Tender For Construction Of Rcc Protection Wall At The Earth Slipped Area In 14 Bend At Chainage 5 Km To A Length A 17M And Height Along The Road Leading From Kadamparai Arch To Kadamparai Dam At Upper Aliyar Camp In Kadamparai Generation Circle
Tender Overview
Project Description
Construction Of Rcc Protection Wall At The Earth Slipped Area In 14 Bend At Chainage 5 Km To A Length A 17M And Height Along The Road Leading From Kadamparai Arch To Kadamparai Dam At Upper Aliyar Camp In Kadamparai Generation Circle
BOQ
| Sl. No. | Item Description |
| 1 | RCC Retaining wall at Sarkarpathy PH |
| 2 | Clearing and removal of slipped earth boulders away from the site including cost of all materials lead, lift and labour charges etc complete |
| 3 | A. Earth work excavation and depositing on back with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20.B. Including cost of all materials, lead, lift, labour charges, etc., complete |
| 4 | B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting.. Including cost of all materials, lead, lift, labour charges, etc., complete. |
| 5 | C. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting. Including cost of all materials, lead, lift, labour charges, etc., complete. |
| 6 | Drilling holes of 32 mm dia – 0.90 m deep inHard granite surface, fabrication and fixing 20 mm dia RTS grip rods inside the drill holes for Anchor rods and above ground level of total length of(0.90+0.90)=1.80m in all length grouting the same with cement slury or resin capsules at 750mm spacing including cost of all materials, lead, lift, labour charges etc complete., as directed by Engineer in charge drawing and specification. |
| 7 | Filling the foundation with M sand with watering proper consolidation including cost of allmaterials, lead, lift, labour charges etc., complete |
| 8 | Providing and laying PCC 1:3:6 mix using 40mm HBG metalcost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge |
| 9 | Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metalcost of all materials, lead, lift, curing, labour charges etc., complete. A.Base Slab |
| 10 | Providing and laying RCC 1:2:4 mix using 12-20 mm HBG metalcost of all materials, lead, lift, curing, labour charges etc., complete. B.Stem(Wall) |
| 11 | Supplying and laying in position of RTS/TMT rods for reinforcement including transporting, cutting charges, bending, tying including cost of all materials, lead, lift, labour charges etc complete |
| 12 | Supplying and fixing 110m dia PVC pipe for weep hole including cost of cutting and fixing in RCC wall, cost of all materials, labour, lead, lift etc., complete |
| 13 | Back filling withearth and rubble including cost of consoildation by watering by layer by layer including cost of all materials, labour, lead, lift etc., complete( All Items for the above basic price is inclusive of EPF and ESI) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents