Chemicals and Fertilizers Government Departments Closing in 0 days TDR #34369751

Tender For Fabrication And Erection Of Piping And Structural Jobs In Mfl, Ttp And Pat During 2022 - 23

Issued by Government Departments · manali, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Nov 2022
0 days left
EMD
4.46 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
manali → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Fabrication And Erection Of Piping And Structural Jobs In Mfl, Ttp And Pat During 2022 - 23

BOQ

Name of Work: FABRICATION AND ERECTION OF PIPING & STRUCTURAL JOBS IN MFL, TTP AND PAT DURING 2022 – 2023
Sl. No. Item Description
1FABRICATION& ERECTION AT MFL PREMISES INCLUDING GUSSETS, CLEATS,STIFFENERS, CONVEYOR DECK PLATES WITH PROVISION OF HOLES ETC WITH ALL NECCESSORY WELDING WITH M.S MATERIAL AND CONSUMABALES SUPPLIED BY MFL (RATE PER TONNE)
2Fabrication upto 1000 kgs*
3Erection upto 1000 kgs*
4Fabrication above 1001 kgs to 5000 Kgs *
5Erection above 1001 kgs. to 5000 kgs.*
6Fabrication above 5000 kgs *
7Erection above 5000 kgs. *
8DISMANTLING-INCLUDES CUTTING OF BOLTS AND OTHER NECESSARY THINGS
9Structurals – Rate per tonne
10Gratings – Rate per sq.m
11Hand rails – Rate per RM#
12REMOVING & FIXING ONLY
13Gratings – Rate per Sq.m.
14Hand rails – Rate per RM(includes Top, Middle, Toe piece) #
15Step Grill (i) 750mm
16Step Grill (ii)980mm
17Step Grill (iii) 1080mm
18FIXING ONLY
19Gratings – Rate per Sq.m.
20Hand rails – Rate per RM (includes Top, Middle, Toe piece) #
21Step Grill (i) 750mm
22Step Grill (ii)980mm
23Step Grill (iii) 1080mm
24PIPES AND FITTINGS (Pipes upto Sch.40)
25Erection of pipes – Carbon Steel
26Erection of pipes – Stainless Steel
27Welding– Carbon Steel
28Welding – Stainless Steel
29PIPES AND FITTINGS(Pipes of Sch.80)
30Erection of pipes – Carbon Steel
31Erection of pipes – Stainless Steel
32Welding– CarbonSteel
33Welding – Stainless Steel
34PIPES AND FITTINGS(Pipes of Sch.40 – X-Ray quality welding)
35Welding– Carbon Steel
36Welding – Stainless Steel
37PIPES AND FITTINGS (Pipes of Sch.80 – X-Ray quality welding)
38Welding– Carbon Steel
39Welding – Stainless Steel
40PIPES AND FITTINGS(Pipes of Sch.160)
41Erection of pipes – Carbon Steel
42Erection of pipes – Stainless Steel
43PIPES AND FITTINGS (Pipes of Sch.160 – X-Ray quality welding)
44Welding– Carbon Steel
45Welding – Stainless Steel
46PIPES AND FITTINGS(Pipes of Sch.40 – X-Ray quality welding. Root TIG welding to be done)
47Welding– Carbon Steel
48Welding – Stainless Steel
49PIPES AND FITTINGS(Pipes of Sch.80 – X-Ray quality welding. Root TIG welding to be done)
50Welding– Carbon Steel
51Welding – Stainless Steel
52PIPES AND FITTINGS(Pipes of Sch.160 – X-Ray quality welding. Root TIG welding to be done)
53Welding– Carbon Steel
54Welding – Stainless Steel
55FULL FILLET WELDING
56For Plates only up to 8mm thk Carbon Steel
57Slip Blind:
58Upto 10mm thick
59Above 10mm thick
60Flanges without machining – upto 10mm thickness
61Flanges without machining – above 10mm thickness
62FITTINGS:
63Mitre Elbow
64Reducer (quote for higher dia)
65Tee
66Clamp (150 mm width)
67Fabrication of Heat Bend
68½” Size
69¾” Size
70Fabrication of Heat Bend
71Erection of Valves (Flanged) (Not Applicable in Case of Piping renewal beyond 5mtrs of length)
72Valves A (150 PSI rating)
73Valves B (300 PSI rating)
74Valves C (600 PSI rating)
75Elevators : Top and Bottom Sprocket reconditioning
76Product Elevator
77Primary, Secondary, Urea and RMTE Elevators
78Primary, Secondary, Urea and RMTE bucket chain shortening
79Product Elevator chain shortening
80Removing Buckets from Old Chains by Gas Cutting :
81Product Elevator
82Primary, Secondary, Urea and RMTE Elevators
83Renewal of Loose bolts (bucket)
84Bucket Assembling in Length of 10 Buckets
85Product Elevator (Single Chain)
86Primary, Secondary, Urea and RMTE Elevators (Double Chain)
87Renewal of Buckets including bolts
88Primary, Secondary, Urea and RMTE Elevators
89Product Elevator
90Antisway Assembly, fabrication & fixing at site for all elevators in A, B & C Trains inclusive of welding, dismantling,& opening and boxing up of doors.
91Casing repairs all elevators, Fines Conveyor & SDF with 8mm Plate
92Renewal of Top Hood (Dismantling, Fabrication and Erection at site)
93Product Elevator with 8mm plate(D + F + E)
94Primary, Secondary, Urea & RMTE Elevators with 8mm plate (D + F + E)
95Fabrication and Fixing up of coupling guardat site
96Product Elevator, Pumps & Conveyors
97Primary, Secondary, Urea & RMTE Elevators
98Renewal of Chain Guards
99Product Elevator (D + F + E)
100Primary, Secondary, Urea & RMTE Elevators (D + F + E)
101O.S.P Guard (Mesh type) (D+F+E)
102Renewal of Take-up Frame
103Product Elevator
104Primary, Secondary, Urea & RMTE Elevators
105Changing Head Sprocket of Product Elevators including removal and re-fixing of top hood and drive chain guards by delinking the bucket chain.
106Changing of head sprocket assembly of Primary, Secondary, Urea, RMTE Elevators including removal and re-fixing of top hood and drive chain guards by delinking the bucket chain.
107To inspect Antisway including opening and boxing up of doors.
108Screen Drag Feeder & Fines Conveyor
109Reconditioning of Sprockets
110Reconditioning of flights and repairs (Straightening, welding, etc.)
111Converting brackets from fines to SDF type
112Fabrication of modified SDF brackets
113Take–up frame fabrication
114Shortening of Fines conveyor and SDF flight chain
115Guide Details
116Drilling bolt holes and welding stiffeners
117Fixing at Site
118Removal of old guide rail
119All of the above 3 jobs put together
120Flight replacement
121Bolts replacement
122Bracket renewal
123Renewal of Tensioning rod
124Flight chain tensioning
125Renewal of tail sprocket bearing
126Fines conveyor / SDF head sprocket renewal including hood / doors removal and re-fixing.
127Fines conveyor / SDF tail sprocket renewal including removing and re-fixing of hood / doors and tensioning the take up.
128Wear Plate by Stitch welding
129Fixing wear plate (by stitch welding) including removal of old one on the guide rail
130Oversize Pulverizer (R/C of Flail Chain by Cutting & Welding)
131Units of 5 Links
132OSP rotor renewal
133Diverter renewal
134Flail chain diverter
135Butterfly damper – renewal
136Fab & Installation of Doors & Frames in all places 8mm / 6mm
137Frame including welding$
138Door with handle and hinges
139Dryer
140Seal replacement
141Knocker chain welding – renewal
142Retension ring with stiffeners renewal
143Coupling guard fab & installation with 8mm plate
144Trunnion guard fab & installation with 8mm plate
145Spiral flight renewal (D+F+E) including welding on both sides.
146Lifting flight renewal (D+F+E) including welding on both sides.
147Grizzly bar renewal (D+F+E)
148Cooler
149Seal Replacement
150Retention ring renewal
151Fabrication & installation of coupling guards – 8mm
152Fab & installation of Trunnion roller guards at site
153Conveyors
154Fabrication of Gearbox and motor base and fixing the same
155Renewal of CFC, Feeders & Filler transfer conveyor belts with renewal of roller, frames& drums
156Renewal of Head drums / Gravity take up drum including bearings
157Renewal of tail drum / snub drum including bearings
158Conveyor tension take up renewal
159Conveyor tensioning & off centre adjusting
160Conveyor tail drum bearings & head drum free end bearing renewal
161Snub drum bearing renewal
162Conveyor head drum sprocket side bearing renewal
163Troughingidler frame fabrication
164Return Idler bracket fabrication & fixing
165Self-aligning idler frame fabrication
166Fabrication & fixing of ploughs
167Fabrication & fixing of coupling guard
168Fab & fixing of chain guard
169Fab & fixing of skirt box complete
170Head & tail pulley guard fab & fixing
171Renewal of skirt rubber complete per conveyor
172Renewal of troughing idler frame
173Replacing of conveyor belt including renewal of all types of rollers, frames & drums, removing and re-fixing of deck plates, chain guard ,load cell etc.
174For all conveyors (except the conveyors mentioned in the Sl No. 10, of Note in theBOQ)
175Renewal of carrying rollers / return rollers
176Renewal of bag guide pipe.
177Fab & fixing of reverse troughing idler
1780-401 Conveyor (UREA)
1790 – 401 skirt rubber renewal including frame (for all lengths of rubber)
180Dislocated Grizzly lifting and positioning including necessary dismantling, fabrication and erection of structures and removing & refixing of skirt rubber
181Miscellaneous(Urea)
182PT fan expansion bellow renewal including cutting & fixing of bolts.
183PT fan cushy spring renewal
184Fabrication & Fixing of Belt guard
185Belt guard for pumps
186Quench air fan belt guard (D+F+E)
187Blunger
188Blunger paddle hard facing at site
189Blunger paddle changing at site
190Screen Room
191Vibrator spring renewal
192Screen mesh renewal
193Vibrator bolts renewal
194I-Bracket renewal
195Vibrator unit renewal in full
196Vibrator motor renewal
197Screen damper renewals
198Renewal of Lines
199Dismantling &re-fixing of slurry line
200Dismantling &re-fixing of jump over lines
201Renewalof acid unloading hose
202Renewal of air hose
203Renewal of acid line
204Choke removing by flame heating
205Flame heating for 1 hour
206Flame heating above 1 hour
207Clamp fab & arresting pipe line leak
208Fans : Rigging & Fab works connected with rotor renewal including removal and re-fixing of quadrant, jack bolts welding if necessary decoupling & coupling or removal and re-fixing of V belts & guards
209Dryer Fan
210Fumes Fan
211Primary Air Blower
212Dust Fan & Cooler Fan
213Quench Air Fan
214Motor of Fans : Shifting of new and damaged motor from shop to plant & back and renewal of motor including decoupling and coupling or removal and re-fixing of V-Belts and guards
215Dryer Fan Motor
216Fumes Fan Motor
217Primary Air Blower Motor
218Dust Fan motor
219Cooler Fan Motor
220Quench Air fan motor
221Miscellaneous
222To renew headsprocket assembly by delinking bucket chain, including hood removal and re-fixing
223To renew segment, in situ without disturbing the bucket chain including hood removal and re-fixing.
224To renew segment bolts upto 4 nos.
225To renew segment bolts above 4 nos.
226To renew Primary & Sec Ele. Bkt chain link plate broken / shearing including takeup lifting
227To change Elevator Bucket Chain (Feeding into the casing)
228Primary, Secondary, RMTE & Urea Elevator chains
229To renew product elevator bucket chains
230To renew & weld elevator bottom spkt shaft end collar
231To open and box up elevator antisway door
232To re-fix bottom spkt of product elevator
233To check up Fines/SDF loose/missing bolt (during short shutdown)
234To check up and tack weld fines & SDF flight new chain. Also checkup brkt bolts (per length 10 feet)
235To remove entangled/ hanged flights from SDF and Fines Conveyor /blunger
236To fab & erect spring take up housing for SDF
237To renew OSP flail chain in location
238To make 5 flail chain for OSP from used chain
239To fab and erect chute vib. Base with vib assembly
240To renew chute vib
241To replace Bin vib
242To fabricate & erect chute vib. Guard
243To fix chain with wedge for inspection doors
244To fab & erect OSP door hinges out of 1” thick plate with supporting gussets
245To repair dryer tyre supporting pad crack
246To weld dryer tyre supporting end bar D+ F+E
247To fix dryer knocker chain at shell(Joining two lengths)
248To fab and weld dryer lifter flight gusset
249To fab dryer knocker chain clamp from 1” dia rod & weld in either side
250To fab and erect dryer grizzly bar from 1” thick plate with V notch (D+F+ E)
251To repair dryer shell crack under the Girth Gear
252To repair The crack through and through
253To repair the crack if it is not through and through
254Prod. Cooler& Dryer air seal (modified) rubber renewal
255To remove and fix Conveyor drive chain guard
256To remove and fix drum guards
257To fabricate & erect guide roller bracket
258To adjust of skirt box rubber
259To erect belt con. External scrappers
260To fabricate belt con. External scrappers
261To repair BCC Slat chain
262Tofab & erect Guide rail/wear plate
263To assemble BCC slat chain with slats
264To remove & fix gravity take upsupport cross channel / ISMB endless belt renewal
265To remove & fix Feeders D/Chain guard
266To reposition BCC Discharge Plate
267To fab & erect bag guide plates (SS)
268To reposition / alter diverter suitable to bags direction
269To reposition through con. Discharge chutes.
270To reposition of derailed carriage/ tripper
271To fabricate replaceable bolt with base for dryer trunnion changing
272To fabricate and fix jack bolts in Head drums and small gear boxes
273To fix coupling guard – Conveyor, OSP etc.,
274To fab of tension brkt for screen mesh
275To fab screen mesh center strip
276To patch up screen mesh end
277To fab screen mesh I bracket
278To fab and erect Pan Feeder gate
279To fab Pan Feeder `J’ hooks
280To replace `J’ hooks with springs
281To change diaphragm valve 50, 65, 80 & 100 mm
282To change diaphragm valve 250 mm
283To remove & fix blind flanges upto 1” after clearing the choke
284To adjust con off center by providing weights at gravity take up
285To box up man hole clean out door with gaskets in Dust & Scrubber system
286To fab & erect cyclone poking pipes with cover along with chain upto 1-1/2” dia
287To provide safety chains to chute vib.
288To fab and erect Raw materialbins vortex plate
289To fabricate and erect Trickle valve, casing (Complete)
290Effluent tank : To fix Tank mesh frames and repair / replace old mesh/change with an clean out door and erect
291To remove effluent tank mesh with frame assembly and fix after cleaning
292To fix permanent magnet at pan feeder
293To remove & fix choked ring headers, after cleaning (Complete)
294To fabricate & erect surge bin SS Square chute for IBM
295To replace Motors jack bolts for drive belts tensioning
296To renew Fan Expansion joint rubber with clamp in NPK plant
297To inspect Elevator Chain 6859/6856m by opening boot door per side of double strand chain.
298To fabricate and weld handle
299To fabricate and weld lock rod
300To fix missing collar pin on Elevator chain
301To replace 6859 Takeup assembly including bucket removal &re-fixing, delinking and linking of chain, take up block sleeve replacement, side door & take up frame removal and re-fixing.
302Renewal of broken pin / link in 6859/6856M chain
303Dryer tyre pad cutting and removal
304Dryer new pad fixing & full welding with shell and end bar welding
305Dryer/Product cooler air seal clamp removal &re-fixing
306Dryer / Product cooler tyre pad end bar welding
307Urea evaporator shell crack repair and welding
308Girth Gear splice bolt replacement in product cooler and coating drum
309Removal & replacing rubber shell in pan feeder
310Worn out area metal filling in 6859/6856m/698A chain
311698A head and tail sprocket segment renewal (removal of old sprocket by delinking the chain) – one set of 3 nos.
312Spiral plate / lifter flight full welding on both sides of dryer
313Gravity take up unit lifting & positioning
314Take up assy. lifting and positioning in 6859/6856M chain
315Dryer bracket welding
316Bolt cutting ½” to 1”
317Bolt cutting above 1”
318Dryer long stud removal and re-fixing. Tightening the nuts with link plate (2 nos.,) and short stud fixing (2 nos.)
319FC/SDF head sprocket assy. renewal including hood or doors removing and re-fixing.
320Conveyor belt reversing including removal of head/tail drum, frame, rollers, deck plate removal &re-fixing and off center adjusting
321FC/SDF front/rear door removal and re-fixing
322OSP/fan bearing inner race cutting
323FC/SDF bracket bolt renewal
324Man Power
325Fabricator-Normal duty
326Welder -Normal duty
327Helper to Welder / Fabricator - Normal Duty
328PAT jobs
329Sump Pump Renewal/Removal and Re-fixing
330Acid Transfer Pump Renewal/Removal and Re-fixing
331Booster Pump Renewal/Removal and Re-fixing
33212 Inch dummy removal and Re-fixing
333Upto 6 Inch dummy removal and Re-fixing
334Concrete Slab removal or fixing job in dock line area
33512 Inch Spool Piece removal and Refixing
3366 Inch Spool Piece removal and Refixing
33712 inch Fig – 8 Blind removal and fixing
338Underground dock line 12” pipe repair job including pipe renewal, shifting, pressure testing, welding and again shifting back and fixing and final pressure testing
339Material loading and unloading at PAT
340Underground 12” pipe area trench cleaning including hard soil, unwanted materials and refilling after pipe repair job
341Upto 6 inch line choke cleaning, Pipe removal and re-fixing
342Gasket renewal – 12 inch
343Gasket renewal – upto 6 inch
344FABRICATION :
345Fabrication and erection charges for essentially Plate Items such as vessels, tanks, elevator casings, etc., predominantly with plates of any thickness.
346Fabrication and erection charges of essentially structural items like towers, pipe racks, etc., predominantly involving larger sections of structural items.
347Bending and rolling of plates (including transport)
348Fabrication and erection charges of eccentric Cones, reducers etc.
349Bending and rolling of angles, channels etc. (including transport)

AI Tender Summary

OUR REF NO 34369751
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 14-11-2022
Authority
Authority Name Madras Fertilizers Limited
Work Description Fabrication And Erection Of Piping And Structural Jobs In Mfl, Ttp And Pat During 2022 - 23
Basic Detail
Tender No ESER/MAINT/IP/FABRICATION /141122/025 Date14.10.22
Bidding Type Tender
Location
City manali
State Tamil Nadu
Key Dates
Publish Date 14 Oct 2022
Submission Date 14 Nov 2022
Open Date 15 Nov 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 4.46 Lakhs
Exemption Not Available
Document List
a637c1fc-3f0b-42b2-bf44-8e69adb229f1.html
BOQ_755127.xls
TECHNICAL.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 14, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 14, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 15, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

a637c1fc-3f0b-42b2-bf44-8e69adb229f1.html

xls

BOQ_755127.xls

pdf

TECHNICAL.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender