}

Tender For Augmentation Of Water Supply Scheme For Village Chautala Distt. Sirsa And Providing Sewerage System In Village Chautala Distt. Sirsa, mandi-Haryana

Public Health Engineering Department-PHED has published Tender For Augmentation Of Water Supply Scheme For Village Chautala Distt. Sirsa And Providing Sewerage System In Village Chautala Distt. Sirsa. Submission Date for this Tender is 26-10-2022. Sewerage Construction Tenders in mandi Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

34366271
Tender For Augmentation Of Water Supply Scheme For Village Chautala Distt. Sirsa And Providing Sewerage System In Village Chautala Distt. Sirsa
Open Tender
Indian
Haryana
mandi
26-10-2022

Tender Details

Augmentation Of Water Supply Scheme For Village Chautala Distt. Sirsa And Providing Sewerage System In Village Chautala Distt. Sirsa Const. Of Rcc Np3 Pipe Channel, 2 No. Brick Lining Ss Tank, Rcc Ss Well For Rw And Cw, 4.00 Mld Wtp, 2 No. Rcc Cwt, 1 No. Pump Chamber, Boundary Wall, Laying Of Rising Main And Distribution System, Const. Of Cwt An Pump Chamber, Earth Filling

Key Value

Document Fees
INR 50000 /-
EMD
INR 12384348.0 /-
Tender Value
INR 61.92 Crore /-

BOQ Items

Name of Work: Part – A) Water Supply :-Augmentation of water supply scheme for village Chautala Distt. Sirsa. “Old Water Works: - Const. of RCC NP3 pipe channel, 1 No. RCC HLT, 1 No. Pump Chamber, RCC S/S Well for R/W & C/W, Renovation of existing structures, 2nd Water Works & B/Stns :- Const. of RCC NP3 pipe channel, 2 No. Brick lining S/S Tank, RCC S/S Well for R/W & C/W, 4.00 MLD WTP, 2 No. RCC CWT, 1 No. Pump chamber, Boundary wall, Laying of Rising main & Distribution System, Const. of CWT & Pump chamber, Earth filling & IPB Path at 3 No. B/Stns., Providing FHTC, P/F Pumping Machinery, 200 KVA Transformer, Electrical Panel, CI DF/PE Specials, Testing Commissioning of all structures and installations, operation and maintenance of 2nd water works including all component with rising main & distribution system as per schedule -IV for 12 months during defect liability period after trial run period of 3 months and 5 years thereafter and all other works contingent there to". Part – B) Sewerage System :- Providing sewerage system in village Chautala Distt. Sirsa. “Design, Construction , Erection , Testing and Commissioning of Automatic and PLC controlled with SCADA for 3.50 MLD Sewage Treatment Plant based on Sequential Batch Reactor technology, construction of 10.5MLDMain Pumping station withautomatic and PLC controlled with SCADA, complete in all respect including disposal of treated effluent through RCC pipes NP-3 by gravity in Pondage, Staff quarters, approach roads, boundary wall, land scaping, MCC panel Room, Laboratory, CCTV cameras, Transformer,DG set, HT/ LT panel room, meter room, Security room, Boundary wall, providing and installation of high mast lights and street lights with solar panel, internal lighting, other contingent, Electrical, Mechanical, Piping & instrumentation work and laying of various size S.W. Pipe construction of manholes, intercepting chambers for households, IPS at Jawahar Colony, HDPE rising main and all other works contingent thereto including Operation & Maintenance for 12months during defect liability period after trial run of 3months and 5 years thereafter in village Chautala Distt. Mandi Dabwali.
Sl. No. Item Description
1N.S. Item
2(A) WATER SUPPLY :- Construction of 4.00 MLD Rapid sand filteration plant comprising of labour for D.I. pipe from existing Raw water main / pump, inlet box, inlet channel. Alum dozing, flash mixing. Tapered flocculate Rectangular setting tank. Filter box, over head reservoir for back wash including pump sets and electric control panel, sluice valves, DI pipes, DI specials, manhole covers, air scour equipment, Chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respect as per DNIT. Labour rate for fixing DI, S/S class K9 ISI marked pipes including cost of DI Specials/fitting, ISI marked PN 1.6 sluice valves including cost of excavation, laying, cutting, jointing, threading and jointing material in horizontal length including connection complete in all respects From existing raw water main pump to inlet box of filter unit to clear water tank, Note-DI pipe will be supplied by the department free of cost sluice valve ISI marked (Based on SCADA system- 4.00 MLD WTP)
3Supply & erection of horizontal spindle split casing type pumping sets of minimum for (4) star rating duties directly coupled to AC squared cage including type motor with 1440 RPM, 3 Phase, 50 Hz and accessories as described in Schedule No. II with priming arrangement and complete base frame as per IS marked complete in all respect. Raw Water Pump Set 1300 LPM with 12 Mtrs. Head
4Raw Water Pump Set 3500 LPM with 12 Mtrs. Head
5Clear Water Pump Set 4500 LPM with 40 Mtrs. Head
6A) Supply, erection, testing and commissioning of wall mounted electrical panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200x900 mm and 400mm deep having following items. (A) For Raw Water Pump set 3500 LPM x 12 Mtrs Head 2 Nos. at w/w. a) Main switch as required2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No. for 3500 LPM 12 Mtr H) Capcitor of suitable capcity - 2 Nos. I) Indicating Lamp - One Set J) Change Over switch suitable capacity amp =1 No.
7B) For Clear Water Pump set 4500 LPM x 40 Mtrs Head = 2 Nos. at water works. a) Main switch as required2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 2 No. of approved make g) Motor starter, Star delta 2 No. for 4500 LPM 40 Mtr Head Motor (L&T, Simens, AAB) H) Capcitor of suitable capacity - 2 Nos. I) Indicating Lamp - One Set J) Change Over switch suitable capacity amp. - 1 No.
8Supply, erection, testing of reputed make LED Light 100 Watt with fitting and accessorie complete in all respects at water works and - 3 Nos. Boosting Station.
9Credit of old pumping Machinery:- a) Raw water 1800 LPM x 12 mtr., 2000 LPM x 12 mr. and 3000 LPM x 12 mtr. Head ( 1No. each)
10b) Clear water 3000 LPM x 40 Mtr. Head
11c) Clear water 1500 LPM and 2000 LPM x 30 Mtr. Head
12d) Clear water 600 LPM and 800 LPM x 30 mtr head
13e) Credit of old bricks
14d) Credit of old steel
15Credit of old damaged 400mm i/d RCC pipe channel at water works (50% of 6490 M)
16Providing lowering in trenches to correct gradient and alignments, jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE, lining ISI marked as per ISI code IS:458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benching, haunches and envelopes are completed. The pipies shall rest on the beds at all joints through their lengths and to ensure this, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer incharge including all cartage etc complete in all respects. A) RCC pipe with inside HDPE line class-NP-3 i) 450mm i/d
17ii) 500mm i/d
18iii) 600mm i/d
19B) MAIN PUMPING STATIONS :- Design, construction, erection, testing and commissioning of MPS including following components including O&M for 5 years after one year defect liability period and 3 month trial run period:- (i)RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 3.50 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 5 No. Pumping Set of i.e. 1 no. 7500 LPM (437.50 cum per hour), 2 no. 2500 LPM (145.83 cum per hour) & 2 no. 1250 LPM (72.91 cum per hour) with 25 mtr. Head each suitable LT panel equipped with all safety devices, automatic capacitor bank and submersible cable form LT panel to pump sets complete in all respect. (ii)K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valves as per requirements even for bye-pass arrangements complete in all respect. (iii) 3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. (iv)Supply and installation of 2 Nos. mechanical course screens of minimum length 6 mtr for 3.50 MLD average flow with peak factor of 3.0:- a) The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. b)All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. c) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC & SCADA and shall be synchronized with PLC panels at MPS & STP site through broadband internet facility. d) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work including O&M of 5 years after 12 months defect liability and 3 months trail run period.
20SEWAGE TREATMENT PLANT :- “Design, construction, erection, testing & commissioning of 3.50 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including, Landscaping, MCC Panel Room & all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device on inlet and outlet, Real Time water quality monitoring with Data collection system (Online analyzer) Piping & Instrumentation works with PLC & SCADA Arrangement for STP & MPS along with Synchronizing it with each other including furniture & laboratory equipments as per detail given in the bid document and including following components including O&M for 5 Years after 12 months defect liability period and 3 months trial run period. i) (2 No. High Mast of 9 mtr. GI Octagonal pole of 4 mm thickness (T=100 MM, B= 200 MM, Base Plate-320x320x20mm), window at 500 mm from Base Plate) 12 Nos. Providing & fixing of Solar light 30 watt with dark & motion sensor, 2 level intelligent dimming after 3 and 6 hours of operation, IEC certified solar panel, LM80 certified LED, IP 65 complete design to protect from rain & dust and UL certified lituimion battery with 2 year system warranty of 6 Mtr. GI pole complete in all respect, along the road and path complete in all respect. ii) Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg at STP site.As per satisfaction of Engineer-in-Charge. iii) Providing and installing 2 No. centrifuges (1working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect, including packing dry sludge in 20 kg Bag and supplying the same in Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT including operation and maintenance of 5 Years after 12 months defect liability period and 3 months trail run period. iv) ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH:- Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 3.50 MLD STP Chautala for online (Continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data in CPCB, HSPCB & PHED.TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluent and as contained in scope of work including operation & Maintenance of 5 Years after 12 months defect liability period and 3 months trail run period. a) Multi-parameter measuring converter, for connecting upto 18 intelligent sensors Scope including 8 analog inputs/ Outputs (4 inputs & 4 outputs) (o/4-20 Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement in the outlet/ effluent of plant of 3.50 MLD STP at village Chautala with integrated with automatic cleaning. b) Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier & temperature sensor with Automatic Temperature compensation (ATC) cable length 100 Meter (minimum) c) Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (minimum) d) Data Transfer to CPCB, HSPCB & PHED Servers during 6 year of O&M after commissioning after 3 months trial period (including 1 year of defect liability period) e) Providing GSM 5G, 4G Modem with mobile network connectivity including network charges for operation & Maintenance of 5 years after 12 months defect liability period and 3 months trail run period.
21CCTV CAMERAS:- Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site. i) At STP & MPS Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12 mm lens size, 1 Nos. 3.6mm lens size. Make: - CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode 2.4.2 12 mm very focal with extra IR, CCTV Cameras should be installed and commissioned before starting execution of work including operation & Maintenance of 5 Years after 12 months defect liability period and 3 months trial run period.
22Construction of HT/LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, window and fitting with toilet block including sanitary fittings etc. as per drawing attached in DNIT at MPS & STP site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area 250 sqm. including operation & Maintenance of 5 years after 12 months defect liability period and 3 months trail run period.
23OPERATION & MAINTENANCE:- Operation and Maintenance of the water treatment plant, distribution system laid by contractor and pumping machinery at water works and B/Stations (Disinfection material supplied by the PHED) as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period (will be charged to the A/Mtc. estimate). Complete in all respects. (i) Operation & maintenance during defect liability period (Operation only) after 3 months trial run period.
24(ii) For 1st year Operation & maintenance after defect liability period.
25(ii) For 2nd year Operation & maintenance.
26(iii) For 3rd year Operation & maintenance.
27(iv) For 4rth year Operation & maintenance.
28(iii) For 5th year Operation & maintenance.
29Operation and Maintenance Intermediate pumping station, Sewerage net work (excluding MPS & STP, O&M of same has been included in the respective item’s rate) as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/Mtc. estimate) Complete in all respects (i) Operation & maintenance during defect liability period (Operation only) after 3 months trial run period.
30(ii) For 1st year Operation & maintenance after defect liability period.
31(ii) For 2nd year Operation & maintenance.
32(iii) For 3rd year Operation & maintenance.
33(iv) For 4rth year Operation & maintenance.
34(iii) For 5th year Operation & maintenance.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail