| 1 | S & FLED high bay light fitting 120 watt with housing IP-65 and IK 07, circular high pressure die cast aluminium housing and manufacture logo embossed on the housing amd high transmittance tempered glass cover, optic lens plate having NB and WB optics, system efficacy >120 lumens / watt, xitanium driver - IP66 complying to IEC 61347-2-13 certification like CE ENEC, ROHS, with rated life of 50000 hrs for driver at TC- 800 C along with all safety features, thermal protection, protection against input over voltage < 320 volt AC for 48 hrs, driver failure rate 0.2% per 1 Khr @ TC 70-800 C , wattage 120 watt, internal wiring - teflon SDCM < 5, CCT-5700,CRI > 80, THD < 20 at max load, third harmonics < 20%, PF > .95 colour temperature 6500Kincluding taking down existing old MH light fittingscomplete all as specified and as directed. |
| 2 | Sub main wiring with 2 runs of 2.5 sqmm, single core, FRLS PVC insulated, unsheathed, 1100 volts grade, multi stranded with copper conductor, drawn through existing ERW steel conduit and one run ofFRLS PVC insulated 2.5 sqmm copper conductor for earth continuity including taking down existing submain wiring complete all as specified and as directed. Note : 2 runs of 2.5sqmm single core copper conductor, 1 run of 2.5 sqmm copper conductor earth wire will be measured as one unit and if any welding work is required at site,is deemed to be included in the quoted rate. |
| 3 | Sub main wiring with 2 runs of 4.0 sqmm, single core, FRLS PVC insulated, unsheathed, 1100 volts grade, multi stranded with copper conductor, drawn through existing ERW steel conduit and one run ofFRLS PVC insulated 4.0 sqmm copper conductor for earth continuity including taking down existing submain wiring complete all as specified and as directed. Note : 2 runs of 4.0 sqmm single core copper conductor, 1 run of 4.0 sqmm copper conductor earth wire will be measured as one unit and if any welding work is required at site,is deemed to be included in the quoted rate. |
| 4 | Sub main wiring with 4 runs of 6.0 sqmm, single core, FRLS PVC insulated, unsheathed, 1100 volts grade, multi stranded with copper conductor, drawn through existing ERW steel conduit and two runs ofFRLS PVC insulated 6.0 sqmm copper conductor for earth continuity including taking down existing submain wiring complete all as specified and as directed. Note : 4 runs of 6.0 sqmm single core copper conductor, 2 runs of 6.0 sqmm copper conductor earth wire will be measured as one unit and if any welding work is required at site,is deemed to be included in the quoted rate. |
| 5 | Sub main wiring with 4 runs of 10.0 sqmm, single core, FRLS PVC insulated, unsheathed, 1100 volts grade, multi stranded with copper conductor, drawn through existing ERW steel conduit and two runs ofFRLS PVC insulated 10.0 sqmm copper conductor for earth continuity including taking down existing submain wiring complete all as specified and as directed. Note : 4 runs of 10.0 sqmm single core copper conductor, 2 runs of 10.0 sqmm copper conductor earth wire will be measured as one unit and if any welding work is required at site,is deemed to be included in the quoted rate. |
| 6 | S & F in replacement of MCB DB TPN 4 way with 200 amps copper rated bus bar with mild steel sheet enclosure, vertical, double door suitable for fixing MCB\"s including connecting complete all as specified and as directed. |
| 7 | S & F in replacement of MCB DB TPN 8 way with 200 amps copper rated bus bar with mild steel sheet enclosure, vertical, double door suitable for fixing MCB\"s including connecting complete all as specified and as directed. |
| 8 | S & F in replacement of MCB DB SPN 4 way with 200 amps copper rated bus bar with mild steel sheet enclosure,double door suitable for fixing MCB\"s including connecting complete all as specified and as directed. |
| 9 | S & F in replacement of MCB SP 6 to 32 Amp complete all as specified and as directed. |
| 10 | S & F in replacement of MCB SPN 32 Amp complete all as specified and as directed. |
| 11 | S & F in replacement of MCB SPN 63 Amp complete all as specified and as directed. |
| 12 | S & F in replacement of MCB TPN 32 Amp complete all as specified and as directed. |
| 13 | S & F in replacement of MCB TPN 63 Amp complete all as specified and as directed. |