|
| 1 | Repair and rewinding work of 75 HP motor kirloskar make by best quality of insulating material and copper wire replacement of top bootom both ball bearing and tapper rollar bearing as per required size & dimension, providing & fitting new terminal/ connection plate with brass holder studs, nut and washer etc. complete work done with cost of material, labour, transportation,test and trial at site |
| 2 | Maintenace work of 75 HP, 3 phasekirloskar makemotor byopening, servicing, cleaning all movable parts, reinsulation, oiling, greasing and replacement of unserviciable parts if required, complete work done with cost of all material and labour, transportation, tools & tackle, refitting the same and give satisfactory test and trial at site |
| 3 | Maintenance work of 75 HP 3 phase 440 volt AutoTransformer by removing all burn out items and providing & fixing new transformercoils, terminal plates( Epoxy fiber glass materail), connections terminal leads if required , top up of transformer oil at required level etc, complete work done with all materials and labour, transportation, satisfactory test and trial at site |
| 4 | Maintenance workof 75 H.P. motor star delta starters, with Changing and rewiring of internal wiring,Taping luging, soldering in leads opening & fitting, replacment of controlar,coil , contractor, Indicator Lamp , Switches, as required all work,etc. complete work done with cost of material & labour at site. |
| 5 | Repair& Maintenance work ofIn It On Off Main switch Gear pannel with replacement of HRC Fuse 200 amp , 50 Hz, 415 volt, replacement of insulation of bus bar, Retapping of copper strip of bus bar, replacement ofvoltmeter 600 amp. volt with selector switches, replacement ofampere meter 500 amp. with CT coil and swiches, replacement ofconnections terminal leads if required and other necessary required work, etc. complete with material, labour & Transportation complete with satisfactory test & trial at site. |
| 6 | Repairwork of 35 HP Submersible Motor pump set by opening, winding, Fitting,Replacement of Thrust plate, Bearing, Reconditioning of Impeller by breazing etc. work as requiredwith material, labour & Transportation completewith satisfactory test & trial at site. |
| 7 | Repairwork ofATSand Star delta starter of 35 HP Motor work includes opening, Fitting, new wiring,removing all burn out items, replacment of controlar,coil , contractor, Indicator Lamp , Switches, Ampere and Volt Meterand providing & fixing new transformercoils, terminal plates ( Epoxy fiber glass materail), connections terminal leads if required , top up of transformer oil at required level etc, complete with material, labour & Transportation complete with satisfactory test & trial at site. |
| 8 | Supplying & fixing of fireextinguisher / refills as per IS specification ABC type duly refilled 6 Kg & ready to use |
| 9 | Supply of rubber mat 2 x 1.0 Mtr, 1100V tested |
| 10 | Supply of hand gloves 11KV tested |
| 11 | GST @ 18% |