Power Boards / Undertakings / PSU Closing in 0 days TDR #34359763

Tender For Upkeeping Of Control Room Control Equipment Room

Issued by Boards / Undertakings / PSU · anpara, Uttar Pradesh
Tender Value
3.28 Lakhs
Estimated cost
Bid Submission
12 Nov 2022
0 days left
EMD
6500
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
anpara → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Upkeeping Of Control Room Control Equipment Room Upkeeping Of Control Room Control Equipment Room Das Room Ppts, Boiler And Turbine Side Field Equipment Of Unit 4 And 5 Btps Anpara

BOQ

Name of Work:Up keeping of Control Room, Control Equipment Room, DAS Room, PPTS, Boiler and Turbine Side field equipments (Including CPP, Mix Bed WTP, Regeneration Room of CPP) of Unit 4&5, BTPS, Anpara.
Sl. No. Item Description
1PART A
2Removal of dust particles by thorough cleaning & mopping from out side of the following panels & Control equipments installed in Unit Control Room No. 4&5 BTPS.a. Unit Control desks.b. Unit Control Panels.c. Water quality monitoring panels.d. Electrical protection relay panels.e. Fire system panels.f. Soot blower panels, APC Printers.g. Vibration monitoring system console.h. APC Operator station/Key board.
3Removal of dust particles by thorough cleaning & mopping from out side of the following control panels & equipments installed in control equipment room & APC operator station room of Unit No. 4&5 BTPS.a. APC cabinets.b. BMS cabinets with RC feeder, flame scanner & MFT cabinets.c. Vibration monitoring panels.d. BFP control & measurement cabinets.e. BSQ panels.f. Boiler & Turbine interlock relay panels.g. Main turbine DEHC cabinets.h. TSI cabinets.i. On-line vibration monitoring panels.j. Turbine measurement cabinet.k. TSQ panels.l. Boiler annunciation aux. cabinets.m. Turbine annunciation aux. cabinets.n. TLC power electronic control cabinets.o. TLC Tosmap panels.p. Annunciation cabinets.q. Electronics master clock cabinets.r. Inverter cabinets of APC operator station.s. MAX_1 control station equipments.t. BFP-T-EHG maintenance tool (computer).u. RMS maintenance facility console (computer)
4Weekly Removal of dust particles by thorough cleaning & mopping from out side of the following local control panels/cabinets, junction boxes & control equipments mounted at side/field on turbine side including CPP mixed beds of both Unit Jobs 4&5 BTPS. a. BLPs of BFP – 6 nos.b. BFP gauge panels – 8 nos.c. BFP local control panels – 2 nos.d. T-BFP test panels – 2 nos.e. Oil tank gauge panels of BFP & Mot.-5 nos.f. Debris filter control panels – 2 nos.g. Condenser tube cleaning control panels-2nosh. Turbine local monitoring panels – 2 nos.i. Turbine local panels – 93 nos.j. Turbine marshalling board panels – 12 nos.k. Local junction boxes & terminal boxes.l. Field equipments & local panels of Regeneration system of CPP & WTP
5Cleaning and mopping of PVC tile’s floors of unit control room, control equipment room. APC operator room of unit Jobs 4&5 BTPS including analyzer rooms and sample water table room of units (Total floor area about 600 sq. meter.)
6Proper cleaning of dust, dirt and webs from side walls, false ceiling, door, windows and ventilators of these rooms (Total side walls false ceiling etc. area about 1350 sq. meter).
7Removal of dust particles by cleaning & mopping from outside the cabinets/panels inside telephone exchange room (SHB ground floor).
8Removal of dust particles by cleaning & mopping from out side the following panels/equipments inside Intrasite Communication equipment room (+7M).a. P&P Master equipment panel 0.6X1.8X2.4 Mb. P&P Master panels – 2 Sets 0.6X1.8X2.4 M.eachc. UPS panel 0.8X1.8X2.4 Meters.
9Cleaning and mopping of PVC/tiled floors of room at Sl.No. 1 to 6 above, 03 Nos. C&I lab rooms & one no., C&I spares parts room including cleaning of jalas from walls and false ceiling & cleaning of glass panels of windows ventilators doors so as to provide dust free atmosphere inside various rooms total floors area 670 Sq. Mtr. of unit 4&5 BTPS
10Removal of dust particles by cleaning & mopping room out side the following DAS cabinets of unit 4 & 5: -a) Each DAS room consists of DAS Input termination cabinets.b) DAS main cabinets.c) DAS power distribution board cabinet.d) Programmers console & printer with CRT desk etc.e) CRTs and panels etc. in shift engineer’s room.
11Unit Control Room, CER, APC operator station room floor of unit #4&5 (approx. area 607 m²/Unit.)
12Removal of dust particles by cleaning & mopping from inside & out side the computer cabinets (14 Nos.), APC cabinets (02 Nos.) program instructor console (06 Nos.), Printer, 09 Nos., hard copiers (02 Nos.) Field terminal device (01 Nos.) Fire protection and alarm panels (01 No) Power distribution board panels (01 No) Relay panel (01 No) UCP one set of 04 Nos., VCD one set of 04 Nos.) Station control panels (One set of 03 Nos.) various instruments mentioned there and all other left over equipment inside computer room, Simulator room and instructor console room.
13Cleaning and mopping of PVC tiled jack floor of simulator room, computer room and instructor console room including cleaning of wall, false ceiling and windows ventilators and partition walls etc. so as to provide best cleaned dust free atmosphere for continuous working of sophisticated electronics/ computer equipments.
14PART B
1516 nos. of Oil firing control system instrumentation (Igniters, oil gun solenoids and associated equipments)
166 nos. of Firing station valves.
17(a)Coal mill control system (bunker feeder outlet ball filling gates inlet & Bypass air damper)- 32 nos(b)Cold hot air damper-16 nos ( c)PC pipe mill outlet gates.- 32 nos. (d) Cold & hot air pneumatic shutoff gates & air filter and pressure regulator metallic pipe connection limit switches power cylinder and air lines.- 16 nos
18Instruments panels related to coal mills delta P measurement system noise level system. Oil station gauges and switches and switch boards.- 8 nos.
19Secondary air control damper along with associated regulator filters etc.- 68 nos.
20Other electrically, pneumatically operated control valves and dampers.- 128 nos
21Soot Blowers Panels.
22HP bypass station and field panel.
23Control panels in UCR, CER of unit #4&5. Approx. area 950 m².
24Other local control panel BJBs, BMBs, MMBs, BLPs etc.
25Side walls and ceilings of UCR, CER & APC operator station room of #4&5 approx. area 1350 m².
26Removal of dust particles by cleaning & mopping from outside the following UPS cabinets of unit 4 & 5. Each UPS room cabinets: -(a) DAS UPS cabinets: 04 Nos.(b) Boiler UPS cabinets: 04 Nos.(c) Turbine UPS cabinets: 04 Nos
27Removals of dust particles by cleaning & mopping from outside the panels/equipments inside CW pump house DAS room inside HT Switch gear.
28Cleaning and washing on both sides of 160 nos. Acrylic covers of flush type tube light fittings installed in various rooms at SL. No. 1 to 6, C&I lab (21 M) and C&I spare parts room, so as give clear visibility. The cleaning is to be done very carefully so as to avoid damage of Acrylic covers.
29Cleaning and mopping of both sides of 351 Nos. acrylic sheets each of size 0.6x0.6 Sq. meter installed in simulator room. The cleaning is to be done very carefully so as to avoid damage of Acrylic sheets and covers.
30Cleaning and washing on both sides of acrylic sheets of each size 0.6X0.6 sq. meter installed in UCB Job 4&5 BTPS, so as to give clear visibility inside control room (331 Nos.)

AI Tender Summary

OUR REF NO 34359763
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 3.28 Lakhs
LAST DATE 12-11-2022
Authority
Authority Name Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited
Work Description Upkeeping Of Control Room Control Equipment Room Upkeeping Of Control Room Control Equipment Room Das Room Ppts, Boiler And Turbine Side Field Equipment Of Unit 4 And 5 Btps Anpara
Basic Detail
Tender No 4/CIMD-I/BTPS/T-1/22-23
Bidding Type Tender
Location
City anpara
State Uttar Pradesh
Key Dates
Publish Date 13 Oct 2022
Submission Date 12 Nov 2022
Open Date 16 Nov 2022
Finance
Tender Value 3.28 Lakhs
Tender Fee 590
EMD 6500
Exemption Not Available
Document List
e64e47d4-bf05-46ce-ae72-751188c361d5.html
BOQ_1195383.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 13, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 12, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 16, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

e64e47d4-bf05-46ce-ae72-751188c361d5.html

xls

BOQ_1195383.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders