Tender For Balance Work Of Construction Of 100 Beded Girls Hostel At K.G.B.V. Campus Gatauna Block Haidergarh, District-Barabanki
Tender Value
38.97 Lakhs
Estimated cost
Bid Submission
18 Oct 2022
0 days left
EMD
78000
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
haidergarh → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Balance Work Of Construction Of 100 Beded Girls Hostel At K.G.B.V. Campus Gatauna Block Haidergarh, District-Barabanki B
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in exacavation in foundations in ordinary soil (loam clay or sand) including lift upto 1.5 m and lead upto 30 mt. & including filling, watering and ramming of excavated earth into the trenches or into the space between building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 30 mt. from the foundation trenches. |
| 2 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone ballast 40 mm nominal size) and curing complete, including cost of form- work, in foundation.without cement |
| 3 | P/L Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. |
| 4 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. |
| 5 | P/L R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. |
| 6 | P/L R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in Slab of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20. |
| 7 | P/L R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lighterbeams of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20 |
| 8 | P/L R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in Column of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour, tools and plants etc. required for proper completion of the works. strength of the concrete shall not beless than M-20 |
| 9 | First class brick work in 1:6 cement and coarse sand of 2.25 fineness modulus) mortar infoundation & plinth including supply of all materials, labour, T & P etc reqiored for proper completion of the work. |
| 10 | First class brick work in 1:6 cement and coarse sand of 2.25 fineness modulus) mortar insuper-structure above plinth level up to floor two level includingnecessarycutting and moulding of brick work asrequiredand also including honeycombed brick work in thickness of wall more than 12cms. |
| 11 | First Floor |
| 12 | Second Floor |
| 13 | First class brick work in 1:4 cement and coarse sand of 2.25 fineness modulus) mortar insuper-structure above plinth level up to floor two level includingnecessarycutting and moulding of brick work asrequiredand also including honeycombed brick work in thickness of wall more than 12 cms. |
| 14 | First Floor |
| 15 | Second Floor |
| 16 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. |
| 17 | Laying of Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. |
| 18 | 12 mm cement plaster in single coat on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 course sand . |
| 19 | 15 mm thick plaster in 1:3 (cement & coarse sand) in plinth.without cement |
| 20 | Making grooves 10 to 12mm wide x 8mm deep in plaster of the walls or in ceiling vertically or horizontally as required. |
| 21 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. |
| 22 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. |
| 23 | S/F of hexagonal fan box with hexagonal side of approx. 80 mm.in lengthfabricatedfrom 16 SWG M.S. sheet incorporating with10 mm. dia. M.S. round bar duly bent for supporting fan hanger duly painted with redoxideand screwingarrangement |
| 24 | Providing&layingoflight cinder filling under floor of toilets and other sunken roofs. |
| 25 | Providing fixing GI pipe coplete with GI fittings and clamps including cutting and making good the walls etc (intenal work) Concealed pipe including painting with anti corrosive bitumastic paint cutting chase and making good the well. |
| 26 | 15 mm dia nominal bore |
| 27 | 20 mm dia nominal bore |
| 28 | Filling of Carted earth |
| 29 | GST Extra as applicable |
AI Tender Summary
Tender Timeline
Oct 13, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedOct 18, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 18, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender