Meghalaya Infrastructure Development Finance Corporation Ltd has published Tender For Fdr For The Year 2022-23 (Permanent Restoration Of Pavement, Construction Of Brw Wallst04 Totebrongpara,Chilpara To Lower Bolmedam Etc. Submission Date for this Tender is 21-10-2022. Road Work Tenders in North Garo Hills Meghalaya. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Construction of breast/retaing wall (Height=3.00m/4.00m/5.00m) |
2 | Eartwork in excavation etc |
3 | T04 toTebrongpara (L=3.75km) |
4 | Chilpara to Lower Bolmedam (L=1.25km) |
5 | T04 to Tengasot (L=1.77km) |
6 | Menadobato Mancheng (L=2.38km) |
7 | Agropatal to Nengbak wapil (L=4.79km) |
8 | Chima Aga to Arai Apal (L=3.84km) |
9 | Upper Bolmedam to Rongmatchu (L=4.64km) |
10 | T04 to Chilpara Reserve (L=3.18km) |
11 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
12 | Bhagabatta Baksalpara Road (L=3.00km) |
13 | Kharkutta Wageasi Road (L=15.00km) |
14 | Construction of breast/retaing wall (Height=3.00m/4.00m/5.00m) |
15 | SM in 1:5 |
16 | T04 toTebrongpara (L=3.75km) |
17 | Chilpara to Lower Bolmedam (L=1.25km) |
18 | T04 to Tengasot (L=1.77km) |
19 | Menadobato Mancheng (L=2.38km) |
20 | Agropatal to Nengbak wapil (L=4.79km) |
21 | Chima Aga to Arai Apal (L=3.84km) |
22 | Upper Bolmedam to Rongmatchu (L=4.64km) |
23 | T04 to Chilpara Reserve (L=3.18km) |
24 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
25 | Bhagabatta Baksalpara Road (L=3.00km) |
26 | Kharkutta Wageasi Road (L=15.00km) |
27 | Filter media behind retaing/breast wall etc |
28 | T04 toTebrongpara (L=3.75km) |
29 | Chilpara to Lower Bolmedam (L=1.25km) |
30 | T04 to Tengasot (L=1.77km) |
31 | Menadobato Mancheng (L=2.38km) |
32 | Agropatal to Nengbak wapil (L=4.79km) |
33 | Chima Aga to Arai Apal (L=3.84km) |
34 | Upper Bolmedam to Rongmatchu (L=4.64km) |
35 | T04 to Chilpara Reserve (L=3.18km) |
36 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
37 | Bhagabatta Baksalpara Road (L=3.00km) |
38 | Kharkutta Wageasi Road (L=15.00km) |
39 | Metalling & Black topping (Width=3.00m/3.75m) |
40 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, etc. |
41 | T04 toTebrongpara (L=3.75km) |
42 | Chilpara to Lower Bolmedam (L=1.25km) |
43 | T04 to Tengasot (L=1.77km) |
44 | Menadobato Mancheng (L=2.38km) |
45 | Agropatal to Nengbak wapil (L=4.79km) |
46 | Chima Aga to Arai Apal (L=3.84km) |
47 | Upper Bolmedam to Rongmatchu (L=4.64km) |
48 | T04 to Chilpara Reserve (L=3.18km) |
49 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
50 | Bhagabatta Baksalpara Road (L=3.00km) |
51 | Kharkutta Wageasi Road (L=15.00km) |
52 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,etc. |
53 | WBM Grade-II |
54 | T04 toTebrongpara (L=3.75km) |
55 | Chilpara to Lower Bolmedam (L=1.25km) |
56 | T04 to Tengasot (L=1.77km) |
57 | Menadobato Mancheng (L=2.38km) |
58 | Agropatal to Nengbak wapil (L=4.79km) |
59 | Chima Aga to Arai Apal (L=3.84km) |
60 | Upper Bolmedam to Rongmatchu (L=4.64km) |
61 | T04 to Chilpara Reserve (L=3.18km) |
62 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
63 | Bhagabatta Baksalpara Road (L=3.00km) |
64 | Kharkutta Wageasi Road (L=15.00km) |
65 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,etc. |
66 | WBM Grade-III |
67 | T04 toTebrongpara (L=3.75km) |
68 | Chilpara to Lower Bolmedam (L=1.25km) |
69 | T04 to Tengasot (L=1.77km) |
70 | Menadobato Mancheng (L=2.38km) |
71 | Agropatal to Nengbak wapil (L=4.79km) |
72 | Chima Aga to Arai Apal (L=3.84km) |
73 | Upper Bolmedam to Rongmatchu (L=4.64km) |
74 | T04 to Chilpara Reserve (L=3.18km) |
75 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
76 | Bhagabatta Baksalpara Road (L=3.00km) |
77 | Kharkutta Wageasi Road (L=15.00km) |
78 | Providing and applying tack coat with Bitumen emulsionusing emulsion distributor at the rate of 0.20 to 0.25 kgper sqm on the prepared bituminous surface cleanedwith Hydraulic broom as per Technical Specification Clause 503 |
79 | T04 toTebrongpara (L=3.75km) |
80 | Chilpara to Lower Bolmedam (L=1.25km) |
81 | T04 to Tengasot (L=1.77km) |
82 | Menadobato Mancheng (L=2.38km) |
83 | Agropatal to Nengbak wapil (L=4.79km) |
84 | Chima Aga to Arai Apal (L=3.84km) |
85 | Upper Bolmedam to Rongmatchu (L=4.64km) |
86 | T04 to Chilpara Reserve (L=3.18km) |
87 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
88 | Bhagabatta Baksalpara Road (L=3.00km) |
89 | Kharkutta Wageasi Road (L=15.00km) |
90 | Providing, laying and rolling of open-graded premixcarpet of 20 mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumenor emulsion to required line, grade and level to serve aswearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a threewheel 80-100 kN static rollar capacity, finished to requirlevel and grades to be followed by seal coat of eitherType A or Type B or Type C as per TechnicalSpecification Clause 508. |
91 | T04 toTebrongpara (L=3.75km) |
92 | Chilpara to Lower Bolmedam (L=1.25km) |
93 | T04 to Tengasot (L=1.77km) |
94 | Menadobato Mancheng (L=2.38km) |
95 | Agropatal to Nengbak wapil (L=4.79km) |
96 | Chima Aga to Arai Apal (L=3.84km) |
97 | Upper Bolmedam to Rongmatchu (L=4.64km) |
98 | T04 to Chilpara Reserve (L=3.18km) |
99 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
100 | Bhagabatta Baksalpara Road (L=3.00km) |
101 | Kharkutta Wageasi Road (L=15.00km) |
102 | Providing and laying seal coat sealing the voids in abituminous surface laid to the specified levels, grade andcross fall using Type A, Type B and Type C as perTechnical Specification Clause 510 |
103 | T04 toTebrongpara (L=3.75km) |
104 | Chilpara to Lower Bolmedam (L=1.25km) |
105 | T04 to Tengasot (L=1.77km) |
106 | Menadobato Mancheng (L=2.38km) |
107 | Agropatal to Nengbak wapil (L=4.79km) |
108 | Chima Aga to Arai Apal (L=3.84km) |
109 | Upper Bolmedam to Rongmatchu (L=4.64km) |
110 | T04 to Chilpara Reserve (L=3.18km) |
111 | L039-Dangkong Rabha to Imbanggi (L=2.36km) |
112 | Bhagabatta Baksalpara Road (L=3.00km) |
113 | Kharkutta Wageasi Road (L=15.00km) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail