & lugging etc. |
108 | Cleaning of surrounding of Distribution Transformer |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail