Agra Municipal Corporation has published Tender For Hariparvat Zone, Shastripuram A-Block. Rcc Of The Boundary Wall Of The Damaged Drain Near The Power Substation. Reconstruction Work By 132 Kv In.. Submission Date for this Tender is 17-10-2022. Wall construction Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Providing of bandha for diversion of nala etc. all complete. |
2 | Providing of 32 HP diesel pump for dewatering of pond with pump, driver etc. all complete. (for 8 hours) |
3 | Removal of sludge, kankar, brick bats, organic or inorganic material in faul position or in liquid mud including lead 30m and 3.00 meter lift with specials T&P labour etc. all complete. |
4 | Cartage of silt, sludge kankar and other disposable organic material etc. all complete with labor T&P including cartage of 8 km. |
5 | Dismantling brick work or stone work in lime or Cement mortar and including stacking of material as directed by E/IC with in a distance of 60 meters (200 feet) but Mud Mortar. |
6 | Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. |
7 | R.C.C. work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C. Raft foundation and footing with 4 cm., Gauge approved stone ballast including all materials T&P. |
8 | R.C.C. work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 (1 Cement : 1.5 Coarse Sand : 3 Stone Grit)in R.C.C. column. |
9 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). |
10 | Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling). |
11 | Sub Total (A) |
12 | Add 12% G.S.T. of Sub Total (A) |
13 | Sub Total (B) |
14 | Add / Deduction For Estimate Figure Amount Match |
15 | Grand Total |