| 1 | H.T 11,KV In comerpanel General Checking & lubricating and greasing the Mechanism Servicing and testing With Report |
| 2 | H.T 11,KV Outgoingpanel General Checking & lubricating and greasing the Mechanism Servicing and testing With Report |
| 3 | Supply of Battery Charger and New Battery |
| 4 | All LT Main Panel General CheckingAir Dust Cleaning bus-bar Nut & BoltTitaningWith All Supervision |
| 5 | L.T ACB Make L&T General Checking & lubricating and greasing the mechanism Servicing and Testing |
| 6 | Contactor Panel General Checking Servicing |
| 7 | OilDe-hydration ,filtration 1250 KVA Transformer BDV test Before & After De-Hydration with test Report all Supervision Labour works |
| 8 | Transformer 1250,kva General CheckingLeakage Repairing and Gasket change |
| 9 | Transformer OLTC Tanks OilDe-hydration ,filtration Transformer BDV testBefore & After De-Hydration with Moving contact & General checkingall Supervision Labourworks |
| 10 | 11,kv,Transformer Physical Checking Testing Scope (InsulationResistance Test, Magnetic Core Balance ,Ratio Test ,Winding Resistance Test, Vector Group Test, Protection Relays Function Test OIL Temperature, WindingTemperature, ) with test Report1250,kva |
| 11 | Earthing Resistance Test |
| 12 | Supply & fixing Main L.T Panel General Checking Change of all Door Packing and Lock of. Per Bay |
| 13 | OLD SUB STATION 11 kVAH.T 11,KV In comerpanel General Checking & lubricating and greasing the Mechanism Servicing and testing With Report |
| 14 | H.T 11,KV Outgoingpanel General Checking & lubricating and greasing the Mechanism Servicing and testing With Report |
| 15 | All LT Main Panel General CheckingAir Dust Cleaning bus-bar Nut & Bolt TitaningWith All Supervision |
| 16 | L.T ACB Make L&T General Checking & lubricating and greasing themechanism Servicing and Testing |
| 17 | Contactor Panel Servicing |
| 18 | OilDe-hydration ,filtration 500 KVA Transformer BDV test Before & After De- Hydration with test Report all Supervision Labour works |
| 19 | 500 kVA Transformer General Checkingleakage repairing and gasket change |
| 20 | 11,kv,Transformer Physical Checking Testing Scope (InsulationResistance Test, Magnetic Core Balance ,Ratio Test ,Winding Resistance Test, VectorGroup Test, Protection Relays Function Test OIL Temperature, Winding Temperature, ) with test Report500,kva |
| 21 | Earthing resistance Test With Test Report |
| 22 | Supply & fixing Main L.T Panel General Checking Change of all Door Packingand Lock of. Per Bay |
| 23 | IDMT relay testing |
| 24 | OilDe-hydration ,filtration 300 KVA Transformer BDV test Before & After De- Hydration with test Report all Supervision Labour works |
| 25 | 300 kva Transformer General Checking leakage repairing and gasket change |
| 26 | 11,kv,Transformer Physical Checking Testing Scope (InsulationResistance Test, Magnetic Core Balance ,Ratio Test ,Winding Resistance Test, Vector Group Test, Protection Relays Function Test OIL Temperature, WindingTemperature, ) with test Report300,kva |
| 27 | Extra modification of 400 Amp MCB with Bus bar |
| 28 | Supply & Fixing RYB indication lamp |
| 29 | Supply & Fixing Change of HT rubber mat |
| 30 | Supply & Fixing Change of LT rubber mat |
| 31 | Main tank to DG set pipe change |
| 32 | All capacitor panel of 25 KVR |
| 33 | Providing testing & connection of temporary alternative arrangement power supply to essential service department at hospital by 125 KVA DG Set including diesel |