Maintenance Of Substation Equipments Inclusing Dehydration Of Transformers, Testing And Servicing Of Lt Panel And Ht Panel At Substation Under Moei At Ihbas During The Year 2022 23.- 1 H.T 11, Kv In Comerpanel General Checking & Lubricating And Greasing The Mechanism Servicing And Testing With Report 2 H.T 11, Kv Outgoingpanel General Checking & Lubricating And Greasing The Mechanism Servicing And Testing With Report 3 Supply Of Battery Charger And New Battery 4 All Lt Main Panel General Checkingair Dust Cleaning Bus-Bar Nut & Bolttitaningwith All Supervision 5 L.T Acb Make L&T General Checking & Lubricating And Greasing The Mechanism Servicing And Testing 6 Contactor Panel General Checking Servicing 7 Oilde-Hydration , Filtration 1250 Kva Transformer Bdv Test Before & After De-Hydration With Test Report All Supervision Labour Works 8 Transformer 1250, Kva General Checkingleakage Repairing And Gasket Change 9 Transformer Oltc Tanks Oilde-Hydration , Filtration Transformer Bdv Testbefore & After De-Hydration With Moving Contact & General Checkingall Supervision Labourworks 10 11, Kv, Transformer Physical Checking Testing Scope ( Insulationresistance Test, Magnetic Core Balance , Ratio Test , Winding Resistance Test, Vector Group Test, Protection Relays Function Test Oil Temperature, Windingtemperature, ) With Test Report1250, Kva 11 Earthing Resistance Test 12 Supply & Fixing Main L.T Panel General Checking Change Of All Door Packing And Lock Of. Per Bay 13 Old Sub Station 11 Kvah.T 11, Kv In Comerpanel General Checking & Lubricating And Greasing The Mechanism Servicing And Testing With Report 14 H.T 11, Kv Outgoingpanel General Checking & Lubricating And Greasing The Mechanism Servicing And Testing With Report 15 All Lt Main Panel General Checkingair Dust Cleaning Bus-Bar Nut & Bolt Titaningwith All Supervision 16 L.T Acb Make L&T General Checking & Lubricating And Greasing Themechanism Servicing And Testing 17 Contactor Panel Servicing 18 Oilde-Hydration , Filtration 500 Kva Transformer Bdv Test Before & After De- Hydration With Test Report All Supervision Labour Works 19 500 Kva Transformer General Checkingleakage Repairing And Gasket Change 20 11, Kv, Transformer Physical Checking Testing Scope ( Insulationresistance Test, Magnetic Core Balance , Ratio Test , Winding Resistance Test, Vectorgroup Test, Protection Relays Function Test Oil Temperature, Winding Temperature, ) With Test Report500, Kva 21 Earthing Resistance Test With Test Report 22 Supply & Fixing Main L.T Panel General Checking Change Of All Door Packingand Lock Of. Per Bay 23 Idmt Relay Testing 24 Oilde-Hydration , Filtration 300 Kva Transformer Bdv Test Before & After De- Hydration With Test Report All Supervision Labour Works 25 300 Kva Transformer General Checking Leakage Repairing And Gasket Change 26 11, Kv, Transformer Physical Checking Testing Scope ( Insulationresistance Test, Magnetic Core Balance , Ratio Test , Winding Resistance Test, Vector Group Test, Protection Relays Function Test Oil Temperature, Windingtemperature, ) With Test Report300, Kva 27 Extra Modification Of 400 Amp Mcb With Bus Bar 28 Supply & Fixing Ryb Indication Lamp 29 Supply & Fixing Change Of Ht Rubber Mat 30 Supply & Fixing Change Of Lt Rubber Mat 31 Main Tank To Dg Set Pipe Change 32 All Capacitor Panel Of 25 Kvr 33 Providing Testing & Connection Of Temporary Alternative Arrangement Power Supply To Essential Service Department At Hospital By 125 Kva Dg Set Including Diesel