Housing Urban and Rular Development Government Departments Closing in 0 days TDR #34371218

Tender For Fdr For The Year 2022-23 (Permanent Restoration Of Pavement, Construction Of Brw Wallst04 Totebrongpara,Chilpara To Lower Bolmedam Etc

Issued by Government Departments · North Garo Hills, Meghalaya
Tender Value
79.76 Lakhs
Estimated cost
Bid Submission
21 Oct 2022
0 days left
EMD
1.59 Lakhs
Bank guarantee accepted
Document Fee
800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
North Garo Hills → Meghalaya
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Fdr For The Year 2022-23 ( Permanent Restoration Of Pavement, Construction Of Brw Wallst04 Totebrongpara, Chilpara To Lower Bolmedam Etc- 1 Construction Of Breast / Retaing Wall ( Height=3.00M / 4.00M / 5.00M ) 2 Eartwork In Excavation Etc 3 T04 Totebrongpara ( L=3.75Km ) 4 Chilpara To Lower Bolmedam ( L=1.25Km ) 5 T04 To Tengasot ( L=1.77Km ) 6 Menadobato Mancheng ( L=2.38Km ) 7 Agropatal To Nengbak Wapil ( L=4.79Km ) 8 Chima Aga To Arai Apal ( L=3.84Km ) 9 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 10 T04 To Chilpara Reserve ( L=3.18Km ) 11 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 12 Bhagabatta Baksalpara Road ( L=3.00Km ) 13 Kharkutta Wageasi Road ( L=15.00Km ) 14 Construction Of Breast / Retaing Wall ( Height=3.00M / 4.00M / 5.00M ) 15 Sm In 1:5 16 T04 Totebrongpara ( L=3.75Km ) 17 Chilpara To Lower Bolmedam ( L=1.25Km ) 18 T04 To Tengasot ( L=1.77Km ) 19 Menadobato Mancheng ( L=2.38Km ) 20 Agropatal To Nengbak Wapil ( L=4.79Km ) 21 Chima Aga To Arai Apal ( L=3.84Km ) 22 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 23 T04 To Chilpara Reserve ( L=3.18Km ) 24 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 25 Bhagabatta Baksalpara Road ( L=3.00Km ) 26 Kharkutta Wageasi Road ( L=15.00Km ) 27 Filter Media Behind Retaing / Breast Wall Etc 28 T04 Totebrongpara ( L=3.75Km ) 29 Chilpara To Lower Bolmedam ( L=1.25Km ) 30 T04 To Tengasot ( L=1.77Km ) 31 Menadobato Mancheng ( L=2.38Km ) 32 Agropatal To Nengbak Wapil ( L=4.79Km ) 33 Chima Aga To Arai Apal ( L=3.84Km ) 34 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 35 T04 To Chilpara Reserve ( L=3.18Km ) 36 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 37 Bhagabatta Baksalpara Road ( L=3.00Km ) 38 Kharkutta Wageasi Road ( L=15.00Km ) 39 Metalling & Black Topping ( Width=3.00M / 3.75M ) 40 Construction Of Granular Sub-Base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Etc. 41 T04 Totebrongpara ( L=3.75Km ) 42 Chilpara To Lower Bolmedam ( L=1.25Km ) 43 T04 To Tengasot ( L=1.77Km ) 44 Menadobato Mancheng ( L=2.38Km ) 45 Agropatal To Nengbak Wapil ( L=4.79Km ) 46 Chima Aga To Arai Apal ( L=3.84Km ) 47 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 48 T04 To Chilpara Reserve ( L=3.18Km ) 49 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 50 Bhagabatta Baksalpara Road ( L=3.00Km ) 51 Kharkutta Wageasi Road ( L=15.00Km ) 52 Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes To Water Bound Macadam Specification Including Spreading In Uniform Thickness, Etc. 53 Wbm Grade-Ii 54 T04 Totebrongpara ( L=3.75Km ) 55 Chilpara To Lower Bolmedam ( L=1.25Km ) 56 T04 To Tengasot ( L=1.77Km ) 57 Menadobato Mancheng ( L=2.38Km ) 58 Agropatal To Nengbak Wapil ( L=4.79Km ) 59 Chima Aga To Arai Apal ( L=3.84Km ) 60 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 61 T04 To Chilpara Reserve ( L=3.18Km ) 62 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 63 Bhagabatta Baksalpara Road ( L=3.00Km ) 64 Kharkutta Wageasi Road ( L=15.00Km ) 65 Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes To Water Bound Macadam Specification Including Spreading In Uniform Thickness, Etc. 66 Wbm Grade-Iii 67 T04 Totebrongpara ( L=3.75Km ) 68 Chilpara To Lower Bolmedam ( L=1.25Km ) 69 T04 To Tengasot ( L=1.77Km ) 70 Menadobato Mancheng ( L=2.38Km ) 71 Agropatal To Nengbak Wapil ( L=4.79Km ) 72 Chima Aga To Arai Apal ( L=3.84Km ) 73 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 74 T04 To Chilpara Reserve ( L=3.18Km ) 75 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 76 Bhagabatta Baksalpara Road ( L=3.00Km ) 77 Kharkutta Wageasi Road ( L=15.00Km ) 78 Providing And Applying Tack Coat With Bitumen Emulsionusing Emulsion Distributor At The Rate Of 0.20 To 0.25 Kgper Sqm On The Prepared Bituminous Surface Cleanedwith Hydraulic Broom As Per Technical Specificationclause 503 79 T04 Totebrongpara ( L=3.75Km ) 80 Chilpara To Lower Bolmedam ( L=1.25Km ) 81 T04 To Tengasot ( L=1.77Km ) 82 Menadobato Mancheng ( L=2.38Km ) 83 Agropatal To Nengbak Wapil ( L=4.79Km ) 84 Chima Aga To Arai Apal ( L=3.84Km ) 85 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 86 T04 To Chilpara Reserve ( L=3.18Km ) 87 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 88 Bhagabatta Baksalpara Road ( L=3.00Km ) 89 Kharkutta Wageasi Road ( L=15.00Km ) 90 Providing, Laying And Rolling Of Open-Graded Premixcarpet Of 20 Mm Thickness Composed Of 13.2 Mm To 5.6Mm Aggregates Either Using Penetration Grade Bitumenor Emulsion To Required Line, Grade And Level To Serve Aswearing Course On A Previously Prepared Base, Including Mixing In A Suitable Plant, Laying And Rolling With A Threewheel 80-100 Kn Static Rollar Capacity, Finished To Requirlevel And Grades To Be Followed By Seal Coat Of Eithertype A Or Type B Or Type C As Per Technicalspecification Clause 508. 91 T04 Totebrongpara ( L=3.75Km ) 92 Chilpara To Lower Bolmedam ( L=1.25Km ) 93 T04 To Tengasot ( L=1.77Km ) 94 Menadobato Mancheng ( L=2.38Km ) 95 Agropatal To Nengbak Wapil ( L=4.79Km ) 96 Chima Aga To Arai Apal ( L=3.84Km ) 97 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 98 T04 To Chilpara Reserve ( L=3.18Km ) 99 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 100 Bhagabatta Baksalpara Road ( L=3.00Km ) 101 Kharkutta Wageasi Road ( L=15.00Km ) 102 Providing And Laying Seal Coat Sealing The Voids In Abituminous Surface Laid To The Specified Levels, Grade Andcross Fall Using Type A, Type B And Type C As Pertechnical Specification Clause 510 103 T04 Totebrongpara ( L=3.75Km ) 104 Chilpara To Lower Bolmedam ( L=1.25Km ) 105 T04 To Tengasot ( L=1.77Km ) 106 Menadobato Mancheng ( L=2.38Km ) 107 Agropatal To Nengbak Wapil ( L=4.79Km ) 108 Chima Aga To Arai Apal ( L=3.84Km ) 109 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 110 T04 To Chilpara Reserve ( L=3.18Km ) 111 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 112 Bhagabatta Baksalpara Road ( L=3.00Km ) 113 Kharkutta Wageasi Road ( L=15.00Km )

BOQ

Name of Work: FDR (NC) for the year 2022-23 [Permanent restoration of pavement/Construction of Wing/Retaining/Breast walls etc]
Sl. No. Item Description
1Construction of breast/retaing wall (Height=3.00m/4.00m/5.00m)
2Eartwork in excavation etc
3T04 toTebrongpara (L=3.75km)
4Chilpara to Lower Bolmedam (L=1.25km)
5T04 to Tengasot (L=1.77km)
6Menadobato Mancheng (L=2.38km)
7Agropatal to Nengbak wapil (L=4.79km)
8Chima Aga to Arai Apal (L=3.84km)
9Upper Bolmedam to Rongmatchu (L=4.64km)
10T04 to Chilpara Reserve (L=3.18km)
11L039-Dangkong Rabha to Imbanggi (L=2.36km)
12Bhagabatta Baksalpara Road (L=3.00km)
13Kharkutta Wageasi Road (L=15.00km)
14Construction of breast/retaing wall (Height=3.00m/4.00m/5.00m)
15SM in 1:5
16T04 toTebrongpara (L=3.75km)
17Chilpara to Lower Bolmedam (L=1.25km)
18T04 to Tengasot (L=1.77km)
19Menadobato Mancheng (L=2.38km)
20Agropatal to Nengbak wapil (L=4.79km)
21Chima Aga to Arai Apal (L=3.84km)
22Upper Bolmedam to Rongmatchu (L=4.64km)
23T04 to Chilpara Reserve (L=3.18km)
24L039-Dangkong Rabha to Imbanggi (L=2.36km)
25Bhagabatta Baksalpara Road (L=3.00km)
26Kharkutta Wageasi Road (L=15.00km)
27Filter media behind retaing/breast wall etc
28T04 toTebrongpara (L=3.75km)
29Chilpara to Lower Bolmedam (L=1.25km)
30T04 to Tengasot (L=1.77km)
31Menadobato Mancheng (L=2.38km)
32Agropatal to Nengbak wapil (L=4.79km)
33Chima Aga to Arai Apal (L=3.84km)
34Upper Bolmedam to Rongmatchu (L=4.64km)
35T04 to Chilpara Reserve (L=3.18km)
36L039-Dangkong Rabha to Imbanggi (L=2.36km)
37Bhagabatta Baksalpara Road (L=3.00km)
38Kharkutta Wageasi Road (L=15.00km)
39Metalling & Black topping (Width=3.00m/3.75m)
40Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, etc.
41T04 toTebrongpara (L=3.75km)
42Chilpara to Lower Bolmedam (L=1.25km)
43T04 to Tengasot (L=1.77km)
44Menadobato Mancheng (L=2.38km)
45Agropatal to Nengbak wapil (L=4.79km)
46Chima Aga to Arai Apal (L=3.84km)
47Upper Bolmedam to Rongmatchu (L=4.64km)
48T04 to Chilpara Reserve (L=3.18km)
49L039-Dangkong Rabha to Imbanggi (L=2.36km)
50Bhagabatta Baksalpara Road (L=3.00km)
51Kharkutta Wageasi Road (L=15.00km)
52Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,etc.
53WBM Grade-II
54T04 toTebrongpara (L=3.75km)
55Chilpara to Lower Bolmedam (L=1.25km)
56T04 to Tengasot (L=1.77km)
57Menadobato Mancheng (L=2.38km)
58Agropatal to Nengbak wapil (L=4.79km)
59Chima Aga to Arai Apal (L=3.84km)
60Upper Bolmedam to Rongmatchu (L=4.64km)
61T04 to Chilpara Reserve (L=3.18km)
62L039-Dangkong Rabha to Imbanggi (L=2.36km)
63Bhagabatta Baksalpara Road (L=3.00km)
64Kharkutta Wageasi Road (L=15.00km)
65Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,etc.
66WBM Grade-III
67T04 toTebrongpara (L=3.75km)
68Chilpara to Lower Bolmedam (L=1.25km)
69T04 to Tengasot (L=1.77km)
70Menadobato Mancheng (L=2.38km)
71Agropatal to Nengbak wapil (L=4.79km)
72Chima Aga to Arai Apal (L=3.84km)
73Upper Bolmedam to Rongmatchu (L=4.64km)
74T04 to Chilpara Reserve (L=3.18km)
75L039-Dangkong Rabha to Imbanggi (L=2.36km)
76Bhagabatta Baksalpara Road (L=3.00km)
77Kharkutta Wageasi Road (L=15.00km)
78Providing and applying tack coat with Bitumen emulsionusing emulsion distributor at the rate of 0.20 to 0.25 kgper sqm on the prepared bituminous surface cleanedwith Hydraulic broom as per Technical SpecificationClause 503
79T04 toTebrongpara (L=3.75km)
80Chilpara to Lower Bolmedam (L=1.25km)
81T04 to Tengasot (L=1.77km)
82Menadobato Mancheng (L=2.38km)
83Agropatal to Nengbak wapil (L=4.79km)
84Chima Aga to Arai Apal (L=3.84km)
85Upper Bolmedam to Rongmatchu (L=4.64km)
86T04 to Chilpara Reserve (L=3.18km)
87L039-Dangkong Rabha to Imbanggi (L=2.36km)
88Bhagabatta Baksalpara Road (L=3.00km)
89Kharkutta Wageasi Road (L=15.00km)
90Providing, laying and rolling of open-graded premixcarpet of 20 mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumenor emulsion to required line, grade and level to serve aswearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a threewheel 80-100 kN static rollar capacity, finished to requirlevel and grades to be followed by seal coat of eitherType A or Type B or Type C as per TechnicalSpecification Clause 508.
91T04 toTebrongpara (L=3.75km)
92Chilpara to Lower Bolmedam (L=1.25km)
93T04 to Tengasot (L=1.77km)
94Menadobato Mancheng (L=2.38km)
95Agropatal to Nengbak wapil (L=4.79km)
96Chima Aga to Arai Apal (L=3.84km)
97Upper Bolmedam to Rongmatchu (L=4.64km)
98T04 to Chilpara Reserve (L=3.18km)
99L039-Dangkong Rabha to Imbanggi (L=2.36km)
100Bhagabatta Baksalpara Road (L=3.00km)
101Kharkutta Wageasi Road (L=15.00km)
102Providing and laying seal coat sealing the voids in abituminous surface laid to the specified levels, grade andcross fall using Type A, Type B and Type C as perTechnical Specification Clause 510
103T04 toTebrongpara (L=3.75km)
104Chilpara to Lower Bolmedam (L=1.25km)
105T04 to Tengasot (L=1.77km)
106Menadobato Mancheng (L=2.38km)
107Agropatal to Nengbak wapil (L=4.79km)
108Chima Aga to Arai Apal (L=3.84km)
109Upper Bolmedam to Rongmatchu (L=4.64km)
110T04 to Chilpara Reserve (L=3.18km)
111L039-Dangkong Rabha to Imbanggi (L=2.36km)
112Bhagabatta Baksalpara Road (L=3.00km)
113Kharkutta Wageasi Road (L=15.00km)

AI Tender Summary

OUR REF NO 34371218
AUTHORITY Government Departments
TENDER VALUE 79.76 Lakhs
LAST DATE 21-10-2022
Authority
Authority Name Meghalaya Infrastructure Development Finance Corporation Ltd
Work Description Fdr For The Year 2022-23 ( Permanent Restoration Of Pavement, Construction Of Brw Wallst04 Totebrongpara, Chilpara To Lower Bolmedam Etc- 1 Construction Of Breast / Retaing Wall ( Height=3.00M / 4.00M / 5.00M ) 2 Eartwork In Excavation Etc 3 T04 Totebrongpara ( L=3.75Km ) 4 Chilpara To Lower Bolmedam ( L=1.25Km ) 5 T04 To Tengasot ( L=1.77Km ) 6 Menadobato Mancheng ( L=2.38Km ) 7 Agropatal To Nengbak Wapil ( L=4.79Km ) 8 Chima Aga To Arai Apal ( L=3.84Km ) 9 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 10 T04 To Chilpara Reserve ( L=3.18Km ) 11 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 12 Bhagabatta Baksalpara Road ( L=3.00Km ) 13 Kharkutta Wageasi Road ( L=15.00Km ) 14 Construction Of Breast / Retaing Wall ( Height=3.00M / 4.00M / 5.00M ) 15 Sm In 1:5 16 T04 Totebrongpara ( L=3.75Km ) 17 Chilpara To Lower Bolmedam ( L=1.25Km ) 18 T04 To Tengasot ( L=1.77Km ) 19 Menadobato Mancheng ( L=2.38Km ) 20 Agropatal To Nengbak Wapil ( L=4.79Km ) 21 Chima Aga To Arai Apal ( L=3.84Km ) 22 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 23 T04 To Chilpara Reserve ( L=3.18Km ) 24 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 25 Bhagabatta Baksalpara Road ( L=3.00Km ) 26 Kharkutta Wageasi Road ( L=15.00Km ) 27 Filter Media Behind Retaing / Breast Wall Etc 28 T04 Totebrongpara ( L=3.75Km ) 29 Chilpara To Lower Bolmedam ( L=1.25Km ) 30 T04 To Tengasot ( L=1.77Km ) 31 Menadobato Mancheng ( L=2.38Km ) 32 Agropatal To Nengbak Wapil ( L=4.79Km ) 33 Chima Aga To Arai Apal ( L=3.84Km ) 34 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 35 T04 To Chilpara Reserve ( L=3.18Km ) 36 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 37 Bhagabatta Baksalpara Road ( L=3.00Km ) 38 Kharkutta Wageasi Road ( L=15.00Km ) 39 Metalling & Black Topping ( Width=3.00M / 3.75M ) 40 Construction Of Granular Sub-Base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Etc. 41 T04 Totebrongpara ( L=3.75Km ) 42 Chilpara To Lower Bolmedam ( L=1.25Km ) 43 T04 To Tengasot ( L=1.77Km ) 44 Menadobato Mancheng ( L=2.38Km ) 45 Agropatal To Nengbak Wapil ( L=4.79Km ) 46 Chima Aga To Arai Apal ( L=3.84Km ) 47 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 48 T04 To Chilpara Reserve ( L=3.18Km ) 49 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 50 Bhagabatta Baksalpara Road ( L=3.00Km ) 51 Kharkutta Wageasi Road ( L=15.00Km ) 52 Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes To Water Bound Macadam Specification Including Spreading In Uniform Thickness, Etc. 53 Wbm Grade-Ii 54 T04 Totebrongpara ( L=3.75Km ) 55 Chilpara To Lower Bolmedam ( L=1.25Km ) 56 T04 To Tengasot ( L=1.77Km ) 57 Menadobato Mancheng ( L=2.38Km ) 58 Agropatal To Nengbak Wapil ( L=4.79Km ) 59 Chima Aga To Arai Apal ( L=3.84Km ) 60 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 61 T04 To Chilpara Reserve ( L=3.18Km ) 62 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 63 Bhagabatta Baksalpara Road ( L=3.00Km ) 64 Kharkutta Wageasi Road ( L=15.00Km ) 65 Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes To Water Bound Macadam Specification Including Spreading In Uniform Thickness, Etc. 66 Wbm Grade-Iii 67 T04 Totebrongpara ( L=3.75Km ) 68 Chilpara To Lower Bolmedam ( L=1.25Km ) 69 T04 To Tengasot ( L=1.77Km ) 70 Menadobato Mancheng ( L=2.38Km ) 71 Agropatal To Nengbak Wapil ( L=4.79Km ) 72 Chima Aga To Arai Apal ( L=3.84Km ) 73 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 74 T04 To Chilpara Reserve ( L=3.18Km ) 75 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 76 Bhagabatta Baksalpara Road ( L=3.00Km ) 77 Kharkutta Wageasi Road ( L=15.00Km ) 78 Providing And Applying Tack Coat With Bitumen Emulsionusing Emulsion Distributor At The Rate Of 0.20 To 0.25 Kgper Sqm On The Prepared Bituminous Surface Cleanedwith Hydraulic Broom As Per Technical Specificationclause 503 79 T04 Totebrongpara ( L=3.75Km ) 80 Chilpara To Lower Bolmedam ( L=1.25Km ) 81 T04 To Tengasot ( L=1.77Km ) 82 Menadobato Mancheng ( L=2.38Km ) 83 Agropatal To Nengbak Wapil ( L=4.79Km ) 84 Chima Aga To Arai Apal ( L=3.84Km ) 85 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 86 T04 To Chilpara Reserve ( L=3.18Km ) 87 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 88 Bhagabatta Baksalpara Road ( L=3.00Km ) 89 Kharkutta Wageasi Road ( L=15.00Km ) 90 Providing, Laying And Rolling Of Open-Graded Premixcarpet Of 20 Mm Thickness Composed Of 13.2 Mm To 5.6Mm Aggregates Either Using Penetration Grade Bitumenor Emulsion To Required Line, Grade And Level To Serve Aswearing Course On A Previously Prepared Base, Including Mixing In A Suitable Plant, Laying And Rolling With A Threewheel 80-100 Kn Static Rollar Capacity, Finished To Requirlevel And Grades To Be Followed By Seal Coat Of Eithertype A Or Type B Or Type C As Per Technicalspecification Clause 508. 91 T04 Totebrongpara ( L=3.75Km ) 92 Chilpara To Lower Bolmedam ( L=1.25Km ) 93 T04 To Tengasot ( L=1.77Km ) 94 Menadobato Mancheng ( L=2.38Km ) 95 Agropatal To Nengbak Wapil ( L=4.79Km ) 96 Chima Aga To Arai Apal ( L=3.84Km ) 97 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 98 T04 To Chilpara Reserve ( L=3.18Km ) 99 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 100 Bhagabatta Baksalpara Road ( L=3.00Km ) 101 Kharkutta Wageasi Road ( L=15.00Km ) 102 Providing And Laying Seal Coat Sealing The Voids In Abituminous Surface Laid To The Specified Levels, Grade Andcross Fall Using Type A, Type B And Type C As Pertechnical Specification Clause 510 103 T04 Totebrongpara ( L=3.75Km ) 104 Chilpara To Lower Bolmedam ( L=1.25Km ) 105 T04 To Tengasot ( L=1.77Km ) 106 Menadobato Mancheng ( L=2.38Km ) 107 Agropatal To Nengbak Wapil ( L=4.79Km ) 108 Chima Aga To Arai Apal ( L=3.84Km ) 109 Upper Bolmedam To Rongmatchu ( L=4.64Km ) 110 T04 To Chilpara Reserve ( L=3.18Km ) 111 L039-Dangkong Rabha To Imbanggi ( L=2.36Km ) 112 Bhagabatta Baksalpara Road ( L=3.00Km ) 113 Kharkutta Wageasi Road ( L=15.00Km )
Basic Detail
Tender No RBD/CERC/ 11
Bidding Type Tender
Location
City North Garo Hills
State Meghalaya
Key Dates
Publish Date 14 Oct 2022
Submission Date 21 Oct 2022
Open Date 21 Oct 2022
Finance
Tender Value 79.76 Lakhs
Tender Fee 800
EMD 1.59 Lakhs
Exemption Not Available
Document List
cbba5273-b2cc-4dac-9a5f-28d23ed3f544.html
BOQ_1037.xls
LETTEROFBID.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 14, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 21, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 21, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

cbba5273-b2cc-4dac-9a5f-28d23ed3f544.html

xls

BOQ_1037.xls

pdf

LETTEROFBID.pdf

pdf

Tendernotice_1.pdf